| Course | HRM 300 Creating the Employee Experience |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate milestone presenting an employee listening plan and its findings |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Human Resource Management |
| Updated | October 2026 |
Free sample paper for HRM 300 Module 3
Employee Listening at Tidewater Inn Group: Design and First Findings
[Student Name]
Southern New Hampshire University
HRM 300: Creating the Employee Experience
Milestone One
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Employee Listening at Tidewater Inn Group: Design and First Findings
Introduction
The journey map showed where new housekeepers decide to leave, but it covered one group and one stretch of time. Before Tidewater Inn Group can design improvements for all 880 employees, it needs a reliable way to hear from them. This milestone reviews the company's old approach, describes a redesigned listening system and reports the first round of findings.
The Old Approach
Tidewater's annual survey had seventy-two questions, was offered only in English on a desktop link sent by email and took about twenty-five minutes. Only 58 percent of employees responded, and response among housekeepers was about 35 percent, since many do not use work email. Results reached hotel managers three months later as company averages, and employees saw no summary. Managers could not see their own hotel's results, so none felt responsible for them. In follow-up conversations, several housekeepers said they had stopped answering because nothing changed.
The Redesigned System
The new system has four parts. First, an annual survey of twenty questions, available in English, Spanish and Haitian Creole, taken by phone through a text link or on tablets in break rooms during paid time. Second, a five-question pulse survey each quarter on the issues the annual survey finds most important. Third, stay interviews: managers hold a structured fifteen-minute conversation with employees of a year or more about why they stay and what might make them leave. Fourth, a monthly review of exit data, including the timing and reasons for every departure. Questions were written to cover one idea each, in plain words, with a balanced five-point scale. Krosnick (1999) reviews evidence that survey answers are shaped by question wording, order and respondent effort, and that shorter, clearly worded questions reduce careless answers.
Who Responded
Response rose to 64 percent overall. Housekeeping response more than doubled, to 71 percent, mainly because of the tablets and the Spanish and Haitian Creole versions. Front desk response was 62 percent, food and beverage 57 percent and maintenance 66 percent. To protect identities, HR suppressed results for any team under ten respondents and kept raw answers away from hotel managers.
Findings by Group
Selected survey results, percent agreeing
| Item | Housekeeping | Front desk | Food and beverage | Maintenance |
|---|---|---|---|---|
| I have the tools and supplies I need to do my job | 38 | 64 | 59 | 52 |
| My schedule is posted early enough to plan my life | 31 | 58 | 47 | 74 |
| My workload is fair | 36 | 55 | 51 | 63 |
| My supervisor shows real concern for me | 66 | 69 | 62 | 71 |
| I am paid fairly for my job | 41 | 46 | 58 | 49 |
| I would recommend Tidewater as a place to work | 49 | 64 | 63 | 72 |
| I plan to be working here a year from now | 52 | 67 | 61 | 78 |
Housekeeping scores lowest on almost every item except supervisor care, which is close to other groups. Food and beverage staff rate pay higher because of tips but scheduling low. Maintenance is the most positive group.
What Drives Intent to Stay
Each item was correlated with agreement that the employee plans to be working at Tidewater in a year. The strongest relationships were schedule predictability, at about 0.46, workload fairness at 0.41 and supervisor support at 0.39; pay fairness was lower, at about 0.28. Correlations do not prove cause, but they show where improvements are most likely to matter. Synthesizing hundreds of studies of perceived organizational support, Kurtessis et al. (2017) tied the sense of being valued by one's employer to stronger commitment and weaker plans to quit, and traced that sense largely to fair treatment and backing from supervisors. Schedules and workload are, in effect, the daily evidence housekeepers use to judge whether Tidewater cares.
Stay Interviews and Exit Data
Stay interviews with forty employees who had been at Tidewater five years or more gave a consistent picture. They stayed because of coworkers they liked, supervisors who let them swap shifts or leave early for a sick child and, in food and beverage, good tips. Mitchell et al. (2001) showed that being embedded in a job, through ties to coworkers, a good fit and what one would give up by leaving, forecast staying better than satisfaction did, and these employees describe exactly that kind of web. A year of exit data confirmed the survey: schedules and workload were the top two reasons given by housekeepers, and departures peaked in the first ninety days.
Sharing and Acting
Within three weeks of the survey closing, each hotel manager will share their hotel's results with staff in short meetings, in all three languages, and post a one-page summary in break rooms. Each hotel will choose two items to work on, with at least one from the top drivers, and report progress in the quarterly pulse. Company-wide, the next milestone will build an improvement plan around schedule predictability, workload and supplies.
Differences Among Hotels
Results also varied by hotel, which matters because each hotel manager controls much of the daily experience. At the two Hilton Head properties, where seasonal swings are largest, only 22 percent of housekeepers agreed that schedules came early enough, compared with 41 percent at the Charleston hotel with the steadiest occupancy. One Savannah hotel scored far higher than the others on supplies, 61 percent, because its executive housekeeper had added a supply runner on weekends, a practice the other hotels could copy at little cost. These differences show that the problems are not fixed features of hotel work; managers in the same company, facing similar demand, produce noticeably different experiences, and the best practices already exist inside Tidewater.
Limits
Thirty-six percent of employees did not respond, and nonrespondents could hold views unlike those who answered. The driver analysis uses correlations within one survey, so some relationships may reflect general mood. Stay interviews depend on managers' skill in listening; HR will train managers and sit in on a sample.
Conclusion
Tidewater's employees, especially housekeepers, say the experience breaks down in schedules, workload and supplies, and those same issues are most closely tied to whether they plan to stay. The listening system now reaches every group and gives the company a way to track whether its changes work.
References
Krosnick, J. A. (1999). Survey research. Annual Review of Psychology, 50, 537-567. https://doi.org/10.1146/annurev.psych.50.1.537
Kurtessis, J. N., Eisenberger, R., Ford, M. T., Buffardi, L. C., Stewart, K. A., & Adis, C. S. (2017). Perceived organizational support: A meta-analytic evaluation of organizational support theory. Journal of Management, 43(6), 1854-1884. https://doi.org/10.1177/0149206315575554
Mitchell, T. R., Holtom, B. C., Lee, T. W., Sablynski, C. J., & Erez, M. (2001). Why people stay: Using job embeddedness to predict voluntary turnover. Academy of Management Journal, 44(6), 1102-1121. https://doi.org/10.5465/3069391
What the HRM 300 Module 3 instructions ask for
Milestone One in HRM 300 usually asks you to assess the current employee experience in an organization, often by designing or evaluating ways of listening to employees. Expect to describe methods such as surveys, focus groups, stay and exit interviews and existing data, explain how you ensured honest and representative responses, present findings by group and identify the factors that most affect outcomes such as engagement or intent to stay. Many versions ask how results will be communicated. A strong milestone uses several methods, designs questions carefully, reaches every group including those who speak other languages, analyzes results rather than listing them and plans visible action.
How this HRM 300 Module 3 milestone one example is built
The sample replaces Tidewater's long annual survey, completed by 58 percent of employees, with a twenty-question survey in English, Spanish and Haitian Creole, taken on phones or break-room tablets, which reached 64 percent. Only 38 percent of housekeepers agreed they had the supplies they needed, and 31 percent that schedules were posted early enough to plan their lives. A driver analysis found schedule predictability, workload fairness and supervisor support were more closely tied to intent to stay than pay. Stay interviews with forty employees of five or more years pointed to coworkers and flexible supervisors, and a year of exit data confirmed schedules and workload as top reasons for leaving, especially in the first ninety days.
Where the HRM 300 Module 3 rubric puts the points
The milestone rubric commonly scores the design of listening methods, attention to response quality and inclusion, the presentation of findings, the depth of analysis, the identification of key drivers and the plan for sharing and acting on results. High-scoring milestones combine surveys with interviews and data, break results down by group, use analysis to rank what matters and commit to visible action. Points are lost for surveys with leading or double-barreled questions or scales that tilt toward agreement, for results presented only as company-wide averages, for ignoring groups that are hard to reach and for listening efforts with no plan to respond.
HRM 300 Module 3 help: the mistakes that cost points
Begin with what was wrong with how the organization listened before, such as long surveys, low response or results nobody saw. Design questions that ask about one thing at a time in plain language, and offer them in the languages employees speak and on devices they use. Combine methods: surveys show patterns, interviews explain them and exit and stay data test them. Break results down by job group, since averages hide the groups in trouble. Use a simple analysis, such as correlating each item with intent to stay, to rank what matters most. End with how results will be shared and what will change, since employees stop answering surveys that lead nowhere, and note the limits of your data.
Get HRM 300 Module 3 written to your instructions
Upload the HRM 300 Milestone One guidelines and any survey or exit data you can share. We design the survey, interviews and data review, present results by group, find the drivers of staying and plan how to act on them. About two days; your first milestone costs nothing. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More HRM 300 papers and related BS Human Resource Management samples
- HRM 300 Module 1 Discussion: Experience Is More Than Engagement
- HRM 300 Module 2 Journey Mapping Assignment: A Housekeeper's First Ninety Days
- HRM 300 Module 4 Discussion: Stable Schedules for Hourly Staff
- HRM 300 Module 5 Milestone Two: An Improvement Plan for the Moments That Matter
- HRM 300 Module 6 Recognition Assignment: Thanks, Rest and Belonging
- HRM 300 Module 7 Final Project: An Employee Experience Strategy for Tidewater
- HRM 300 Module 8 Discussion: Proving the Return
- MKT 355 Module 1 Discussion: Posting Is Not a Strategy
- QSO 330 Module 8 Discussion: Nearshoring Cabinet Boxes for Resilience
- OL 317 Module 4 Discussion: Financing Small Business Growth
- FIN 340 Module 2 Investment Vehicles Assignment: Reading a 401(k) Fund Menu and Its Fees
HRM 300 Module 3 questions, answered
Where can I find a free HRM 300 Module 3 Milestone One sample?
The full HRM 300 Module 3 milestone is on this page, with an employee listening system, survey redesign and driver analysis for a hotel group.
What is employee listening?
The set of methods an organization uses to learn about employees' experience, such as surveys, pulse checks, focus groups, stay and exit interviews and operational data.
What is a stay interview?
A structured conversation with a current employee about why they stay and what might lead them to leave, held before problems become resignations.
What is driver analysis in employee surveys?
An analysis that identifies which survey items are most strongly related to an outcome such as engagement or intent to stay, to show where action matters most.
How do you improve employee survey response rates?
Keep surveys short, offer them in employees' languages and on their devices, protect confidentiality and show that past results led to action.