| Course | OL 125 Human Relations in Administration |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post applying motivation theory to a workplace incentive and proposing a better approach |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 125 Module 4
Module Four Discussion
Pizza for Perfect Attendance
Four months ago, Merrimack Commons began a monthly pizza party for evening aides with perfect attendance. The first month, five of sixteen aides qualified. Since then the number has been four, three and five. Call-outs are unchanged at about three a night. Last month two aides who had each missed one shift to care for a sick child sat in the break room while the others ate. One told me, "So the lesson is don't have kids."
The party assumes aides call out because nothing rewards them for coming in. Deci et al. (2017), reviewing decades of research on self-determination theory at work, concluded that people stay motivated when work lets them make some choices, build skill over time and form real bonds with coworkers, and that rewards experienced as controlling can undermine it. The party controls without supporting any of the three needs. It also rewards the absence of a problem, not the care aides take pride in. And because some aides can never qualify in a month when a child is sick, it tells them the reward was never meant for them.
Hackman and Oldham (1976) found that people were more motivated and satisfied in jobs that used a range of skills, let them finish whole pieces of work, clearly mattered to others, allowed freedom in how to do the work and showed them how well they were doing. Aide work is full of significance; a resident's whole evening depends on it. What it lacks is autonomy, since assignments are handed down, and feedback, since good work goes unnoticed. Harter et al. (2002) linked engaged units to lower turnover, and engagement grows from exactly those missing pieces.
Let aides choose their hallway rotation each month within fair rules, so no one gets memory care every night. Create a paid peer mentor role for experienced aides to train new hires. Replace the party with specific recognition: a note naming what someone did, such as calming a resident who was sure her husband was coming. Keep the pizza, but for everyone, after a hard week.
Have you seen an incentive at work backfire? What did it assume about why people work?
References
Deci, E. L., Olafsen, A. H., & Ryan, R. M. (2017). Self-determination theory in work organizations: The state of a science. Annual Review of Organizational Psychology and Organizational Behavior, 4, 19-43. https://doi.org/10.1146/annurev-orgpsych-032516-113108
Hackman, J. R., & Oldham, G. R. (1976). Motivation through the design of work: Test of a theory. Organizational Behavior and Human Performance, 16(2), 250-279. https://doi.org/10.1016/0030-5073(76)90016-7
Harter, J. K., Schmidt, F. L., & Hayes, T. L. (2002). Business-unit-level relationship between employee satisfaction, employee engagement, and business outcomes: A meta-analysis. Journal of Applied Psychology, 87(2), 268-279. https://doi.org/10.1037/0021-9010.87.2.268
What the OL 125 Module 4 instructions ask for
This OL 125 discussion usually asks you to apply motivation theory to a real workplace, often by evaluating an incentive, a reward program or a supervisor's approach. Expect to describe the practice, explain what it assumes about why people work and compare that assumption with research. Strong posts use a specific theory, such as self-determination theory or the job characteristics model, to explain what employees did in response, recognize that different employees may be motivated by different things and propose changes that are realistic for a supervisor to make. They avoid assuming that money or prizes are the only levers and connect motivation to results such as attendance or turnover.
How this OL 125 Module 4 discussion example is built
The sample examines a monthly pizza party at Merrimack Commons, a composite assisted living community, for evening aides with perfect attendance. After four months, call-outs are unchanged at about three a night, and two aides who missed a shift to care for sick children called the party a punishment. Deci, Olafsen and Ryan's review of self-determination theory explains that lasting motivation comes from autonomy, competence and relatedness, Hackman and Oldham's job characteristics model points to the parts of aides' work that carry meaning and Harter, Schmidt and Hayes's evidence links engagement to turnover. The post proposes chosen hallway rotations, a peer mentor role and specific recognition by name. It keeps the pizza, but for the whole shift after a hard week.
Where the OL 125 Module 4 rubric puts the points
Marks in this OL 125 motivation discussion usually reflect accurate use of a motivation theory, a clear description of the practice and how employees responded, a reasoned explanation of why it worked or failed, a practical alternative and replies that extend the discussion. The best posts show what an incentive assumes about people and test that assumption against what employees did. Posts lose credit when they summarize a theory without applying it, assume one reward fits everyone, recommend raises a supervisor cannot give as the only answer or reply to classmates with general agreement instead of a related example or question.
OL 125 Module 4 help: the mistakes that cost points
Describe one incentive or practice your workplace uses to motivate people, and what happened after it started. Ask what it assumes: that people work for prizes, for approval, for the work itself? Then pick a theory and apply it. Under self-determination theory, does the practice support or undermine people's sense of choice, skill and connection? Under the job characteristics model, does the job offer variety, meaning, autonomy and feedback? Use evidence of employees' reactions. Propose a change a supervisor could make with little money. End by asking classmates about an incentive that backfired, and reply with a theory that might explain theirs. Ask two or three employees what would make them want to come in; their answers are evidence.
Get OL 125 Module 4 written to your instructions
Send the Module 4 prompt for OL 125 and the incentive or motivation problem you want to discuss. We apply motivation theory to what employees actually do, explain why the current approach works or fails and propose changes built on what moves people, and pose a question that draws out classmates' own incentive stories. The first OL 125 motivation post is free and usually ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 125 papers and related BS Business Administration samples
- OL 125 Module 1 Discussion: Why Human Relations Matter
- OL 125 Module 2 Communication Analysis Assignment: Communication Breakdown at Shift Change
- OL 125 Module 3 Milestone One: Human Relations Problem Analysis
- OL 125 Module 5 Milestone Two: Conflict and Teamwork Plan
- OL 125 Module 6 Diversity and Inclusion Assignment: Diversity and Inclusion on a Work Team
- OL 125 Module 7 Final Project: Human Relations Improvement Plan
- OL 125 Module 8 Discussion: Reflecting on Human Relations Skills
- ACC 345 Module 4 Project One: A DuPont Analysis and Performance Report
- ACC 405 Module 7 Project Two: Forming, Growing and Dissolving a Sugarmakers' Partnership
- FIN 355 Module 1 Discussion: Naming the Risks in One Household
- ACC 425 Module 1 Discussion: Where the Interview Fits in a Fraud Investigation
OL 125 Module 4 questions, answered
Where can I find a free OL 125 Module 4 Discussion sample?
The complete OL 125 Module 4 post appears on this page: why a pizza reward for perfect attendance failed at a composite assisted living community.
What is self-determination theory?
A theory holding that durable motivation comes from feeling some choice, growing skill and real connection with others at work, while controlling rewards can weaken it.
What is the job characteristics model?
Hackman and Oldham's model linking five features of a job, including how much it matters to others, how much freedom it allows and how much feedback it gives, to meaningful work, responsibility and knowledge of results, and through them to motivation and satisfaction.
Why do attendance rewards sometimes backfire?
They can feel controlling or unfair, especially when absences have good reasons, and they reward the absence of a problem rather than the work people care about.
How can supervisors motivate without raises?
By giving choice where possible, building skills and responsibility, recognizing specific good work and connecting employees with the people their work helps.