MKT 625 Module 6 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This MKT 625 Module 6 Milestone Two sample sets a digital channel strategy: what job each channel does, how the channels connect along the customer journey and what content each carries. SNHU MKT 625 (MKT-625) has MS in Marketing students turn their journey map and objectives into a channel plan in Milestone Two. The organization is Granite City RV, a composite St. Cloud dealership. The plan makes a rebuilt mobile website the hub, uses generic search and a walkthrough video channel to win the shortlist, caps listing marketplace spending, aims mobile and social ads at three buyer groups, uses generic retargeting for early researchers, tailors email to returning owners and adds an evening text line.

CourseMKT 625 Strategic Digital Marketing
ModuleModule 6
Paper typegraduate milestone setting the digital channel strategy: the role of each channel, how channels connect along the customer journey and the content and offers in each
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 625 Module 6

1

The Channel Strategy: Milestone Two for Granite City RV

[Student Name]

Southern New Hampshire University

MKT 625: Strategic Digital Marketing

Milestone Two: Digital Channel Strategy

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe channel roles, content and budgets are composites written for the dealership's plan.
2

The Channel Strategy: Milestone Two for Granite City RV

Introduction

The journey map in Module 5 showed that first-time families spend weeks learning from videos and listings before they contact any dealer, that the dealer controls almost none of that early journey and that families drop away at four pain points: unanswered evening questions, stock photos, towing confusion and an absent spouse. Milestone One set four objectives: more website leads, lower cost per sale, less dependence on listing marketplaces and complete review responses. This milestone assigns each digital channel a role that serves those findings and objectives.

What this page is doingLinks the strategy to the journey and objectives.
3

The Strategy at a Glance

Channel roles

ChannelMain jobMain audienceContentMain measure
Website (hub)Turn interest into a leadAll groupsReal photos and video for every unit, towing guide, payment calculator, three-question formLeads per visit
Generic and inventory searchWin the shortlistFirst-time families, retireesAds and pages for trailer types and models in stockNew-visitor leads
Video channelTeach and build trust in the learning stageFirst-time families, retireesWalkthroughs of units, towing explained, camping with kidsViewers who visit inventory pages
Listing marketplacesReach shoppers who start thereFirst-time familiesUsed units only, with real photos and links to videoCost per sale, capped
Mobile and social adsIntroduce the dealer to new families in the regionFirst-time families, retireesShort videos, seasonal events, RV show invitationsWebsite visits and leads by region
RetargetingBring researchers backSite visitorsGeneral dealer ads early; specific units only after repeated viewsReturn visits and leads
EmailKeep owners close and invite trade-upsReturning owners, past leadsContent matched to the unit owned or viewedService bookings and trade-in appraisals
Evening text lineAnswer questions when families researchAll groupsReplies within an hour until 10 p.m.Response time; leads from texts
What this page is doingShows each channel's job.
4

The Website as Hub

Every other channel in the plan sends families to the website, so its weaknesses multiply. The rebuild has three requirements: inventory pages that load in under three seconds on a phone, two dozen or more genuine photos plus a brief walkthrough clip posted with each unit on the day it goes live, and a lead form that asks only for a name, a phone or email and the unit of interest. The towing guide and payment calculator answer the two questions that stall families in the learning stage.

What this page is doingExplains why the site comes first.
5

Winning the Shortlist

Generic and inventory search, built on the test proposed in Module 4, goes after shoppers who are still deciding whose lot to drive to. Pages for each trailer type and popular model in stock, with real inventory and video, are designed to rank on their own; paid ads cover the gaps. The video channel does the work that strangers' videos do now: walkthroughs of real units on the lot, a series on towing with common family vehicles and short pieces on camping with children, presented by the dealer's own staff.

What this page is doingUses search and video.
6

Mobile and Social Ads

Bart et al. (2014), in a field study of 54 mobile display campaigns, saw phone banner ads shift opinions and buying plans when the product called for real thought and served a practical purpose, and leave cheap or purely pleasurable products untouched. An RV is high involvement and, for most families, a practical purchase about how they will spend their vacations, so mobile ads suit it. The plan uses short video ads on phones aimed at families within three hours' drive, with different versions for first-time families and retirees, and invitations to the January RV show for the retiree group.

What this page is doingTargets the buyer groups.
7

Retargeting

Lambrecht and Tucker (2013) worked with a travel website that randomly followed past visitors with either a plain brand banner or a banner picturing the very hotel they had browsed; the plain banner usually won, and the pictured hotel came out ahead only once a shopper had moved on to comparing specific options, a sign that the trip was mostly decided. For Granite City, that suggests generic dealer ads for families early in learning, who browse many units without a clear preference, and unit-specific ads only for visitors who return to the same unit several times or compare two units side by side.

What this page is doingMatches ads to how settled the shopper is.
8

Email

Ansari and Mela (2003), using clickstream data from a major website, built a model that customized the design and content of each recipient's email and found that customization could substantially increase response compared with uniform messages. The dealer's 9,600-name list will be divided by what each person owns or has viewed: owners of trailers bought five or more years ago receive trade-in appraisal offers and new floor plans in their size range, recent buyers receive maintenance reminders and camping guides, and leads who did not buy receive new arrivals matching the unit they asked about.

What this page is doingPersonalizes for owners and leads.
9

What Is Reduced

Branded paid search is reduced if the Module 4 test shows little effect. Listing marketplace spending is capped at its current level and limited to used units, since new units are better shown on the dealer's own site with video. Facebook ads promoting sales events, which drew low-quality leads, are replaced by video ads aimed at the defined groups.

What this page is doingStates what the plan cuts.
10

Budget Shift

The strategy does not require a much larger budget, mainly a different one. Of about $160,000 a year now spent on digital marketing, roughly $66,000 goes to listing marketplaces, $17,000 to branded search, $28,000 to Facebook event ads and the rest to the website vendor. The plan holds marketplaces flat, cuts branded search and event ads, and moves that money and a modest increase into the website rebuild, video production, generic search and targeted mobile ads.

What this page is doingShows how spending moves.
11

How the Channels Connect

A typical first-time family might see a short video ad on a phone, watch a towing walkthrough on the video channel, visit the towing guide and three inventory pages, receive a generic retargeting ad, return to compare two units, text a question at 9 p.m. and get a reply in twenty minutes, then book a Saturday visit. Each channel hands the family to the next, and the website and the text line catch them when they are ready.

What this page is doingShows the handoffs.
12

References

Ansari, A., & Mela, C. F. (2003). E-customization. Journal of Marketing Research, 40(2), 131-145. https://doi.org/10.1509/jmkr.40.2.131.19224

Bart, Y., Stephen, A. T., & Sarvary, M. (2014). Which products are best suited to mobile advertising? A field study of mobile display advertising effects on consumer attitudes and intentions. Journal of Marketing Research, 51(3), 270-285. https://doi.org/10.1509/jmr.13.0503

Lambrecht, A., & Tucker, C. (2013). When does retargeting work? Information specificity in online advertising. Journal of Marketing Research, 50(5), 561-576. https://doi.org/10.1509/jmr.11.0503

What the MKT 625 Module 6 instructions ask for

Milestone Two in MKT 625 commonly asks you to develop the digital channel strategy: which channels the organization will use, the role each plays, how they work together along the customer journey and what content or offers each will carry. Expect to justify each channel with evidence about the target customers and the objectives, and to explain how a customer passes from one channel to the next. A strong milestone treats the website or another owned channel as a hub, gives every channel a distinct job tied to a journey stage, explains what will be cut or reduced as well as added and uses research on how specific channels work, such as search, mobile, retargeting or email, rather than generic descriptions.

How this MKT 625 Module 6 milestone two example is built

The sample sets Granite City RV's channel strategy on the 14-week journey from Module 5. A rebuilt mobile website with real photos and video for every unit is the hub. Generic and inventory search and a walkthrough video channel aim to win the shortlist, listing marketplaces are kept for used units with spending capped, mobile and social ads target the three buyer groups, retargeting uses general dealer ads for early researchers and unit-specific ads only for those who have narrowed their choice, email is tailored to what returning owners own and an evening text line answers questions. Bart, Stephen and Sarvary, Lambrecht and Tucker and Ansari and Mela support the design.

Where the MKT 625 Module 6 rubric puts the points

The second MKT 625 milestone is generally graded on a channel strategy linked to the journey and objectives, a distinct role for each channel, integration among channels, content and offers suited to each channel and segment, attention to what is cut as well as added, and the sources and prose. Top submissions lay channels out in a table with their job, audience, content and measure, and explain how customers move from one to the next. Submissions lose marks for adding every channel, giving several channels the same job, ignoring the website or the offline step or describing channels without evidence of how they work for this kind of customer.

MKT 625 Module 6 help: the mistakes that cost points

Start from your journey map and objectives. For each stage, decide which channel should do the work and what it should say or show. Make an owned channel, usually the website, the hub that other channels send people to, and fix it first. Give each channel one main job and one main measure. Say what you will reduce or stop, not only what you will add. Use research on how specific channels perform for products like yours. Explain how a customer moves from one channel to the next, such as from a video to an inventory page to a text message. Present the strategy in a table, then explain the choices in text.

Get MKT 625 Module 6 written to your instructions

Upload the MKT 625 Milestone Two brief with your journey map and objectives. We give every digital channel a defined job, connect the channels along the journey, set content and offers for each and support the choices with research on mobile, retargeting and email. The first channel strategy is written free and delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 625 papers and related MS in Marketing samples

MKT 625 Module 6 questions, answered

Where can I find a free MKT 625 Module 6 Milestone Two sample?

The full MKT 625 Milestone Two on this page sets the digital channel strategy for a composite RV dealership, from website and search to video, retargeting and email.

What is a digital channel strategy?

A plan that assigns each digital channel a role along the customer journey, connects the channels to one another and to an owned hub and sets the content each carries.

Does retargeting work?

It can, but a field experiment found ads showing the exact products a person viewed often did worse than generic brand ads, except for shoppers who had already narrowed their preferences.

How should email be personalized?

Research on customizing email design and content to each recipient's past behavior found it increased engagement, so content should reflect what the recipient owns or has viewed.

Why should the website be the hub of a digital strategy?

Most channels send customers to the website, so a slow or weak site wastes the spending on every other channel; fixing it first improves results everywhere.