OL 342 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 342 Module 1 Discussion sample asks whether a workplace problem comes from the people in a job or from the job itself. SNHU OL 342 (OL-342) opens its BS Business Administration course in organizational behavior with an individual-level question like this one. The writer supervises seasonal lift operators at Cold Hollow Mountain, a composite northern Vermont ski resort where 46 percent of the crew quit before March. The general manager blames a generation that "doesn't want to work." The post weighs research on personality, job satisfaction and broad job attitudes, argues that the job shapes much of the attitude and asks classmates for a similar case.

CourseOL 342 Organizational Behavior
ModuleModule 1
Paper typeundergraduate discussion post introducing a workplace and explaining an individual behavior problem through personality and job attitude research
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 342 Module 1

1

Module One Discussion

Who Quits the Lift Line, and Why

For OL 342 I am studying Cold Hollow Mountain, a ski resort in northern Vermont where I have worked five winters and now supervise lift operations. We have about 160 year-round staff and roughly 1,100 at the peak, including 140 seasonal lift operators. Two seasons ago the resort was bought by Alder Peaks Resort Group, a Denver company that owns 14 mountains, and our lift tickets now come bundled into its multi-resort pass. Weekend visits rose by about 30 percent the first winter.

What this page is doingThe mountain and my job.
2

Last season 46 percent of our lift operators quit before March 1, more than double the rate three winters ago. Our general manager has an explanation he repeats at every meeting: young people today do not want to work. It is a tempting story because the people quitting are mostly between 18 and 24. But it is a story about individuals, and the numbers changed far faster than a generation could.

What this page is doingThe problem everyone has an opinion about.
3

Personality does matter. Barrick and Mount (1991), pooling studies across five occupational groups, found that conscientiousness, being dependable, organized and persistent, related to performance in every group they examined, while the other traits mattered only for some jobs. So some operators will always outlast others. But job attitudes carry a lot of weight too. Judge et al. (2001), reviewing more than 300 samples, estimated the true correlation between job satisfaction and performance at about .30. Harrison et al. (2006) went further, showing that a broad attitude toward one's job, satisfaction and commitment together, predicted a whole cluster of behaviors at once: effort, helping, lateness, absence and leaving. That is exactly the cluster we see on the lift line.

What this page is doingWhat the research supports, and what it doesn't.
4

The job changed before the people did. Weekend lift lines got longer and angrier after the pass arrived, operators stand outside for eight hours at temperatures that can sit below zero and the staff housing they were promised fills by November. I think we are hiring the same kinds of people we always did and then giving them a job that turns a reasonable attitude sour by February. Personality explains who leaves first; the job explains why so many leave at all.

What this page is doingMy conclusion so far.
5

Have you seen a manager blame individuals for a problem that the job itself was creating? What changed, or what would have had to change, for the pattern to stop?

What this page is doingA question back to the class.
6

References

Barrick, M. R., & Mount, M. K. (1991). The Big Five personality dimensions and job performance: A meta-analysis. Personnel Psychology, 44(1), 1-26. https://doi.org/10.1111/j.1744-6570.1991.tb00688.x

Harrison, D. A., Newman, D. A., & Roth, P. L. (2006). How important are job attitudes? Meta-analytic comparisons of integrative behavioral outcomes and time sequences. Academy of Management Journal, 49(2), 305-325. https://doi.org/10.5465/amj.2006.20786077

Judge, T. A., Thoresen, C. J., Bono, J. E., & Patton, G. K. (2001). The job satisfaction-job performance relationship: A qualitative and quantitative review. Psychological Bulletin, 127(3), 376-407. https://doi.org/10.1037/0033-2909.127.3.376

What the OL 342 Module 1 instructions ask for

Module 1 of OL 342 introduces organizational behavior at the level of the individual and asks students to introduce the workplace they will study during the term. Expect to describe the organization and your role, name a behavior that matters there, such as quitting, absence, effort or helpfulness, and explain it with research on personality, attitudes or job satisfaction. The prompt is less interested in a textbook definition of organizational behavior than in whether you can see a familiar problem through the field's lens. Posts that do well are specific about the numbers and the people involved, separate what belongs to individuals from what the job or the organization contributes and keep claims about research within what the studies found. Two replies are usually required, each adding a new angle rather than praise.

How this OL 342 Module 1 discussion example is built

The sample introduces Cold Hollow Mountain, an imagined resort in northern Vermont with about 1,100 workers at the winter peak, and a lift operations supervisor in his fifth season there. Forty-six percent of last winter's seasonal lift operators quit before March, and the general manager blames young workers' attitudes. The writer checks that view against three studies: a meta-analysis showing conscientiousness predicts performance across job families, a review linking job satisfaction to performance and a study showing that a broad job attitude predicts a cluster of behaviors that includes leaving. He concludes that the job, including crowded weekend lift lines since the resort joined a multi-mountain pass, explains more than the generation does, and invites peers to name a job that soured good workers.

Where the OL 342 Module 1 rubric puts the points

In the first OL 342 discussion, the grading rubric generally credits a clear description of the workplace and the behavior, accurate use of research on individual differences and attitudes, analysis that separates individual causes from situational ones, a link to the course's levels of analysis and replies that extend the conversation. Strong OL 342 posts test a popular explanation instead of repeating it. Marks fall away for a post that is mostly definitions, for treating personality as the whole story, for a research summary that overstates a modest correlation and for replies that only agree. OL 342 graders also watch for posts that describe a workplace so vaguely that classmates cannot respond to anything concrete, so give numbers, roles and one incident.

OL 342 Module 1 help: the mistakes that cost points

Pick one behavior you can count, such as quits, sick calls or complaints, and give the figure. Describe the job as the people in it experience it: hours, pay, weather, customers, supervisors. Then state the explanation managers usually give and test it. Personality research shows real but moderate effects, so use it to explain differences between people rather than a pattern across a whole crew. Job attitude research explains why a job that frustrates many people shows up as quitting, lateness and low effort together. Be careful with numbers from studies: a correlation of .30 is meaningful but leaves most of the variation unexplained. Close by inviting OL 342 classmates to name a case of their own, and in replies ask what the job itself was like.

Get OL 342 Module 1 written to your instructions

Paste the OL 342 Module 1 prompt and say briefly which job or employer you will follow this term. We write an introduction that names one behavior problem, tests the obvious explanation against research on personality and job attitudes and ends with a question your classmates can take back to their own jobs. The first OL 342 discussion draft is on us, with delivery inside two working days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 342 papers and related BS Business Administration samples

OL 342 Module 1 questions, answered

Where can I find a free OL 342 Module 1 Discussion sample?

The full OL 342 Module 1 post is on this page: a ski resort lift supervisor asks whether high seasonal quitting comes from the workers or from the job.

Does personality predict job performance?

Yes, modestly. A well-known meta-analysis found conscientiousness related to performance in every occupational group it studied, while other traits mattered only in some jobs.

Are satisfied workers better performers?

On average, somewhat. Pooling over 300 samples, one review put the corrected link between liking one's job and doing it well near .30: real, yet leaving most of the variation to other causes.

What is a job attitude in organizational behavior?

An evaluation of one's job, such as satisfaction or commitment, that combines feelings and beliefs and shapes behaviors like effort, attendance and whether people stay.

Why do seasonal employees quit mid-season?

Common causes include pay that does not cover the season's costs, harsh conditions, conflict with customers, poor scheduling and little support from supervisors, alongside individual circumstances.