| Course | MKT 555 Social Media Marketing |
|---|---|
| Module | Module 7 |
| Paper type | graduate discussion post on how precisely paid social ads should target and personalize, and where targeting becomes intrusive |
| Length | About 400 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 555 Module 7
Module Seven Discussion
How Much Should an Ad Know About a Banjo Player?
An agency has pitched Laurel Fork Banjo Company a campaign that sounds clever: show ads to anyone who has watched a clawhammer lesson on video in the last 30 days and personalize the caption with the tune they watched, as in "Still working on Cluck Old Hen? Hear it on a Big Pine." The agency says personalized captions double click-through. I think Laurel Fork should take half of the idea.
Targeting by interest is not the problem. Goldfarb and Tucker (2011) ran thousands of display campaigns through a survey-based test and saw that ads fitted to the page they appeared on raised purchase intent, and so did ads that were visually obtrusive, but ads that did both performed worse than ads that did only one, with the drop strongest among people who declined to report their income and in product categories where privacy matters more. Being relevant was fine; being relevant and loud at once made people feel watched.
Tucker (2014) studied personalized ad text on a social network during a field experiment, partway through which the network handed members new privacy settings while leaving advertisers' access to their data exactly as before. Tailored ads had shown no edge over plain ones until the settings changed; after it, their click rate came close to double that of the plain versions. Aguirre et al. (2015), in a series of experiments, found that personalization lost its benefit, and could reduce click intentions, when people sensed their information had been collected covertly, and that open collection and trust-building strategies softened the effect.
A caption naming the tune someone practiced last night tells them the platform watched them, and a banjo maker has no reason to need that. I would propose three rules. Target by interest and region, such as old-time music fans within driving distance of a partner store. Personalize by place, never by behavior: "Try a Big Pine at a store near Knoxville" rather than "Still working on Cluck Old Hen?" And cap how often anyone sees our ads, so a small workshop never feels like it is following someone.
We may lose some clicks with these rules, and I think that is a fair price for a shop whose reputation rests on trust in a small community. Where would you draw the line for your organization's ads?
References
Aguirre, E., Mahr, D., Grewal, D., de Ruyter, K., & Wetzels, M. (2015). Unraveling the personalization paradox: The effect of information collection and trust-building strategies on online advertisement effectiveness. Journal of Retailing, 91(1), 34-49. https://doi.org/10.1016/j.jretai.2014.09.005
Goldfarb, A., & Tucker, C. (2011). Online display advertising: Targeting and obtrusiveness. Marketing Science, 30(3), 389-404. https://doi.org/10.1287/mksc.1100.0583
Tucker, C. E. (2014). Social networks, personalized advertising, and privacy controls. Journal of Marketing Research, 51(5), 546-562. https://doi.org/10.1509/jmr.10.0355
What the MKT 555 Module 7 instructions ask for
The seventh MKT 555 discussion commonly asks you to consider targeting and personalization in social media advertising: how precisely to reach people, how much to tailor messages and what privacy and ethical limits apply. Expect to take a position on a specific practice, such as retargeting, lookalike audiences or personalized ad text, for your organization. Strong posts separate the targeting a platform does behind the scenes from what an ad visibly reveals about a person, cite research on how people respond to each and state a rule the organization could actually follow. They also consider the people being targeted, not only the advertiser's results, and avoid treating legality as the same as acceptability.
How this MKT 555 Module 7 discussion example is built
The sample responds to an agency pitch to the composite Laurel Fork workshop: retarget everyone who watched a clawhammer lesson, with ad captions naming the tune they last practiced. It accepts targeting by interest and region but rejects ads that show what the platform knows. From Goldfarb and Tucker it takes the warning that relevance and loud display together turned people off, most of all those guarding their privacy. From Tucker it takes the observation that tailored ad text began working only after users gained a sense of control, and Aguirre and colleagues' experiments explain why covert data use backfires. The post proposes three rules and invites peers to say which one their organization could not keep.
Where the MKT 555 Module 7 rubric puts the points
Grading for this privacy discussion usually considers a clear position on targeting and personalization, application to the organization's own advertising, the research used, attention to the people being targeted and what replies contribute. Posts that earn top marks distinguish kinds of targeting, explain why some feel intrusive and turn the argument into a practical rule. Posts lose points when they treat any legal targeting as fine, reject all targeting without considering its benefits, rely on personal discomfort rather than evidence or answer classmates with general agreement. Engaging with a classmate whose organization handles more sensitive data, such as a clinic or a bank, adds depth the rubric rewards, because the same rule may not survive there.
MKT 555 Module 7 help: the mistakes that cost points
Pick one targeting or personalization practice your organization might use and describe it exactly. Separate what happens behind the scenes, such as choosing an audience by interest, from what the ad itself reveals, such as naming something the person did. Use research on how people respond to targeted and personalized ads, including when it backfires. Consider who is being targeted and what they would expect. Then propose a rule or two the organization could follow and explain the trade-off in results. Avoid treating "legal" and "acceptable" as the same. Close by asking peers whether your rule would survive contact with their own campaigns.
Get MKT 555 Module 7 written to your instructions
Paste the MKT 555 Module 7 prompt and the ad idea you are weighing. We judge its targeting and personalization against field research on privacy and ad response, suggest a line your organization can hold and close by asking classmates where their own organizations stop. The first post is on us and usually arrives in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 555 papers and related MS in Marketing samples
- MKT 555 Module 1 Discussion: The Possibilities and Limits of Social Media
- MKT 555 Module 2 Social Media Audit Assignment: Social Media Audit
- MKT 555 Module 3 Milestone One: Audience Analysis and Social Media Goals
- MKT 555 Module 4 Discussion: Content That Earns Attention
- MKT 555 Module 5 Content Evaluation Assignment: Constructing and Evaluating Social Media Content
- MKT 555 Module 6 Milestone Two: Content Strategy, Calendar and Creators
- MKT 555 Module 8 Milestone Three: Paid Social and Measurement Plan
- CSR 610 Module 6 Milestone Two: Stakeholders and Social Responsibility
- ACC 646 Module 7 Discussion: The Admission-Seeking Interview
- BMB 515 Module 2 Industry Structure Assignment: Three Income Streams and Where the Label Sits
- ACC 550 Module 4 Discussion: Which Activities Add Value in a Sheller?
MKT 555 Module 7 questions, answered
Where can I find a free MKT 555 Module 7 Discussion sample?
The complete MKT 555 Module 7 post on this page weighs targeting and personalization for a composite banjo workshop's social ads and proposes three rules.
Does personalized advertising work on social media?
It can, but research shows it works best when people feel in control of their information and can backfire when people sense their data was gathered without their knowledge.
What is the personalization paradox?
The finding that personalized ads can raise response because they are relevant while also lowering it because they make people feel watched, depending on how the data were collected.
Is retargeting ethical?
Many see it as acceptable when it is limited in time and frequency and does not reveal sensitive behavior, but it can feel intrusive when ads repeat or expose what someone viewed.
Why do targeted and eye-catching ads sometimes fail together?
A field experiment found that ads matched to content and ads that were visually intrusive each worked, but combining both lowered purchase intent, especially among privacy-sensitive people.