MKT 618 Module 8 Forecasting Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 618 Module 8 Forecasting sample predicts an organization's demand for the coming year, compares methods on data held back for testing and explains how the forecast will drive decisions. SNHU MKT 618 (MKT-618) has MS in Marketing students apply forecasting to their analytics project. The organization is Bobbin and Feed Supply, a composite online seller of sewing machine parts, whose demand peaks in the fall quilting season and before the holidays. Three methods, a seasonal naive forecast, exponential smoothing and a regression with the marketing calendar, are compared on six held-out months for needles, parts and machines, and the winning forecasts set stock and email timing.

CourseMKT 618 Marketing Analytics
ModuleModule 8
Paper typegraduate assignment forecasting demand for an organization's products, comparing methods on held-out data and explaining how the forecast will be used
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 618 Module 8

1

Needles in October, Machines in December: Forecasting Demand at Bobbin and Feed Supply

[Student Name]

Southern New Hampshire University

MKT 618: Marketing Analytics

Forecasting Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe sales history, forecasts and error measures are composites produced for this assignment.
2

Needles in October, Machines in December: Forecasting Demand at Bobbin and Feed Supply

Introduction

The analytics project has so far explained who returns and what drives orders. This assignment looks forward. Bobbin and Feed must decide how many needles, presser feet and other parts to stock and how many vintage machines to refurbish, and it runs out of popular needle sizes every October while machines pile up in spring. The assignment forecasts monthly unit demand for three product groups and weekly website orders for the next twelve months and explains how the forecasts will set stock levels and email timing.

What this page is doingStates what is forecast and why.
3

The Data and Its Patterns

The history covers 36 months of unit sales by product group from website and marketplace orders combined, since stock serves both. Needles and consumables sell about 21,000 units a month on average, with a clear seasonal peak from September to November, when quilting guilds start fall projects, and a smaller one in February and March. Parts sell about 6,400 units a month with a milder pattern. Refurbished machines sell about 140 a month but swing widely, from about 60 in summer to more than 300 in December, when they are bought as gifts. All three groups show a modest upward trend of 5 to 8 percent a year.

What this page is doingDescribes the history.
4

Methods Compared

Fildes et al. (2022), reviewing forecasting research and practice in retailing, described how retailers forecast at many levels, from total sales to individual products, how promotions, prices, calendar events and seasonality shape product-level demand and why simple, well-chosen methods often perform well in practice. Three methods were compared. The seasonal naive forecast uses the same month last year, adjusted for trend, as a benchmark any other method must beat. Exponential smoothing with trend and season weights recent months more heavily and updates its estimates of level, trend and seasonal pattern as data arrive. The regression adds the shop's marketing calendar, sale months and email volume, to the season and trend, using the relationships estimated in Milestone Two.

What this page is doingExplains the three approaches.
5

Accuracy on Held-Out Data

Each method was fitted to the first 30 months and asked to forecast the last six, which it had not seen. Hyndman and Koehler (2006) showed that common percentage errors become unstable or undefined when actual values are near zero and proposed the mean absolute scaled error, which divides a method's average miss by the average miss of a naive one-step forecast on the same history; a value below 1 means the method beats the naive benchmark. That measure suits the machines series, which has low-volume months.

Mean absolute scaled error on six held-out months (lower is better)

Product groupSeasonal naiveExponential smoothingRegression with marketing calendar
Needles and consumables0.920.710.68
Parts0.950.780.81
Refurbished machines1.080.880.97

The regression wins narrowly for needles, where email and sales clearly move demand. Exponential smoothing wins for parts and machines. For machines, the regression did worse than smoothing, probably because machine demand depends more on the holiday season than on the shop's marketing.

Makridakis et al. (2018), comparing popular machine learning methods with eight traditional statistical methods on 1,045 monthly series from the M3 competition, found the machine learning methods less accurate across forecasting horizons and far more demanding to compute. That finding, together with the shop's small data set, is the reason no machine learning model was tried.

What this page is doingCompares the methods fairly.
6

The Forecast

Forecast for selected months, with 80 percent ranges

Product groupMethodOctoberDecemberMarch
Needles and consumables (units)Regression33,500 (30,100 to 36,900)22,800 (20,200 to 25,400)24,600 (21,700 to 27,500)
Parts (units)Smoothing8,100 (7,200 to 9,000)6,900 (6,000 to 7,800)6,600 (5,700 to 7,500)
Refurbished machines (units)Smoothing190 (140 to 240)330 (250 to 410)120 (80 to 160)
What this page is doingPresents the next twelve months with ranges.
7

Why Machines Are Hardest

The machines forecast has the widest range relative to its size, and the reason is worth stating, since the owner will ask why it cannot be tighter. Machines sell in small numbers, so a handful of extra buyers in one month changes the total by a large share. Their supply is also uneven: the shop buys used machines at estate sales and auctions, refurbishes them and lists them as they are ready, so sales in some months were limited by what was on the shelf, not by what customers wanted. A forecast built on those months understates true demand. The December peak is reliable, but how high it goes depends on how many machines the workshop can finish. For that reason the machines forecast is best used as a guide to how many machines to have ready, with the range telling the workshop how much spare refurbishing capacity to hold in reserve.

What this page is doingExplains the widest range.
8

Using the Forecast

For needles, the shop orders from its supplier with a six-week lead time. To cover October demand at the upper end of the range, the order placed in mid-August should bring needle stock to about 37,000 units, roughly 9,000 more than last year's August order, which ran out in the third week of October. For machines, refurbishing takes about three weeks per batch, so the workshop should begin building December stock in early October, aiming at 330 units with enough parts to reach 410 if early sales run high. The forecast also sets email timing: the September and October emails should focus on needles and quilting feet, when demand is rising anyway, rather than on sales that borrow from later weeks.

What this page is doingTurns numbers into decisions.
9

What Marketing Should Do With It

The forecast is not only an inventory tool. If needle demand will rise by about half from August to October regardless of promotion, discounts on needles in October mostly give away margin on sales that would have happened anyway, the same lesson the regression taught about sale weeks. Promotion is more useful in the quiet months, June and July, when demand is low and a well-timed email about summer projects could fill capacity. The machine forecast suggests a similar shift: rather than pushing machines in December, when they sell themselves as gifts, the shop could use email and search in late winter, when machine sales are weakest and refurbished stock is highest.

What this page is doingConnects the forecast to promotion.
10

Updating and Limits

The forecasts will be refit monthly as new data arrive and compared with actual sales. Three years of history is short, especially for the machines series, so the ranges are wide and should be treated as planning bands rather than promises. A change in marketplace fees or a supplier shortage could shift demand in ways no method based on history can foresee.

What this page is doingExplains how the forecast stays useful.
11

References

Fildes, R., Ma, S., & Kolassa, S. (2022). Retail forecasting: Research and practice. International Journal of Forecasting, 38(4), 1283-1318. https://doi.org/10.1016/j.ijforecast.2019.06.004

Hyndman, R. J., & Koehler, A. B. (2006). Another look at measures of forecast accuracy. International Journal of Forecasting, 22(4), 679-688. https://doi.org/10.1016/j.ijforecast.2006.03.001

Makridakis, S., Spiliotis, E., & Assimakopoulos, V. (2018). Statistical and machine learning forecasting methods: Concerns and ways forward. PLOS ONE, 13(3), Article e0194889. https://doi.org/10.1371/journal.pone.0194889

What the MKT 618 Module 8 instructions ask for

The Module 8 assignment in MKT 618 commonly asks you to forecast a marketing outcome, such as sales, demand or website traffic, for your organization and explain how the forecast will be used. Expect to describe the data and its patterns, such as trend and seasonality, apply one or more forecasting methods, evaluate accuracy and present the forecast. A strong assignment compares at least two methods on data held back from fitting, uses a sensible accuracy measure, presents forecasts as ranges rather than single numbers and ties the forecast to a decision, such as inventory, staffing or campaign timing. It also explains in plain language why the chosen method suits the data.

How this MKT 618 Module 8 forecasting assignment example is built

The sample forecasts Bobbin and Feed's monthly unit demand for needles and consumables, parts and refurbished machines and its weekly website orders for the next year. It fits a seasonal naive forecast, exponential smoothing with trend and season and a regression that adds the marketing calendar, holds out the last six months to compare accuracy with a scaled error measure and picks the best method for each group. Forecasts are shown with 80 percent ranges and turned into reorder points for needles ahead of the October quilting rush and a machine refurbishing schedule for December. Fildes, Ma and Kolassa on retail forecasting, Hyndman and Koehler on error measures and Makridakis and colleagues on simple versus complex methods support the choices.

Where the MKT 618 Module 8 rubric puts the points

Forecasting assignments in MKT 618 are usually marked on analysis of patterns in the data, the choice and explanation of methods, a fair accuracy comparison on held-out data, an appropriate error measure, presentation of forecasts with uncertainty, the link to decisions and research and writing. Strong work shows a chart or table of history and forecast, reports errors for each method and explains why the winner won. Work loses marks for fitting and testing on the same data, judging by a percentage error that breaks down near zero, presenting single-number forecasts without ranges, choosing a complex method without showing it beats a simple one or never saying what the forecast is for.

MKT 618 Module 8 help: the mistakes that cost points

Plot your history first and describe its trend, seasonality and unusual periods. Hold back the most recent months, fit each method on the rest and compare forecasts with what actually happened. Always include a simple benchmark, such as last year's same month, since complex methods often fail to beat it. Use an error measure that works for your data; scaled errors avoid the problems percentage errors have with small numbers. Present the forecast with a range. Then explain what decision the forecast supports and how often it will be updated. Keep the technical detail brief and the business use clear.

Get MKT 618 Module 8 written to your instructions

Send the MKT 618 Module 8 guidelines and your sales history. We compare forecasting methods on held-out data, choose the most accurate for each product line, show forecast ranges and explain how the numbers should set stock, staffing or marketing timing, with forecasting research behind each choice. Your first forecasting assignment is free and usually returned in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 618 papers and related MS in Marketing samples

MKT 618 Module 8 questions, answered

Where can I find a free MKT 618 Module 8 forecasting sample?

The full MKT 618 Module 8 assignment on this page forecasts demand for needles, parts and machines at a composite online shop and compares three methods.

What forecasting methods are used in marketing analytics?

Common choices include simple seasonal benchmarks, exponential smoothing, regression with marketing variables and more complex time-series or machine learning models.

How do you measure forecast accuracy?

By comparing forecasts with actual results on data held back from fitting, using measures such as mean absolute error or scaled errors that compare a method with a simple benchmark.

Are machine learning methods better for sales forecasting?

Not always; a large comparison on monthly series found traditional statistical methods more accurate than popular machine learning methods at lower computational cost.

Why show a range instead of a single forecast?

A single figure pretends to know next month; a band from low to high tells the buyer how much stock covers a strong month without burying the shop in a weak one.