OL 328 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This OL 328 Module 3 Milestone One sample analyzes a leadership challenge in depth: what is happening, why and what kind of leadership the situation calls for. SNHU OL 328 (OL-328) places this diagnosis in Module 3 so that BS Business Administration students understand the problem before they design any leadership response. The setting is the Eastside Branch of the Riverbend Public Library, a composite Ohio branch whose manager of 23 years has retired. The milestone reviews turnover, safety incidents, sick leave and survey results, traces the problems to a team built around one leader, weighs research on transformational, servant and situational leadership and ends with a challenge statement for the plan.

CourseOL 328 Leadership
ModuleModule 3
Paper typeundergraduate milestone analyzing a leadership challenge in an organization, its causes and the leadership it calls for
LengthAbout 1,080 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 328 Module 3

1

A Branch After Its Leader Left: A Leadership Challenge Analysis for the Eastside Branch

[Student Name]

Southern New Hampshire University

OL 328: Leadership

Milestone One: Leadership Challenge Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingTurnover, incident and survey figures here describe a fictional branch invented for OL 328.
2

A Branch After Its Leader Left: A Leadership Challenge Analysis for the Eastside Branch

Introduction

The Eastside Branch's manager of 23 years retired in June. In the months since, the branch has shown signs of strain that predate her departure but that her presence held in check. This milestone describes the challenge with evidence, examines how leadership has worked at the branch, weighs research on leadership approaches and ends with a statement of the challenge and the questions my leadership plan must answer.

What this page is doingFrames the challenge.
3

The Evidence

Eastside Branch indicators

IndicatorTwo years agoLast 12 months
Staff turnover14%27%
Safety incidents reported (threats, fights, medical emergencies, overdoses)3861
Sick leave days per full-time staff member6.28.3
Staff agreeing "I feel safe at work" (annual system survey)71%52%
Staff who say they understand what is expected of them84%63%

The numbers worsened during the predecessor's final year, as she cut back her hours before retiring, and have continued since. In six months a grant-funded makerspace opens, and its tools are ones nobody on staff has ever operated.

What this page is doingDescribes the situation.
4

What Staff and Exit Interviews Say

Exit interviews with five staff who left in the past year and a staff meeting I held in my second week produced a consistent picture. The branch has become harder to work in: more patrons in crisis, more incidents with no security guard on weekday afternoons and more demands on desk staff to act as social workers. Staff felt protected by the former manager, who handled every serious incident herself. As she cut back her hours, no one else had the authority or practice to step in. One circulation staff member said, "When she was here, we knew she'd come. Now we don't know who will."

What this page is doingAdds the human picture.
5

How Leadership Worked

The former manager led through personal presence. She made most decisions herself, handled every difficult patron, set the schedule and resolved disputes. Staff loved her, and the branch ran well while she was there. But leadership was concentrated in one person. No supervisor below her had authority to act in a crisis. Department heads coordinated with her rather than with each other. When she was absent, the branch had no leadership structure. Her strengths, availability, judgment and care, created the very dependence that left the branch exposed when she left.

What this page is doingExamines the system of leadership.
6

What Research Says About Approaches

Judge and Piccolo (2004), pooling results from dozens of samples, reported that leading by vision and personal attention to followers, and contingent reward, which sets clear expectations and recognizes people who meet them, each moved in step with followers' contentment, their drive and their verdict on the leader's effectiveness, and the plain exchange approach came out almost level with the inspirational one. Laissez-faire leadership, absent when needed, was harmful. The branch's recent experience, with no one stepping in, resembles the effects of leadership absence.

Hoch et al. (2018), in a meta-analysis comparing newer approaches with transformational leadership, reported that measures of ethical and authentic leadership told them almost nothing that a transformational measure had not already captured, whereas servant leadership, with its focus on followers' growth and welfare, still accounted for a real share of outcomes once transformational ratings were held constant. For a team that needs both clear expectations and support through hard work, servant leadership combined with clear structure looks promising.

Situational leadership theory, popular in workplace training, tells a leader to dial direction and support up or down according to how ready each follower is. Thompson and Vecchio (2009), testing several versions of the theory, found little support for its matching rules, with modest support only for giving more structure to newer employees. That is a useful caution: the makerspace staff will need structure while they learn, but the model as a whole should not drive the plan.

What this page is doingApplies leadership research.
7

Whose Needs Come First

The analysis also points to different needs across the team. Circulation and adult services staff, who handle most incidents, need safety, backup and clear procedures. Children's and teen staff, more settled, need room to lead their own programs. Newer staff, a growing share because of turnover, need structure and training. Volunteers need clear roles and appreciation. A single style for everyone would serve some well and others poorly.

What this page is doingConsiders the people being led.
8

What the Makerspace Adds

The makerspace is a second test arriving before the first is solved. The state grant pays for two 3D printers, a laser cutter, sewing machines and a small recording booth, and it requires the branch to offer at least ten hours of open lab time each week by the end of its first year. None of the current staff has run equipment like this, and the laser cutter brings real safety rules: ventilation, supervision of teen users and a lockout when no trained person is present. If the makerspace is run the way the branch has been run, with every question carried to the manager's office, it will add one more stream of decisions to a single person. If it is designed from the start with its own trained leads and its own procedures, it could become the first part of the branch that runs on shared leadership rather than on one personality.

What this page is doingConsiders the change already coming.
9

What Happens if Nothing Changes

The system's human resources office estimates that replacing a librarian or library associate costs about a fifth of annual salary once recruiting, training and lost productivity are counted. At the branch's current turnover rate, that implies roughly $45,000 a year in replacement costs, before counting overtime for the shifts left uncovered. Sick leave has risen by about two days per person, which adds to the overtime bill. The less visible cost falls on patrons: fewer experienced staff at the desk means more incidents escalate, which in turn drives more staff away. Leaving the problem to settle on its own is not a neutral choice.

What this page is doingEstimates the cost of drift.
10

The Challenge Statement

When its manager retired, the Eastside Branch was left with no one else who led, and the strain of more difficult work has turned that loss into rising turnover, more incidents and less clarity about expectations. The challenge is to build leadership that does not depend on one person, gives staff safety and support in hard moments and prepares the branch for new services. The leadership plan must answer four questions. How can authority to act in a crisis be shared? What structure and expectations do staff need? How can the manager support staff without taking over? And how will leadership be developed in others so the branch is not this exposed again?

What this page is doingDefines what the plan must address.
11

References

Hoch, J. E., Bommer, W. H., Dulebohn, J. H., & Wu, D. (2018). Do ethical, authentic, and servant leadership explain variance above and beyond transformational leadership? A meta-analysis. Journal of Management, 44(2), 501-529. https://doi.org/10.1177/0149206316665461

Judge, T. A., & Piccolo, R. F. (2004). Transformational and transactional leadership: A meta-analytic test of their relative validity. Journal of Applied Psychology, 89(5), 755-768. https://doi.org/10.1037/0021-9010.89.5.755

Thompson, G., & Vecchio, R. P. (2009). Situational leadership theory: A test of three versions. Leadership Quarterly, 20(5), 837-848. https://doi.org/10.1016/j.leaqua.2009.06.014

What the OL 328 Module 3 instructions ask for

In OL 328, Milestone One centers on a leadership challenge facing a real organization or team. You will describe the situation and its effects on people and performance, analyze why it exists, considering how leadership has been exercised, and examine which leadership approaches the research supports for this kind of situation. OL 328 challenge analyses that score well use evidence such as turnover, surveys, incident records and interviews, look at the system of leadership rather than blaming or praising one person, weigh research on leadership approaches critically, including approaches whose popularity outruns their evidence, and finish with a clear challenge statement and the questions the leadership plan must answer.

How this OL 328 Module 3 milestone one example is built

The sample analyzes the Eastside Branch of the Riverbend Public Library, a composite Ohio branch, in the months after its manager of 23 years retired. Staff turnover has risen to 27 percent, staff reported 61 safety incidents in the past year, sick leave is up by a third and a makerspace opens in six months. Survey results and exit interviews show a team that relied on one leader for direction and protection. A pooled study by Judge and Piccolo comparing inspirational and exchange-based styles, Hoch and colleagues' finding that servant leadership adds explanatory power beyond transformational leadership and Thompson and Vecchio's test of situational leadership theory guide the analysis, which ends with a challenge statement and four questions for the leadership plan.

Where the OL 328 Module 3 rubric puts the points

Instructors marking this OL 328 milestone look for a clear description of the leadership challenge with evidence, analysis of causes in how leadership has worked, critical use of research on leadership approaches, attention to the people being led, a focused challenge statement and organized prose with sources. The most convincing OL 328 milestones show how the previous leader's strengths created dependence as well as success. Milestones lose credit for blaming or idealizing one leader, presenting no evidence, applying a popular model without checking its research support, ignoring followers' perspectives or proposing a plan before the challenge is fully understood. A milestone that measures the branch's problem against a baseline from before the leader left, as the turnover and safety figures do here, makes the later OL 328 targets far easier to defend.

OL 328 Module 3 help: the mistakes that cost points

Describe the situation with evidence: turnover, absences, incidents, survey results, performance data and what people say in interviews or exit conversations. Ask how leadership has worked: who made decisions, who handled problems, who people turned to. Look for strengths that also created weaknesses, such as dependence on one person. Then read the research on leadership approaches that might fit, and weigh how strong the evidence is for each, especially for popular models. Consider what the people being led need. Close with a challenge statement and three or four questions your leadership plan must answer, and save the solutions for the next milestone. Put a rough cost on doing nothing, even an estimate, so the reader sees that the challenge is worth a plan.

Get OL 328 Module 3 written to your instructions

Send the brief for Milestone One in OL 328 and what you know about the leadership situation you are studying. We describe the challenge with evidence, trace its causes in how leadership has worked, weigh which leadership approaches research supports for the situation and write a challenge statement for your plan. Your first OL 328 milestone is free and ready two days after you ask. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 328 papers and related BS Business Administration samples

OL 328 Module 3 questions, answered

Where can I find a free OL 328 Module 3 Milestone One sample?

You can read the full OL 328 Milestone One here: a library branch after its leader retired, with turnover, safety incidents and a makerspace on the way.

What is transformational leadership?

Leadership that inspires followers with a vision, gives them individual attention and challenges them to think in new ways, which research links to satisfaction and effectiveness.

Does servant leadership add anything beyond transformational leadership?

A meta-analysis found servant leadership explained additional variance in outcomes beyond transformational leadership, unlike ethical and authentic leadership, which overlapped heavily with it.

Is situational leadership theory supported by research?

Tests of its prescriptions have found limited support, mainly for giving more structure to new or inexperienced employees.

Why analyze a leadership challenge before planning?

Because the right approach depends on the causes, the situation and the people being led, which a careful analysis reveals.