HRM 300 Creating the Employee Experience sample papers, module by module

Reviewed by Portia Lambrick, MBA

HRM 300 treats work as something employees experience from first application to last day, shaped by managers, schedules, tools and the place itself, and asks HR to design that experience on purpose. The samples below follow one hotel group as it listens to its frontline staff and rebuilds the moments that drive them away.

HRM 300 is SNHU’s Creating the Employee Experience course. It centers on designing the employee experience: experience versus engagement, journey mapping and moments that matter, employee listening through surveys and interviews, schedule stability for hourly staff, improvement planning, recognition, wellbeing and belonging, an experience strategy and its measurement and return. Every module below opens a full sample paper or takes a free request for one; searches like "hrm 300 module 3", "HRM300 sample paper" and "HRM 300 milestone example" land on this page.

What HRM 300 is really about

HRM 300 is SNHU's course on creating the employee experience, and the papers that earn the most credit start from what employees actually go through, gathered from data and conversations, rather than from programs HR would like to run. The best work names the moments that matter most, fixes them with specific changes and shows how the results will be measured.

The samples follow one composite employer: Tidewater Inn Group, which runs six hotels in Charleston, Savannah and Hilton Head with 880 employees in housekeeping, front desk, food and beverage and maintenance, where turnover runs above 70 percent a year and only about six in ten employees say they would recommend it as a place to work. The company and its figures are illustrative.

What HRM 300’s modules ask for

Across eight modules, HRM 300 commonly asks for discussions on what employee experience means, scheduling and measuring the return, an assignment mapping the employee journey, milestones on listening to employees and on an improvement plan, an assignment on recognition, wellbeing and belonging and a final employee experience strategy.

Where students lose points in HRM 300

HRM 300 work loses the most credit on experience plans built from perks rather than evidence: journey maps with no employee input, surveys with leading questions, programs such as wellness apps that do not touch the daily work and strategies that promise better engagement without a measure or a cost.

The HRM 300 drawers

Module 1

HRM 300 Module 1 Discussion example

The opening HRM 300 post separates employee experience from engagement using Tidewater Inn Group, six coastal hotels where turnover runs above 70 percent: after a weak engagement score, leaders threw staff parties and launched a values campaign, yet nothing changed, because housekeepers still faced short-notice schedule changes, carts missing supplies and sixteen rooms a shift; the post treats engagement as the result and experience as the daily inputs, draws on business-unit engagement research and the job demands and resources model, and asks classmates which daily moment shapes their own work most. Full sample paper, read it free.

Read the sample →
Module 2

HRM 300 Module 2 Journey Mapping Assignment example

The journey mapping assignment follows a Tidewater Inn housekeeper from application to day ninety, drawing on interviews with fourteen housekeepers including five who left, two bilingual focus groups, a shadowed shift and HR data showing 45 percent of housekeeping exits come in the first ninety days; it charts each stage's actions, touchpoints, feelings and pain points, from a nine-day wait for a background check and a first day with no locker to a full sixteen-room quota after two days of shadowing, marks five moments that matter and lists the fixes they suggest, citing Rosenbaum and colleagues, Bauer and colleagues, and Allen, Bryant and Vardaman. Full sample paper, read it free.

Read the sample →
Module 3

HRM 300 Module 3 Milestone One example

The first milestone builds Tidewater Inn Group's listening system and reports what it heard: a shorter survey in English, Spanish and Haitian Creole taken on phones or break-room tablets lifted response from 58 to 64 percent; only 38 percent of housekeepers said they had the supplies they needed and 31 percent that schedules came early enough to plan their lives; driver analysis put schedule predictability, workload fairness and supervisor support ahead of pay in predicting intent to stay; stay interviews with forty long-serving staff and a year of exit data confirmed the pattern, citing Krosnick, Kurtessis and colleagues, and Mitchell and colleagues. Full sample paper, read it free.

Read the sample →
Module 4

HRM 300 Module 4 Discussion example

The fourth HRM 300 post asks whether Tidewater Inn Group should post schedules two weeks ahead and stop last-minute changes, even though neither South Carolina nor Georgia requires it; it cites a field experiment at a national retailer where steadier schedules raised sales and productivity, survey evidence linking unstable schedules to worse sleep and distress, and a study finding many workers would give up a fifth of their pay to avoid schedules set on short notice, then proposes a two-week posting with a flexible on-call pool and asks classmates what occupancy swings would break it. Full sample paper, read it free.

Read the sample →
Module 5

HRM 300 Module 5 Milestone Two example

The second milestone turns Tidewater Inn Group's listening results into an improvement plan: six changes ranked by impact and effort, from two-week schedules with a paid volunteer pool and a room quota that counts checkouts as one and a half rooms to weekend supply runners, deeper linen stock, ready-on-day-one onboarding and training for 48 supervisors; it costs about $440,000 in the first year against about $236,000 a year in avoided housekeeping turnover alone, starts with a six-month pilot at two hotels compared with the other four, and sets measures for each change, citing Holtom and colleagues, Rhoades and Eisenberger, and Hancock and colleagues. Full sample paper, read it free.

Read the sample →
Module 6

HRM 300 Module 6 Recognition Assignment example

The recognition and wellbeing assignment redesigns three parts of Tidewater Inn Group's experience: an employee-of-the-month plaque gives way to frequent, specific thanks from supervisors, guests and peers, backed by research on how gratitude motivates; a wellness app few used gives way to changes in the work itself, lighter carts, fitted sheets, paid breaks with somewhere to sit and counseling in Spanish, after a large workplace wellness trial found little effect on health; and belonging grows through bilingual leads, team huddles and a say in how each hotel works, each with a cost and a measure, citing Grant and Gino, Song and Baicker, and Shore and colleagues. Full sample paper, read it free.

Read the sample →
Module 7

HRM 300 Module 7 Final Project example

The final project sets out Tidewater Inn Group's employee experience strategy around one promise, a hotel job that fits a life, and six pillars: predictable schedules, fair workloads and working tools, a strong first ninety days, supportive supervisors, recognition, wellbeing and belonging built into the shift, and a listening system that keeps improving; six months of pilot results at two hotels, ninety-day retention up from 55 to 71 percent against little change elsewhere, justify rollout at a first-year cost of about $535,000 with payback in about two years, governed by a council with frontline seats and tracked on a short dashboard, citing Christian and colleagues, Edmondson, and Heskett and colleagues. Full sample paper, read it free.

Read the sample →
Module 8

HRM 300 Module 8 Discussion example

The closing HRM 300 post asks how Tidewater Inn Group can prove its employee experience strategy is paying off when the chief financial officer asks; it argues for comparing changed hotels with unchanged ones over the same months, counting only savings that can be traced, such as avoided replacement hires at about $4,000 each and lower overtime, and reporting guest results separately, cites a randomized scheduling study, methods for costing HR programs and research tying turnover to firm results, and asks classmates which benefit they would refuse to count. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a HRM 300 sample the right way

Read an HRM 300 sample by following one employee group, housekeepers, from the journey map through the listening results to the changes in the final strategy. For HRM 300, send your organization or case and rubric; the first custom sample is free and usually takes about two days.

HRM 300 questions, answered

What does HRM 300 cover?

Designing the employee experience: journey mapping, listening to employees, onboarding, scheduling, recognition, wellbeing, belonging, improvement planning and measuring results.

What is the HRM 300 final project?

An employee experience strategy for an organization that brings together the journey map, listening results, improvement plan and programs with measures, costs and a timeline.

Is the hotel group in the HRM 300 samples real?

No. Tidewater Inn Group is fictional; its hotels, staff numbers and survey results were created so the course's eight samples tell one connected story.