HRM 300 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This HRM 300 Module 5 Milestone Two sample turns employee listening results into a practical plan for improving the experience. Module Five of SNHU HRM 300 (HRM-300) brings this second milestone, the point where BS Human Resource Management students move from diagnosis to design. For the composite Tidewater Inn Group, the plan restates the problems employees identified, ranks possible changes by their expected impact and the effort they require, describes six changes in detail, estimates their cost against the savings from lower turnover, proposes a pilot at two hotels with a comparison group and names a measure for every change.

CourseHRM 300 Creating the Employee Experience
ModuleModule 5
Paper typeundergraduate milestone presenting an employee experience improvement plan
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 300 Module 5

1

Employee Experience Improvement Plan for Tidewater Inn Group

[Student Name]

Southern New Hampshire University

HRM 300: Creating the Employee Experience

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingTidewater Inn Group does not exist; the plan's prices and savings are estimates made for teaching.
2

Employee Experience Improvement Plan for Tidewater Inn Group

Introduction

The listening work found that Tidewater's employees, especially housekeepers, are most frustrated by unpredictable schedules, unfair workloads and missing supplies, and that these issues, along with supervisor support, track most strongly with intent to remain. Housekeeping turnover runs about 84 percent a year, and 45 percent of departures come in the first ninety days. This milestone proposes a plan to change those experiences, estimates its costs and benefits and sets out how it will be tested.

What this page is doingFrom findings to action.
3

Ranking the Options

Fourteen possible changes came out of the journey map, the survey and the stay interviews, together with a workshop of housekeepers and supervisors from three hotels. Each was rated on expected impact, based on how closely it addressed a top driver, and on effort, meaning cost and difficulty. Some ideas with modest impact and high cost, such as new uniforms, were set aside. Others, such as a points-based recognition app, were moved to the next assignment on recognition. Six changes scored high on impact, and three of them are also low in effort.

Selected changes

ChangeDriver addressedImpactEffort
Two-week schedules, core days, volunteer poolSchedule predictabilityHighMedium
Checkout rooms count as one and a half; phased quota for new hiresWorkload fairnessHighMedium
Weekend supply runners and deeper linen stockTools and suppliesHighMedium
Day-one readiness, paid buddy, check-insEarly experience, supervisor supportHighLow
Supervisor training on scheduling, coaching and recognitionSupervisor supportMedium to highLow
Translated materials and bilingual leadsBelonging, clarityMediumLow
What this page is doingImpact and effort.
4

The Six Changes

Schedules will be posted two weeks ahead, each housekeeper's core days will be fixed for a month at a time and a volunteer pool will cover occupancy swings at a premium of two dollars an hour, with four hours' pay for shifts canceled less than a day ahead. The room quota will count checkout rooms, which take longer than stayovers, as one and a half rooms, and new housekeepers will clean eight rooms in their first solo week and twelve in their second. Each hotel will add a part-time weekend supply runner, a practice already working at one Savannah hotel, and linen stock will rise by one full set. Lockers, uniforms and badges will be ready before day one, each new hire will have a buddy paid $150 for the first two weeks and supervisors will sit down briefly with each newcomer at roughly days seven, thirty and sixty. All 48 housekeeping and front-of-house supervisors will complete two days of training on fair scheduling, coaching and recognition. Applications, orientation and key procedures will be available in Spanish and Haitian Creole.

What this page is doingWhat will happen.
5

Costs and Benefits

First-year cost

ItemCost
Schedule premiums and cancellation pay$40,000
Added housekeeping hours from the checkout weighting$125,000
Six part-time weekend supply runners$108,000
Additional linen stock, one time$90,000
Buddy stipends$39,000
Supervisor training$30,000
Translation$8,000
Totalabout $440,000

Recurring costs after the first year are about $350,000. The target is to cut housekeeping turnover from about 84 to 65 percent a year, which would avoid about 59 replacement hires annually at roughly $4,000 each in recruiting, training and lost productivity, or about $236,000. Hancock et al. (2013), in a meta-analysis, found that higher turnover was associated with lower firm performance, with stronger effects in service settings where customers notice, so lower turnover should also help guest satisfaction and the share of rooms ready at check-in, which are harder to value. The plan is not expected to pay for itself through turnover savings alone in the first year; it should pay back within about two years once guest results and lower overtime are included.

What this page is doingPaying for it.
6

Pilot and Rollout

The changes will start at two hotels for six months: one Hilton Head property, where schedule complaints are highest, and one Charleston property. The other four hotels will continue as they are and serve as a comparison. If the pilot hotels show better schedule and workload scores, higher ninety-day retention and no decline in room readiness, the plan will roll out to all six hotels over the following three months. Housekeepers at the pilot hotels will meet monthly with HR to adjust details, such as how the volunteer pool is called.

What this page is doingTest before spending everywhere.
7

Why These Changes Should Work

Holtom et al. (2008), reviewing turnover research, concluded that retention depends on many forces, including job demands, relationships with supervisors and how embedded people feel, and that effective retention efforts target the specific causes in a workforce. These changes target the causes Tidewater's own employees named. Rhoades and Eisenberger (2002) reviewed some seventy studies and concluded that people who believe their employer values them, a belief built by fair procedures, caring supervisors and decent conditions, show more commitment and quit less. Fixing the schedule, the quota and the cart are concrete signs of that support.

What this page is doingThe evidence.
8

Involving Managers and Employees

Plans designed in a head office often fail on the floor, so the details of each change will be worked out with the people who live with them. Executive housekeepers will set the volunteer pool's rules, such as how call-ins are offered fairly. Housekeepers will help decide which supplies the weekend runners stock first. Supervisors in the pilot will meet every two weeks with HR to report what is and is not working, and the first supervisor training session will be shaped by their answers. Hotel general managers, whose budgets carry the added hours, will sign off on the pilot in advance and see the comparison results monthly, so they own the decision on rollout rather than having it handed to them.

What this page is doingWho shapes the details.
9

Measures

Each change has a measure. Schedule predictability and workload fairness will be tracked through the quarterly pulse survey. Supply problems will be logged by supervisors daily. Ninety-day retention of new housekeepers, annual turnover, overtime hours, room readiness at check-in and guest cleanliness ratings will be compared between pilot and comparison hotels each month.

What this page is doingKnowing whether it worked.
10

Conclusion

The plan focuses on the few experiences employees said matter most, spends money where the evidence points and tests the changes before committing everywhere. Its cost is significant, but so is the cost of replacing most of the housekeeping staff each year.

What this page is doingA focused, tested plan.
11

References

Hancock, J. I., Allen, D. G., Bosco, F. A., McDaniel, K. R., & Pierce, C. A. (2013). Meta-analytic review of employee turnover as a predictor of firm performance. Journal of Management, 39(3), 573-603. https://doi.org/10.1177/0149206311424943

Holtom, B. C., Mitchell, T. R., Lee, T. W., & Eberly, M. B. (2008). Turnover and retention research: A glance at the past, a closer review of the present, and a venture into the future. The Academy of Management Annals, 2(1), 231-274. https://doi.org/10.5465/19416520802211552

Rhoades, L., & Eisenberger, R. (2002). Perceived organizational support: A review of the literature. Journal of Applied Psychology, 87(4), 698-714. https://doi.org/10.1037/0021-9010.87.4.698

What the HRM 300 Module 5 instructions ask for

Milestone Two in HRM 300 usually asks you to develop a plan to improve the employee experience based on evidence gathered earlier. Expect to identify priority problems, propose interventions, explain how each addresses the problem, estimate costs and benefits, lay out the timing and explain the measures. Many versions ask how you will involve employees and managers in shaping and testing the changes. A strong plan ranks options rather than proposing everything, ties each change to specific findings, is honest about costs and the time needed to pay them back, tests changes before rolling them out and sets measures for both the experience itself and outcomes such as retention.

How this HRM 300 Module 5 milestone two example is built

The sample ranks possible changes for Tidewater Inn Group by impact and effort and selects six: two-week schedules with fixed core days and a paid volunteer pool; a room quota that counts checkout rooms as one and a half and phases in for new hires; weekend supply runners and deeper linen stock; onboarding that has lockers, uniforms and a paid buddy ready on day one with check-ins at days seven, thirty and sixty; two days of training for 48 supervisors; and translated materials. The plan costs about $440,000 in its first year, against about $236,000 a year saved from lower housekeeping turnover alone, with payback expected in about two years. A six-month pilot at two hotels, compared with the other four, will test it.

Where the HRM 300 Module 5 rubric puts the points

The milestone rubric commonly scores the link between findings and interventions, the prioritization of options, the detail and feasibility of each intervention, the cost and benefit analysis, the implementation plan, the involvement of employees and managers and the measurement plan. High-scoring plans rank options, explain why each chosen change targets a top driver, give honest costs and payback, pilot before scaling and measure both experience scores and outcomes. Points are lost for long lists of initiatives with no priorities or owners, for interventions not tied to findings, for costs left out and for plans that measure only activity, such as training sessions held.

HRM 300 Module 5 help: the mistakes that cost points

Start from the top drivers found in your listening work and list every change that could address them. Then rank the list by expected impact and by effort or cost, and choose a handful. For each chosen change, say exactly what will happen, who will do it and what it will cost. Compare costs with realistic savings, such as fewer replacement hires, and be honest if payback takes more than a year. Test the changes in a few locations first and compare them with locations that have not changed. Involve employees in designing the details, and set measures for the experience itself and for outcomes like retention and customer ratings.

Get HRM 300 Module 5 written to your instructions

Send the HRM 300 Milestone Two guidelines and your listening results. We rank possible changes by impact and effort, detail the best ones with costs, plan a pilot with a comparison group and set measures for each. About two days; a first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 300 papers and related BS Human Resource Management samples

HRM 300 Module 5 questions, answered

Where can I find a free HRM 300 Module 5 Milestone Two sample?

The full HRM 300 Module 5 milestone is on this page, with an employee experience improvement plan for a hotel group, its costs, a pilot and measures.

How do you prioritize employee experience improvements?

Rank possible changes by their expected effect on the drivers that matter most and by the cost and effort they require, then choose a few high-impact options.

How do you estimate the return on an employee experience change?

Compare its cost with savings such as fewer replacement hires, lower overtime and better customer results, using realistic assumptions about how much turnover will fall.

Why pilot employee experience changes?

A pilot with a comparison group shows whether a change works before spending money everywhere, and reveals practical problems to fix.

What measures show whether an experience change works?

Survey items tied to the change, such as schedule predictability, plus outcomes such as ninety-day retention, turnover, overtime and customer ratings.