| Course | MKT 410 Digital Analytics |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment designing and analyzing an A/B test with a profit-based evaluation criterion |
| Length | About 1,100 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 410 Module 6
Free Shipping Over $60: Designing and Reading an A/B Test at Tug Hill Maple Company
[Student Name]
Southern New Hampshire University
MKT 410: Digital Analytics
A/B Test Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Free Shipping Over $60: Designing and Reading an A/B Test at Tug Hill Maple Company
The Problem and the Hypothesis
Milestone One found that half of all checkouts at Tug Hill Maple Company are abandoned, most often at the step where shipping costs first appear: $14.95 for a gift box and $8.95 for most other orders. The test asks whether telling shoppers earlier, and making shipping free on larger orders, would help. The hypothesis is that showing "Free shipping on orders of $60 or more" on product and cart pages will raise gross profit per visitor compared with the current practice.
Choosing What Counts as Success
Kohavi et al. (2009), drawing on years of running randomized tests on large websites, recommended defining an overall evaluation criterion before a test starts, a single measure that reflects long-term business value, and warned that short-term measures such as clicks can mislead. Conversion rate alone would be the wrong criterion here. Lewis et al. (2006), using data from an online retailer that had tried many shipping-fee schedules, found that consumers were very sensitive to shipping charges and that free shipping and threshold offers generated additional sales, but that the lost shipping revenue and the lack of response from several customer segments made such promotions unprofitable for that retailer. A free-shipping threshold could raise orders and still lose money. The criterion is therefore gross profit per visitor: product revenue times the 55 percent gross margin, minus any shipping cost the company absorbs, divided by sessions. Conversion rate, average order value and the share of orders above $60 are reported as supporting measures, and refund requests serve as a guardrail.
Design
Test design
| Element | Control (A) | Variant (B) |
|---|---|---|
| Shipping message | None until checkout | "Free shipping on orders of $60 or more" on product and cart pages |
| Shipping charge | $14.95 gift box; $8.95 other orders | Free at $60 or more; current rates below |
| Traffic split | 50% | 50% |
| Assignment | Random, by visitor, kept for the whole test | Random, by visitor, kept for the whole test |
Visitors are assigned by a cookie so that a returning shopper sees the same version each time. Showing someone free shipping on Monday and a charge on Wednesday would both annoy the shopper and contaminate the result.
Sample Size and Duration
With a baseline conversion rate of 2.4 percent, detecting a 15 percent relative improvement, to about 2.76 percent, with 80 percent power at a 5 percent significance level requires roughly 29,000 sessions per group. Detecting a 10 percent improvement would need more than twice that, which off-season traffic of about 15,000 sessions a month could not supply in any reasonable time. The test therefore runs for the four weeks from November 1 to November 28, when traffic is high, and stops on that date regardless of interim results. Running before the December peak protects the busiest weeks from an untested change.
Results
Test results, November 1 to 28
| Measure | Control (A) | Variant (B) |
|---|---|---|
| Sessions | 32,100 | 31,900 |
| Orders | 803 | 925 |
| Conversion rate | 2.50% | 2.90% |
| Average order value | $52.10 | $63.40 |
| Orders qualifying for free shipping | n/a | 648 (70%) |
| Shipping cost absorbed | $0 | $7,258 |
| Gross profit | $23,010 | $24,997 |
| Gross profit per visitor | $0.72 | $0.78 |
The split was close to even, 50.2 percent against 49.8 percent, so there is no sign of a sample ratio problem. Conversion rose from 2.50 to 2.90 percent, a relative increase of about 16 percent; a two-proportion test gives z of about 3.1 and a p-value of about 0.002. Average order value rose sharply, from $52.10 to $63.40, because many shoppers added a second item to reach $60. After the company absorbed $7,258 in shipping on qualifying orders, gross profit per visitor rose from about $0.72 to $0.78, or roughly 9 percent. A bootstrap of order-level profit put the 95 percent interval for that lift at roughly 1 to 18 percent, so the gain in profit is real but far less certain than the gain in conversion.
Interpreting the Results
The variant clearly changed behavior: more people bought and they bought more. The profit gain is smaller and less certain because shipping costs ate much of the extra margin, which is the pattern Lewis et al. (2006) warned about. If shipping rates rise, or if the threshold mainly pulls in orders that would have reached $60 anyway, the gain could disappear. Lewis and Rao (2015), analyzing 25 large advertising field experiments, showed that individual sales swing so widely that even very large samples leave the revenue effect of a campaign uncertain. Tug Hill's test was large for a small business but still leaves a wide interval around the profit effect, and one holiday month says little about how shoppers behave in May or August.
Guardrails
Three guardrail measures were watched alongside the main result. Refund and replacement requests stayed flat, at 0.6 percent of orders in the control group and 0.7 percent in the variant, so the larger orders did not bring more breakage or complaints. Customer service emails about shipping fell in the variant, which suggests the earlier message answered a question shoppers had been asking. The share of orders that were gift boxes was nearly identical in both groups, so the variant did not change what people bought so much as how much of it they bought. Had any guardrail worsened noticeably, the profit gain would have been weighed against it before any decision.
Threats to Validity
Four threats deserve mention. Seasonality: November shoppers are mostly gift buyers, and the effect may differ in spring. Novelty: shoppers may respond to a new message at first and less later. Cross-device behavior: someone assigned to one version on a phone might see the other on a laptop, which would blur the difference. Competitors' holiday promotions during the same weeks may have changed the baseline for both groups. None of these favors one group over the other in an obvious way, but each limits how far the result can be generalized.
Decision
The recommendation is to adopt the $60 threshold for the rest of the holiday season, since profit per visitor rose and no guardrail measure worsened, and to rerun the test in April with the threshold at $60 and at $75 to check whether the effect holds outside the gift season and whether a higher threshold keeps more of the margin.
Conclusion
The test showed that a free-shipping threshold raised conversion and order value significantly and raised profit per visitor by a smaller, less certain amount. Choosing profit rather than conversion as the criterion, as Kohavi and colleagues advise and as the shipping-fee research supports, kept the company from mistaking more orders for more money.
References
Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1
Lewis, M., Singh, V., & Fay, S. (2006). An empirical study of the impact of nonlinear shipping and handling fees on purchase incidence and expenditure decisions. Marketing Science, 25(1), 51-64. https://doi.org/10.1287/mksc.1050.0150
Lewis, R. A., & Rao, J. M. (2015). The unfavorable economics of measuring the returns to advertising. Quarterly Journal of Economics, 130(4), 1941-1973. https://doi.org/10.1093/qje/qjv023
What the MKT 410 Module 6 instructions ask for
The Module 6 assignment in MKT 410 usually asks you to design an A/B test or other experiment for a digital marketing decision, and often to analyze test results. Expect to state a hypothesis, define the control and variant, choose a primary metric, estimate the sample size and duration, analyze the outcome for statistical significance and recommend a decision. A strong assignment picks a success measure that reflects business value, not just clicks, sizes the test before running it, checks that the groups were split correctly and separates statistical significance from practical importance. It also names the threats to validity, such as seasonality, novelty effects and stopping a test early.
How this MKT 410 Module 6 a/b test assignment example is built
In the sample, Tug Hill Maple Company tests showing free shipping on orders of $60 or more on product and cart pages against its current practice of revealing shipping costs at checkout. Following Kohavi and colleagues, it chooses gross profit per visitor as the overall evaluation criterion, since Lewis, Singh and Fay found free-shipping offers can raise sales yet lose money. It sizes the test, runs it for four weeks in November with about 64,000 sessions and finds conversion rising from 2.50 to 2.90 percent and profit per visitor rising about 9 percent after shipping costs. Lewis and Rao's work on noisy outcomes frames the limits. Guardrail checks on refunds and shipping questions show nothing else got worse.
Where the MKT 410 Module 6 rubric puts the points
Experiment assignments are commonly graded on how clearly the hypothesis is stated, the choice of primary metric, the test design and sample size reasoning, the correctness of the statistical analysis, the interpretation of results for the business and the discussion of limitations and research. Strong assignments define success before the test starts, check the split between groups, report effect sizes with significance and turn results into a decision with costs included. Work loses credit for testing many changes at once without a plan, for declaring a winner from a few days of data, for reporting only conversion when profit matters and for overlooking seasonality. Guardrail measures reported beside the main result show careful judgment.
MKT 410 Module 6 help: the mistakes that cost points
Write the hypothesis as a cause and an expected effect on a measure, for example "showing a free-shipping threshold will raise profit per visitor." Choose one primary metric that reflects value to the business, and a few guardrails. Use a sample size calculator with your baseline rate and the smallest effect worth detecting, then work out how long the test must run. Decide the stopping rule in advance. When results arrive, check that each group received about half the traffic, test significance, compute the effect in dollars and state the decision along with its risks. Report your guardrail measures beside the main result so readers see the full picture.
Get MKT 410 Module 6 written to your instructions
Send the MKT 410 Module 6 rubric and the change you want to test, or the test data you were given. We write the hypothesis, choose the success measure, size the test, analyze results for significance and turn them into a business decision with research support. A first assignment is free and arrives within roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 410 papers and related BS Marketing samples
- MKT 410 Module 1 Discussion: What Digital Analytics Is For
- MKT 410 Module 2 Measurement Plan Assignment: Building a Digital Measurement Plan
- MKT 410 Module 3 Milestone One: Web Analytics Audit and Conversion Funnel
- MKT 410 Module 4 Discussion: Attribution and Channel Credit
- MKT 410 Module 5 Milestone Two: Customer Segmentation and Retention Analysis
- MKT 410 Module 7 Final Project: Digital Analytics Report and Recommendations
- MKT 410 Module 8 Discussion: Privacy and the Limits of Tracking
- HRM 300 Module 3 Milestone One: Listening to 880 Employees
- MKT 229 Module 7 Final Project: The Integrated Marketing Communications Plan
- MKT 311 Module 2 Mobile Audit Assignment: Auditing a Bike Share's Mobile Experience
- FIN 330 Module 7 Project Two: An Investment Proposal for the Board
MKT 410 Module 6 questions, answered
Where can I find a free MKT 410 Module 6 A/B Test Assignment sample?
The entire MKT 410 Module 6 assignment is published here: an A/B test of a free-shipping threshold for an online maple syrup seller.
What is an A/B test?
A controlled experiment in which visitors are randomly split between a current version and a changed version, so differences in outcomes can be attributed to the change.
Why use profit per visitor instead of conversion rate?
A change such as free shipping can raise conversion while reducing profit, so a measure that includes costs shows whether the change actually helps the business.
How long should an A/B test run?
Long enough to reach the sample size calculated in advance and to cover full weekly cycles, without stopping early when results first look significant.
What is a sample ratio mismatch?
A split between groups that differs noticeably from the planned ratio, which signals a problem with randomization or tracking that can invalidate results.