| Course | OL 342 Organizational Behavior |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment applying motivation, job design and fairness research to a specific group of employees and recommending changes |
| Length | About 1,200 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 342 Module 2
Fifteen Dollars an Hour on a Cold Chair: Motivating Seasonal Lift Operators at Cold Hollow Mountain
[Student Name]
Southern New Hampshire University
OL 342: Organizational Behavior
Motivation Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Fifteen Dollars an Hour on a Cold Chair: Motivating Seasonal Lift Operators at Cold Hollow Mountain
Introduction
Lift operators are the first employees most skiers meet and the last ones anyone thinks about. At Cold Hollow Mountain they load chairs, scan passes, shovel ramps and stop the lift when something goes wrong, for $15.25 an hour, about a dollar above Vermont's minimum wage. Last winter almost half of them quit before March. Module 1 argued that the job, not a generation, explains most of that pattern. This paper looks more closely at what drives or drains the effort of the people who stay, using research on job design, incentives and fairness, and recommends changes that a lift supervisor can actually make.
The Group and the Work
The resort hires about 140 seasonal operators each winter. Most are between 18 and 24, about a third live in the resort's staff bunkhouse and a growing share come on visas from South America and Eastern Europe. A shift lasts eight hours, typically at one of 11 lift stations, with a 30-minute lunch and two 10-minute breaks taken in a heated hut when someone can cover the station. Most operators stay at the same lift all day with one partner. Since the resort joined Alder Peaks' multi-resort pass, weekend lift lines on the main quad routinely reach 25 minutes, and guests frustrated by the wait take it out on the person scanning their pass.
How the Job Is Designed
Humphrey et al. (2007) combined nearly 260 studies of work design and found that motivational features of a job, such as autonomy, variety, significance and feedback, related to satisfaction, motivation and performance, and that social features, such as support from others and contact with people outside the job, added to what the task features explained, especially for satisfaction and intentions to quit. I rated the lift job on those features using a short survey of 31 current operators, on a 1-to-5 scale.
Lift operator job design ratings (1 = very low, 5 = very high)
| Feature | Average rating | What operators said |
|---|---|---|
| Task variety | 1.8 | "Load, scan, shovel, repeat" |
| Autonomy | 2.1 | "We can't even pick when we go on break" |
| Feedback from the job | 2.4 | "You only hear about it when something goes wrong" |
| Task significance | 3.6 | "If we mess up, someone gets hurt" |
| Social support | 2.2 | "Eight hours with one person, maybe two" |
| Contact with guests | 4.1 | "Mostly people yelling about the line" |
The job scores well on significance; operators know their work keeps people safe. It scores poorly on nearly everything else. The surprise is social support: operators described long shifts with a single partner and a supervisor they see twice a day on a snowmobile. That fits Humphrey and colleagues' finding that social features matter for whether people want to stay.
The Proposed Bonus
Alder Peaks' regional office has proposed paying lift operators an extra $1 an hour, retroactive, if they finish the season on April 15. Cerasoli et al. (2014), reviewing 40 years of research, concluded that enjoying the work and being paid for results each forecast performance, and that the two did not simply cancel out: pay-for-results said more about how much got done, enjoyment said more about how well, and enjoyment counted for less wherever the payout hinged directly on the measured output. A completion bonus rewards quantity in the plainest sense, showing up until April, which is exactly what we need. But it does nothing for the quality of the work, such as patience with guests or careful ramp maintenance, and a single payment at the very end offers little help in February, when most quits happen. Operators I surveyed said, in effect, that a payment they might never see did not feel real.
What Feels Fair
Colquitt et al. (2001), pooling a quarter century of studies of fairness on the job, found that people judge fairness on several distinct grounds: whether outcomes are fair, whether the procedures that decide them are fair, whether they are treated with respect and whether decisions are explained honestly, and that each grounds predicted different attitudes and behaviors. Two rules fail those tests. Lift assignments are made by a supervisor each morning with no stated rule, and operators believe returning staff and bunkhouse residents get the quieter beginner lifts. And the proposed bonus would be lost entirely by an operator who leaves on April 10 for a family emergency, which several operators described as "a trap" rather than a reward.
Recommendations
Recommended changes
| Cause | Change | Rough cost per season |
|---|---|---|
| Low variety | Rotate each operator between two lifts and a ticket-scanning post during each shift | None; scheduling only |
| Breaks depend on luck | Two relief operators per shift cover warming breaks on a timetable | About $52,000 |
| Unfair-seeming assignments | Weekly shift-bid board, ranked by days worked, posted in the bunkhouse and online | None |
| Little support | Supervisors walk each lift station at least four times per shift | Supervisor time |
| Bonus felt unreachable | Pay the $1 an hour in three stages: January 15, March 1 and season end, with exceptions for documented emergencies | About $84,000, as proposed |
The relief operators are the largest new cost, but at roughly $1,500 to recruit and train each replacement operator, preventing about 35 quits would cover it.
What Operators Asked For
The survey ended with an open question: "If you could change one thing about this job, what would it be?" Of the 31 answers, 12 named breaks, usually the chance to warm up on a predictable schedule rather than when a supervisor happened to drive by. Nine named the crowds and the abuse that comes with them, and several suggested a staff member walking the line on busy weekends to explain wait times so the operator at the gate is not the only target. Six named housing. Only four named pay first. That ranking does not mean money is unimportant to people earning $15.25 an hour; it means that the conditions of the job are so present in their day that they crowd out everything else when operators are asked what would help.
Risks and Trade-Offs
Rotation could create gaps in safety knowledge, since each lift has its own quirks; the plan limits each operator to two lifts they have been trained on. A shift-bid board ranked by days worked favors returning staff, which may feel unfair to first-season international workers, so one weekend shift in three will be assigned by lottery. And staged bonus payments cost the resort money for operators who later leave, but that is the point: paying in January rewards the weeks already worked and gives people a reason to reach the next payment.
Measuring Results
I will compare the share of operators who quit before March 1 with last season's 46 percent, repeat the six-item design survey in late February and track complaints logged against lift staff. A target of under 30 percent quitting before March would show the changes are working.
Conclusion
The lift job asks people to stand in the cold, alone, absorbing other people's frustration, with little say over when they rest. Money helps, but only if it arrives while it can still change someone's mind. The cheapest fixes, rotation, visible fair rules and supervisors who show up, address the parts of the job that drain motivation in the first place.
References
Cerasoli, C. P., Nicklin, J. M., & Ford, M. T. (2014). Intrinsic motivation and extrinsic incentives jointly predict performance: A 40-year meta-analysis. Psychological Bulletin, 140(4), 980-1008. https://doi.org/10.1037/a0035661
Colquitt, J. A., Conlon, D. E., Wesson, M. J., Porter, C. O. L. H., & Ng, K. Y. (2001). Justice at the millennium: A meta-analytic review of 25 years of organizational justice research. Journal of Applied Psychology, 86(3), 425-445. https://doi.org/10.1037/0021-9010.86.3.425
Humphrey, S. E., Nahrgang, J. D., & Morgeson, F. P. (2007). Integrating motivational, social, and contextual work design features: A meta-analytic summary and theoretical extension of the work design literature. Journal of Applied Psychology, 92(5), 1332-1356. https://doi.org/10.1037/0021-9010.92.5.1332
What the OL 342 Module 2 instructions ask for
The OL 342 Module 2 assignment has students explain the motivation of a specific group of employees and recommend practical ways to strengthen it. You will usually describe the group and its work, apply at least two motivation approaches from the course, such as job design, expectancy, goal setting or equity and justice, and propose changes. A good paper treats motivation as something the job and the organization shape rather than a fixed trait people bring with them, and it tests one tempting answer, often more money, against the evidence rather than accepting or rejecting it outright. Graders look for a clear link between each recommendation and a cause identified in the analysis, and for a plan to check whether the changes worked. APA style with a title page and at least three scholarly sources is expected.
How this OL 342 Module 2 motivation assignment example is built
The sample examines seasonal lift operators at Cold Hollow Mountain, an imagined northern Vermont resort owned by a national resort group, who earn $15.25 an hour for eight-hour shifts outdoors. It rates the job against the work design features in Humphrey and colleagues' meta-analysis and finds low variety, little feedback and almost no contact with co-workers during a shift. It weighs management's proposed $1-an-hour bonus for finishing the season against a 40-year meta-analysis showing incentives raise the quantity of work while intrinsic motivation drives its quality. It then checks shift assignment and bonus rules against research on fairness at work. Recommendations include rotation between lift and scanning posts, relief operators who cover warming breaks, an open shift-bid board and a bonus paid in three stages.
Where the OL 342 Module 2 rubric puts the points
Rubrics for this OL 342 assignment usually allot points to describing the group accurately, applying motivation theories correctly, diagnosing causes rather than symptoms, making recommendations that follow from the diagnosis, considering costs and side effects and writing clearly in APA style. The best OL 342 papers make the reader feel the job: the cold, the boredom and the angry guest at minute forty of a weekend line. Scores drop when a paper lists theories in turn without applying them, recommends pizza parties or slogans, assumes money either solves everything or nothing, or skips fairness questions that workers themselves raise. Papers also lose ground when they offer no measure, such as quit rates or a short survey, for judging whether the changes did any good.
OL 342 Module 2 help: the mistakes that cost points
Spend a shift, or at least an hour, watching the work you are writing about and list what workers actually do minute by minute. Score the job on variety, autonomy, feedback and contact with co-workers; low scores usually point to the most practical fixes. If management favors a bonus, ask what it rewards: showing up, finishing the season or doing the job well, since those are different behaviors. Check whether the rules for who gets the best shifts or the bonus feel fair to the people under them, and ask some of them. Make each recommendation answer one cause, add a cost estimate and decide how you will measure the result. Keep claims about research modest, and cite the studies you lean on accurately.
Get OL 342 Module 2 written to your instructions
Send the OL 342 Module 2 instructions and describe the group of workers you are writing about. We analyze their job's design, weigh any pay or incentive idea against motivation research, check the rules that govern their work for fairness and recommend changes a supervisor could test this term. Your first OL 342 motivation paper is complimentary, with a draft back in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 342 papers and related BS Business Administration samples
- OL 342 Module 1 Discussion: Individual Behavior and Job Attitudes
- OL 342 Module 3 Milestone One: Group Dynamics Analysis
- OL 342 Module 4 Discussion: Intergroup Dynamics
- OL 342 Module 5 Milestone Two: Organizational Structure and Culture Analysis
- OL 342 Module 6 Power and Politics Assignment: Power, Influence and Organizational Politics
- OL 342 Module 7 Final Project: Organizational Behavior Analysis
- OL 342 Module 8 Discussion: Employee Voice and Silence
- PSY 270 Module 7 Leadership and Teams Discussion: A night shift with no leader
- ACC 405 Module 7 Project Two: Forming, Growing and Dissolving a Sugarmakers' Partnership
- FIN 330 Module 2 Financial Statement Analysis Assignment: What the Ratios Say About the Ice Machine Maker
- MKT 410 Module 2 Measurement Plan Assignment: Building a Digital Measurement Plan
OL 342 Module 2 questions, answered
Where can I find a free OL 342 Module 2 motivation assignment sample?
This page holds the complete OL 342 Module 2 paper, which looks at motivating seasonal ski lift operators through job design, incentives and fair rules.
What are the job characteristics that motivate employees?
Task features such as variety, autonomy, significance and feedback, along with social features such as support from co-workers and supervisors, all relate to satisfaction and motivation.
Do bonuses kill intrinsic motivation?
Usually not. Four decades of pooled studies showed pay incentives and inner interest operating side by side, with incentives tied more to output volume and inner interest more to the care taken over the work.
What is organizational justice?
Employees' sense of fairness at work, covering fair outcomes, fair procedures for deciding them and respectful, honest treatment by those who apply the rules.
How can a manager motivate seasonal workers on low pay?
Fix the parts of the job that drain people, make schedules and rewards fair and visible, add contact and feedback and tie any bonus to behaviors that matter.