| Course | MKT 625 Strategic Digital Marketing |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment planning video content for a digital strategy and designing how channel contributions will be measured beyond the last click |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 625 Module 8
Walkthroughs and Who Gets the Credit: Video Content and Attribution for Granite City RV
[Student Name]
Southern New Hampshire University
MKT 625: Strategic Digital Marketing
Video and Attribution Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Walkthroughs and Who Gets the Credit: Video Content and Attribution for Granite City RV
Introduction
Module 5 found that first-time families spend weeks watching videos before they contact a dealer, and that most of those videos are made by strangers or competitors. The channel strategy made video the dealer's main tool for winning the shortlist. This assignment plans the video content in detail and designs how its contribution will be measured, since video works early in a 14-week journey and will rarely be the last thing a buyer clicks.
What the Videos Answer
Video library
| Series | Customer question | Journey stage | Length | Volume |
|---|---|---|---|---|
| Unit walkthroughs | "What does this exact camper look like inside, and is it in good shape?" | Shortlisting | 2 to 4 minutes | Every unit, about 1,150 a year |
| Towing made plain | "Can our vehicle safely pull this?" | Learning | 6 to 8 minutes | Six episodes, then updates |
| Camping with kids | "Is this something our family would enjoy?" | Spark and learning | 1 to 3 minutes | Two a month |
| Moving up | "Which fifth wheel or motorhome suits retirement travel?" | Learning and shortlisting | 10 to 20 minutes | One a month |
| Owner orientation | "How do I use what we just bought?" | After pickup | 5 to 10 minutes | Twelve episodes |
Walkthroughs are the backbone. Each shows the actual unit, not a factory model, and the salesperson points out wear honestly on used units. The towing series answers the question that stalls families for weeks; the dealer's service manager presents it, which lends credibility.
Production and Publishing
Two salespeople trained by a local video producer will film on set days, two mornings a week, using a phone gimbal, wireless microphones and a small light kit costing about $3,500. A walkthrough must be posted within two days of a unit arriving on the lot. The towing and moving-up series are filmed in batches during the slow winter months. Editing is kept simple: a short title card at the end, not the beginning, and no music under speech.
Tellis et al. (2019), studying what drives sharing of online video ads across platforms, found that positive emotions such as warmth and inspiration increased sharing, that prominent early branding reduced it and that sharing was greatest for videos of moderate length, while information-heavy content was shared less except in risky contexts. The walkthroughs are information-heavy by design and are made to be watched, not shared; the camping-with-kids pieces are the ones meant to travel, so they lead with families and scenery and save the dealer's name for the end.
What Last-Click Reports Miss
The dealer's lead log credits each sale to the source of the last contact. A family that watched eight walkthroughs and the towing series over two months, then clicked a marketplace listing and called, would be credited entirely to the marketplace. Video would appear to do nothing, and next year's budget would move toward marketplaces. That is the opposite of what the journey map suggests.
Measuring the true effect is hard. Across 25 big retail and brokerage ad tests, Lewis and Rao (2015) found individual purchases swing so widely compared with the few cents spent reaching each person that even huge tests leave the return uncertain, and comparisons without a control group are skewed because ads chase people already inclined to buy. Gordon et al. (2019) checked the usual non-experimental fixes against Facebook campaigns that had held out a random control group, and found the fixes often missed the true lift by a wide margin. The dealer cannot run experiments on millions of people, but it can avoid the worst bias.
Measurement Design
First, ask every buyer, at the signing, a short question: "How did you first find this unit, and what else helped you decide?" with options including specific video series. Answers will be imperfect, but they capture early-journey content that no tracking system sees.
Second, give every channel its own tracked phone number and add a field to the website lead form recording the pages viewed before the lead, so the dealer can see how many leads watched a video first.
Third, test paid video promotion. The dealer's market area divides into about twenty counties and county groups. Matched pairs will be formed by population and past sales, and paid promotion of the video channel will run in one of each pair for twelve weeks while organic video stays available everywhere. Website leads, calls and sales from each area will be compared.
Measures by series
| Series | Main measure | Secondary measure |
|---|---|---|
| Unit walkthroughs | Share of leads who watched the unit's video | Time from lead to sale |
| Towing made plain | Viewers who go on to inventory pages | Buyer source answers |
| Camping with kids | Shares and new channel subscribers | Region test results |
| Moving up | Leads from retirees who watched | RV show attendance from viewers |
| Owner orientation | Service calls about basic operation | Owner satisfaction |
Early Signs
Before committing to the full plan, the dealer ran a small pilot last spring: one salesperson filmed walkthroughs of 60 used trailers over six weeks, posted on the website and a new video channel. Units with a walkthrough received about 40 percent more lead inquiries per day on the lot than similar units without one, and sold on average nine days sooner. Several buyers mentioned the videos without being asked, and two drove from Iowa after watching. The pilot was not a controlled test, since the salesperson chose which units to film and probably picked the more appealing ones, but it was encouraging enough to justify the full program and the more careful measurement described above.
Decision Rules
If buyer source answers and the region test both show video contributing to at least 15 percent of sales, the video budget doubles in year two and marketplace spending falls further. If neither shows an effect, the dealer keeps walkthroughs, which answer questions regardless, and cuts paid promotion.
Limits
Buyers' recall of what influenced them is imperfect, the region test is small and families in one county watch the same videos as families in the next. The measurement will not give precise numbers, but it will be far less biased than the last click.
References
Gordon, B. R., Zettelmeyer, F., Bhargava, N., & Chapsky, D. (2019). A comparison of approaches to advertising measurement: Evidence from big field experiments at Facebook. Marketing Science, 38(2), 193-225. https://doi.org/10.1287/mksc.2018.1135
Lewis, R. A., & Rao, J. M. (2015). The unfavorable economics of measuring the returns to advertising. The Quarterly Journal of Economics, 130(4), 1941-1973. https://doi.org/10.1093/qje/qjv023
Tellis, G. J., MacInnis, D. J., Tirunillai, S., & Zhang, Y. (2019). What drives virality (sharing) of online digital content? The critical role of information, emotion, and brand prominence. Journal of Marketing, 83(4), 1-20. https://doi.org/10.1177/0022242919841034
What the MKT 625 Module 8 instructions ask for
The Module 8 assignment in MKT 625 typically asks you to develop a content strategy for one or more digital channels and to explain how the organization will measure and attribute results across channels. Expect to define the content, its audience and journey stage, the production and publishing plan and the measures of success, and to address attribution: how credit for a sale is divided among the channels a customer used. A strong assignment ties content to specific questions customers ask at specific stages, keeps production realistic for the organization's resources and proposes measurement that goes beyond last-click reports, using customer surveys, tracking and tests where possible.
How this MKT 625 Module 8 video and attribution assignment example is built
The sample plans a video library for Granite City RV, a composite St. Cloud dealership: a two-minute walkthrough for every unit, a six-part towing series, short pieces on camping with children and longer guides for retirees moving up to fifth wheels and motorhomes. Two salespeople produce the videos with a modest kit on set days each week. Measurement adds a "how did you find this unit" question at every sale, call tracking by source and a test that holds back paid video promotion in matched regions for twelve weeks. Research by Tellis and colleagues on which videos travel, by Lewis and Rao on the wide error bands around ad returns and by Gordon's Facebook team on shortcut estimates supports the design.
Where the MKT 625 Module 8 rubric puts the points
Content and attribution assignments in MKT 625 are usually graded on content tied to the customer journey, realistic production and publishing plans, measures suited to the content's role, a thoughtful attribution approach, research support and writing. Strong submissions show which customer questions each piece answers, in which week of the journey, plan production within real staff time and design measurement that can credit content used early in the journey. Submissions lose marks for content calendars disconnected from customers' questions or the journey stage, production plans no one could sustain, success defined by views alone or attribution left to the last click without discussion of its bias.
MKT 625 Module 8 help: the mistakes that cost points
List the questions customers ask at each stage of the journey and match a content type to each. Decide the format, length and who will produce it, and check the plan against real staff hours. Set publishing rules, such as a walkthrough within two days of a unit arriving. Choose measures that fit each piece's job: early content should be judged by whether viewers go on to inventory pages, not by immediate leads. Then address attribution: explain what last-click reports miss, and propose at least one method that gets closer to cause, such as asking buyers or running a regional test. Cite research on content and measurement.
Get MKT 625 Module 8 written to your instructions
Send the MKT 625 Module 8 guidelines and your channel strategy. We plan the content for your key channel, video or otherwise, set production and publishing rules and design measurement that credits early-journey content fairly, with research on content and advertising measurement. Your first assignment is free and usually takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 625 papers and related MS in Marketing samples
- MKT 625 Module 1 Discussion: Digital Strategy Versus Digital Tactics
- MKT 625 Module 2 Digital Audit Assignment: Digital Marketing Audit
- MKT 625 Module 3 Milestone One: Digital Situation Analysis and Objectives
- MKT 625 Module 4 Discussion: Search Engine Marketing Strategy
- MKT 625 Module 5 Customer Journey Assignment: Customer Journey Mapping and Touchpoints
- MKT 625 Module 6 Milestone Two: Digital Channel Strategy
- MKT 625 Module 7 Discussion: Email Marketing and Personalization
- MGT 630 Module 4 Productivity Analysis Assignment: Ten Weeks of Panel Setting Data
- FIN 685 Module 3 Milestone One: Measuring Coffee, Currency, Gas and Rate Exposure
- FIN 620 Module 7 Discussion: Paying for a Second Credit Rating
- MKT 555 Module 1 Discussion: The Possibilities and Limits of Social Media
MKT 625 Module 8 questions, answered
Where can I find a free MKT 625 Module 8 video and attribution sample?
This page has the full MKT 625 Module 8 assignment planning walkthrough videos for an RV dealer and measuring their value beyond the last click.
What is marketing attribution?
The method used to divide credit for a sale among the channels and content a customer encountered, from simple last-click rules to models and experiments.
Why does video content help with high-involvement products?
It answers detailed questions buyers have before they visit, such as layout and condition, and builds trust in the seller, which matters when the purchase is large.
What makes online video more likely to be shared?
Studies of video ads found that warmth, inspiration and a middling running time encouraged people to pass a clip on, while dense facts and a logo stamped on the opening seconds discouraged it.
How can a small business measure what its content does?
By asking customers how they found the product, tracking calls and visits by source and running simple tests that compare regions or periods with and without the content.