| Course | OL 342 Organizational Behavior |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment analyzing the sources of power, influence tactics and political behavior in a workplace dispute and recommending an effective, ethical approach |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 342 Module 6
The Bunkhouse Fight: Power, Influence and Politics at Cold Hollow Mountain
[Student Name]
Southern New Hampshire University
OL 342: Organizational Behavior
Power and Politics Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Bunkhouse Fight: Power, Influence and Politics at Cold Hollow Mountain
Introduction
In October, a memo from Alder Peaks' regional office informed Cold Hollow Mountain's managers that the staff bunkhouse, 96 beds in a converted 1970s lodge a quarter mile from the base area, would close after the coming season and be renovated as budget guest rooms. Within two weeks the plan had been discussed at a town select board meeting and in the county newspaper, though no one at the resort admitted talking to either. This paper analyzes the dispute as a contest of power and influence, considers what it is costing the people caught in the middle and recommends how it should be resolved.
The Parties and Their Interests
The regional vice president oversees four eastern mountains and is measured on their combined earnings. His interest is clear: the renovated building is projected to earn about $640,000 a year, and Alder Peaks has asked its regions to grow lodging revenue. The general manager has run Cold Hollow for 19 years, including under the previous owners. His interest is staffing the mountain; about a third of seasonal staff live in the bunkhouse, and the county has a rental vacancy rate below 1 percent. The town select board wants the resort to keep hiring locally and fears seasonal workers will crowd into housing that local families need. The 96 residents, mostly young and many on work visas, stand to lose their beds yet have no seat in the talks. The human resources manager and I, as a supervisor of many residents, are in between.
Sources of Power
Sources of power in the bunkhouse dispute
| Party | Main sources of power | Main limits |
|---|---|---|
| Regional vice president | Formal authority over capital spending; control of the regional budget; access to Denver | Little local knowledge or relationships; depends on the general manager to run the mountain |
| General manager | Nineteen years of relationships in town and on staff; expert knowledge of hiring; control of local information | Reports to the vice president; can be replaced |
| Select board | Permitting authority over the renovation; public platform | No authority over the resort's operations |
| Bunkhouse residents | Their labor; the resort cannot run without them | Short tenure, visas tied to the job, little organization |
| Human resources manager | Hiring data and exit interview records | Reports to both the general manager and a Denver HR director |
The table shows why the dispute has gone underground. The vice president holds authority but lacks local information and relationships; the general manager holds those but not authority. Each is using what he has.
Influence Tactics
Yukl and Tracey (1992), surveying managers and the subordinates, peers and bosses they tried to influence, reported that arguing from facts and logic, appealing to people's values and asking for their input won genuine buy-in most often, whereas demands, ganging up and citing rules or rank won it least and frequently provoked pushback. The vice president has relied on legitimating, presenting the conversion as company policy, and on pressure, setting a deadline for the general manager's "implementation plan." The general manager has used a coalition, enlisting the select board and a reporter, which works outside the organization and around his own boss. Neither has yet used rational persuasion in earnest. The vice president's revenue figure has not been set against the cost of losing staff, and the general manager has made his case in town rather than in a written analysis to Denver. By Yukl and Tracey's evidence, both have chosen the tactics least likely to produce commitment from the other.
What the Politics Is Costing
Chang et al. (2009), combining studies of employees' perceptions of organizational politics, found that seeing one's workplace as political was linked to more strain and turnover intentions, lower job satisfaction and commitment and somewhat lower performance, with strain and lower morale carrying much of the effect. The costs are already visible. Residents have heard rumors of eviction since the newspaper story, and four returning staff have told me they will not come back next winter without guaranteed housing. Two department heads have stopped raising staffing problems with the regional office, assuming the matter is decided. Rumor has filled the space left by an open process.
Political Skill and Ethics
Ferris et al. (2005) built and validated an 18-item scale of political skill with four parts, reading people shrewdly, swaying them, building networks and coming across as sincere, and treated it as a capacity some managers have far more of than others. The general manager has plenty of political skill, but using it behind his boss's back risks his credibility with Denver and turns a business question into a public fight. The vice president lacks local networks and is treating a decision about people's homes as a capital item. An ethical approach would use the general manager's skill openly, giving the people affected a voice and keeping the argument on evidence.
Recommendation
I recommend that the general manager and human resources manager propose a joint housing review to the vice president within two weeks, with three steps. First, a written analysis that sets the lodging revenue against the cost of replacing staff: at about $1,500 per seasonal hire and an expected loss of 60 to 70 returning workers, plus the cost of unfilled shifts, the gap narrows sharply. Second, consultation with residents through two open meetings and a short survey, so their needs appear in the analysis rather than in the newspaper. Third, a set of options to bring to Denver together, including converting half the building, partnering with the town on new workforce housing or keeping the bunkhouse and raising lodging revenue elsewhere. This approach replaces pressure and back-channel coalitions with persuasion and consultation, the tactics most likely to produce a decision both sides will actually carry out.
Conclusion
Power at Cold Hollow is split between people who hold authority and people who hold knowledge and relationships. When those groups fight through deadlines and back channels, the people with the least power pay first. The bunkhouse decision can still be made well if the argument moves from the select board and the newspaper to a table where both kinds of power, and the residents, are present.
References
Chang, C.-H., Rosen, C. C., & Levy, P. E. (2009). The relationship between perceptions of organizational politics and employee attitudes, strain, and behavior: A meta-analytic examination. Academy of Management Journal, 52(4), 779-801. https://doi.org/10.5465/amj.2009.43670894
Ferris, G. R., Treadway, D. C., Kolodinsky, R. W., Hochwarter, W. A., Kacmar, C. J., Douglas, C., & Frink, D. D. (2005). Development and validation of the political skill inventory. Journal of Management, 31(1), 126-152. https://doi.org/10.1177/0149206304271386
Yukl, G., & Tracey, J. B. (1992). Consequences of influence tactics used with subordinates, peers, and the boss. Journal of Applied Psychology, 77(4), 525-535. https://doi.org/10.1037/0021-9010.77.4.525
What the OL 342 Module 6 instructions ask for
The Module 6 assignment in OL 342 asks students to analyze power and politics in a real or realistic workplace situation. You will identify the people or groups involved, explain where each one's power comes from, describe the influence tactics they use and assess the political behavior around the decision, including its effects on others. Most versions also ask for a recommendation: how should a manager, or the writer, act to influence the outcome effectively and ethically? Strong papers avoid treating politics as simply bad, since organizations are full of legitimate competing interests, and they ground claims about tactics and consequences in research rather than in intuition. Specific dialogue, documents or events make the analysis credible, and the recommendation should name tactics, not just values.
How this OL 342 Module 6 power and politics assignment example is built
The sample analyzes the dispute over Cold Hollow Mountain's 96-bed staff bunkhouse. Alder Peaks' regional vice president plans to renovate it as budget guest lodging, citing $640,000 a year in projected revenue, while the local general manager, who believes losing it would cripple hiring in a county with almost no rentals, has quietly briefed the town's select board and a reporter. The paper maps each party's power, from budget authority to local relationships, and classifies their tactics using Yukl and Tracey's study of which tactics produce commitment. It uses a meta-analysis on perceived organizational politics to show the costs already visible among staff, draws on research on political skill and recommends a joint proposal built through consultation and evidence.
Where the OL 342 Module 6 rubric puts the points
Rubrics for the OL 342 power and politics assignment tend to reward accurate identification of power sources, correct classification of influence tactics, balanced analysis of each party's interests, attention to the effects of political behavior on employees and the organization, a recommendation that is both practical and ethical, and research used precisely. The top OL 342 papers show why each actor's behavior makes sense from that actor's position. Points are deducted when a paper casts one side as the hero, labels every influence attempt manipulation, confuses formal authority with power in general, ignores people who are affected but have no seat at the table or recommends "open communication" without saying who should say what, to whom and when.
OL 342 Module 6 help: the mistakes that cost points
List everyone with a stake in the decision, including people with no formal role, such as the employees who live in the housing. For each, name their sources of power: position, control of money or information, expertise, relationships inside or outside the organization. Then describe what each has actually done, and classify the tactics: rational persuasion, consultation, coalitions, pressure, appeals to authority and so on. Research suggests some tactics win commitment and others only compliance or resistance, so judge them by that standard as well as by ethics. Look at what the conflict is costing bystanders. Recommend a path that uses legitimate tactics, names the people involved and treats the other side's interests as real.
Get OL 342 Module 6 written to your instructions
Tell us about the dispute or decision you are analyzing and attach the OL 342 Module 6 instructions. We map each party's sources of power, name the influence tactics in play, assess the political climate and its costs and recommend a course that is both effective and ethical, all in APA style. Your first OL 342 power and politics paper is free and ready in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 342 papers and related BS Business Administration samples
- OL 342 Module 1 Discussion: Individual Behavior and Job Attitudes
- OL 342 Module 2 Motivation Assignment: Motivation and Job Design
- OL 342 Module 3 Milestone One: Group Dynamics Analysis
- OL 342 Module 4 Discussion: Intergroup Dynamics
- OL 342 Module 5 Milestone Two: Organizational Structure and Culture Analysis
- OL 342 Module 7 Final Project: Organizational Behavior Analysis
- OL 342 Module 8 Discussion: Employee Voice and Silence
- BUS 210 Module 6 Organizational Structure Assignment: Redesigning a pet chain's structure
- SPT 465 Module 2 Market Selection Assignment: Finland, Estonia, Germany or Japan
- MKT 229 Module 7 Final Project: The Integrated Marketing Communications Plan
- MKT 270 Module 2 Prospecting Plan Assignment: A Territory of 410 Auto Shops
OL 342 Module 6 questions, answered
Where can I find a free OL 342 Module 6 power and politics sample?
The complete OL 342 Module 6 paper is on this page: a fight over a ski resort's staff housing, with power sources, influence tactics and a recommendation.
What are the sources of power in organizations?
Formal position and authority, control over resources and information, expertise, personal relationships and networks, and the ability to reward or sanction others.
Which influence tactics work best?
A study of managers found rational persuasion, inspirational appeals and consultation most likely to win commitment, while pressure and coalition tactics more often met resistance.
Is organizational politics always bad?
Not always; competing interests are normal. But research finds that when employees see a lot of self-serving politics, strain rises and satisfaction, commitment and performance tend to fall.
What is political skill?
The ability to read people and situations, influence others, build networks and appear sincere, which helps people pursue goals at work in ways others accept.