| Course | OL 342 Organizational Behavior |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post reflecting on employee voice, silence and exit and what managers can do to hear concerns before people leave |
| Length | About 410 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 342 Module 8
Module Eight Discussion
When Nobody Seems to Be Listening
Over eight modules I have written about lift operators who quit, a patrol that stopped reporting hazards, night crews who fought instead of planning and a housing fight that went to the newspaper. Rereading those papers, I notice that one thing happened in every one of them. People saw a problem, said little or nothing to anyone who could fix it and then, in many cases, left.
Morrison (2014), reviewing research on voice and silence, described voice as choosing to raise suggestions or concerns with someone higher up, and silence as holding them back, and concluded that people quietly run two tests before raising anything: will it change something, and will it cost me? Detert and Burris (2007), studying more than 3,000 employees and over 200 managers in a restaurant chain, found that a boss who visibly welcomed ideas did more to get staff talking than an inspiring boss did, and that this worked because staff then judged it safe to talk. It also mattered most for the best performers, the people a business can least afford to lose.
Griffeth et al. (2000) updated an earlier pooled analysis of why people quit and found that saying one meant to leave, actually hunting for jobs, low satisfaction and weak attachment to the employer foretold departures best, while age, gender and similar traits told almost nothing. Put together, these studies describe the path I watched. Operators unhappy with lift assignments did not see a manager who wanted to hear it, so they said nothing, grew less satisfied and started looking. By February, quitting was the only message anyone in Denver was going to read.
I have to be honest. In December, three operators told me the morning lift assignments felt rigged toward bunkhouse residents. I told them I would look into it and then let it go, because raising it meant questioning another supervisor and I was not sure anyone above us cared. I did exactly what Morrison describes: I judged it unsafe and pointless, so I stayed silent. Two of those three operators left in January. Next season I will post lift assignments with the rule used to make them and bring every unresolved staff concern to the monthly forum, in writing, under my own name.
Think of a time you saw a problem at work. What made you speak up or stay quiet, and what could a manager have done to change your choice?
References
Detert, J. R., & Burris, E. R. (2007). Leadership behavior and employee voice: Is the door really open? Academy of Management Journal, 50(4), 869-884. https://doi.org/10.5465/amj.2007.26279183
Griffeth, R. W., Hom, P. W., & Gaertner, S. (2000). A meta-analysis of antecedents and correlates of employee turnover: Update, moderator tests, and research implications for the next millennium. Journal of Management, 26(3), 463-488. https://doi.org/10.1177/014920630002600305
Morrison, E. W. (2014). Employee voice and silence. Annual Review of Organizational Psychology and Organizational Behavior, 1, 173-197. https://doi.org/10.1146/annurev-orgpsych-031413-091328
What the OL 342 Module 8 instructions ask for
The last OL 342 discussion usually asks students to reflect on the course by examining one behavior pattern in depth, often employee voice, silence or turnover, and what it means for them as present or future managers. You will connect research to what you have seen at work, consider your own role and say what you would do differently. Reflection is the point: the prompt rewards a writer who notices their own part in a problem, not only other people's. Strong posts bring in two or three studies, describe them accurately, apply them to a specific episode and end with a commitment that could be checked. Replies should ask classmates about the conditions that made speaking up feel safe or unsafe for them.
How this OL 342 Module 8 discussion example is built
The sample comes from a lift operations supervisor at Cold Hollow Mountain, a composite northern Vermont resort, looking back on a winter when staff saw problems, from a fallen rope line to an unfair shift system, said little and then left. It draws on Morrison's review of employee voice and silence, Detert and Burris's study of more than 3,000 restaurant employees showing that managers' openness predicted speaking up because it made people feel safe, and a meta-analysis of what predicts quitting. The writer argues that leaving is often the last form of voice, admits he heard complaints about lift assignments and passed none of them up, commits to a specific change and asks classmates what made them speak up or stay quiet.
Where the OL 342 Module 8 rubric puts the points
Instructors grading the final OL 342 discussion tend to look for a clear focus on one behavior, accurate use of research, honest reflection that includes the writer's own conduct, links to earlier course concepts, a concrete commitment and replies that send OL 342 classmates back to their own workplaces. The most thoughtful OL 342 reflections treat silence as a reasonable response to a situation rather than a character flaw. Marks drop for a summary of the whole course with no focus, for reflection that blames only others, for research mentioned by title without a finding or for a closing promise too vague to test. Replies earn less when they praise a classmate's honesty without asking what would have made speaking up easier for that classmate.
OL 342 Module 8 help: the mistakes that cost points
Pick one behavior from the course that you saw play out this term, and stay with it. Find two or three studies that explain it and state what each found in a sentence, with its limits. Then tell one specific episode from your work in which the behavior happened, and include what you did or failed to do. Ask why it made sense for people, including you, to act that way at the time. Connect it to concepts from earlier modules, such as job design, group norms or structure. End with one commitment you could actually check in three months. In replies, ask a classmate what a manager could have done that would have changed their choice.
Get OL 342 Module 8 written to your instructions
Paste the Module 8 prompt from OL 342 and a few notes on what you observed at your workplace this term. We draft a reflective post that connects research on voice, silence and leaving to your own experience, including your part in it, and ends with a question OL 342 classmates can answer from their jobs. The first closing post costs nothing and is ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 342 papers and related BS Business Administration samples
- OL 342 Module 1 Discussion: Individual Behavior and Job Attitudes
- OL 342 Module 2 Motivation Assignment: Motivation and Job Design
- OL 342 Module 3 Milestone One: Group Dynamics Analysis
- OL 342 Module 4 Discussion: Intergroup Dynamics
- OL 342 Module 5 Milestone Two: Organizational Structure and Culture Analysis
- OL 342 Module 6 Power and Politics Assignment: Power, Influence and Organizational Politics
- OL 342 Module 7 Final Project: Organizational Behavior Analysis
- MKT 229 Module 8 Discussion: What Winter Glow Taught the Garden
- ACC 430 Module 5 Forecasting Assignment: A Seasonal Forecast of Monthly Sales
- MKT 311 Module 5 Milestone Two: The Mobile Channel Mix and Budget
- BUS 496 Module 1 Discussion: Setting Learning Goals for a Client Project
OL 342 Module 8 questions, answered
Where can I find a free OL 342 Module 8 Discussion sample?
This page carries the full OL 342 Module 8 reflection: a ski resort supervisor looks at why staff stayed silent about problems and then quit.
What is employee voice?
Communicating suggestions, concerns or information about problems to someone higher in the organization, by choice rather than as a required duty.
Why do employees stay silent at work?
Common reasons are fear of looking bad or being punished, a belief that speaking up will not change anything and leaders who seem closed to input.
Does manager openness make employees speak up?
A study of more than 3,000 employees in a restaurant chain found managers' openness was consistently related to speaking up, largely because it made employees feel safe.
What predicts employee turnover?
A large meta-analysis found that quit intentions, job search, job satisfaction and commitment were among the strongest predictors, while most demographic characteristics predicted little.