| Course | MKT 645 Online Marketing Channels |
|---|---|
| Module | Module 1 |
| Paper type | graduate discussion post on how an organization should choose and combine online channels, considering how each affects the others |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 645 Module 1
Module One Discussion
Which Online Channels, and for Whom?
For this course I will follow Cardinal Ridge Feeder Company, a composite family manufacturer in Millersburg, Ohio. It was founded in 1988, employs 64 people and makes metal tube feeders with squirrel baffles, cedar hopper feeders and its own seed blends, with about $21 million in sales. Roughly 52 percent comes through about 600 independent wild bird and garden stores, 18 percent through hardware co-ops, 19 percent through a large online marketplace and 11 percent through its own website. Marketplace sales grew 40 percent last year; specialty store sales were flat.
The owner's instinct is to treat online as a separate project: grow the marketplace, fix the website, keep the stores happy. Verhoef et al. (2015) traced the retail shift away from separate channel fiefdoms, each with its own targets, toward a single coordinated system, because shoppers now hop between phone, store and website so freely that the borders between channels stop meaning much. A birder might read a review on the marketplace, ask advice at a bird store and order on the website, or the reverse.
Geyskens et al. (2002), studying stock market reactions to established firms adding internet channels, found these additions were, on average, positive investments, but that the reaction depended on the firm's power and existing channel structure. Adding or growing a channel is good or bad depending on what it does to the rest.
Treating the marketplace as a separate growth project has an obvious appeal: it is the only channel growing quickly, and it needs no salespeople. But the specialty stores are where most birders first see a Cardinal Ridge feeder, handle its metal baffle and hear a store owner explain why squirrels cannot get past it. If marketplace prices keep undercutting those stores, some will give the shelf space to a competitor, and the brand will lose the place where new customers learn about it.
Ailawadi and Farris (2017) argued that managers need metrics for both the breadth and depth of distribution across channels and for how shoppers use channels together. Cardinal Ridge reports sales by channel but not margin by channel, and it has never asked how many store customers also buy online.
Which channel did your organization add most recently, and what did it change for the others?
References
Ailawadi, K. L., & Farris, P. W. (2017). Managing multi- and omni-channel distribution: Metrics and research directions. Journal of Retailing, 93(1), 120-135. https://doi.org/10.1016/j.jretai.2016.12.003
Geyskens, I., Gielens, K., & Dekimpe, M. G. (2002). The market valuation of internet channel additions. Journal of Marketing, 66(2), 102-119. https://doi.org/10.1509/jmkg.66.2.102.18478
Verhoef, P. C., Kannan, P. K., & Inman, J. J. (2015). From multi-channel retailing to omni-channel retailing: Introduction to the special issue on multi-channel retailing. Journal of Retailing, 91(2), 174-181. https://doi.org/10.1016/j.jretai.2015.02.005
What the MKT 645 Module 1 instructions ask for
The first MKT 645 thread typically pairs a short company introduction with the question of which online channels that company should run and on what grounds. Expect to describe its current channels, its customers and how they buy, and to argue for a way of choosing channels. Strong posts treat channels as a system: they ask what each channel does for customers, what it costs and how it affects existing channels, partners and prices, rather than listing every channel the organization could add. They use research on multichannel and omnichannel strategy and include a figure or two showing where sales come from today.
How this MKT 645 Module 1 discussion example is built
The sample introduces Cardinal Ridge Feeder Company, a composite Millersburg, Ohio, maker of metal and cedar bird feeders and seed blends with $21 million in sales: about 52 percent through 600 specialty bird and garden stores, 18 percent through hardware co-ops, 19 percent through a large online marketplace and 11 percent through its own website. Marketplace sales are growing fastest, and dealers are complaining about online prices. Verhoef, Kannan and Inman on omnichannel management, Geyskens, Gielens and Dekimpe on how markets valued internet channel additions and Ailawadi and Farris on channel metrics support the argument that online channels must be chosen as part of one system.
Where the MKT 645 Module 1 rubric puts the points
Marks in the opening MKT 645 discussion usually go to a clear picture of the organization's channels, an argument for how channels should be chosen, attention to effects on existing channels and partners, use of research and replies that engage classmates' cases. The best posts show where sales come from, name a specific tension between channels and explain how they would weigh it, using a number or two from the organization. Posts slip when they list platforms without a reason, treat online channels as separate from stores and partners, ignore margin and price differences across channels or reply with general encouragement. A reply that asks which partner a classmate's new channel might upset, and how that partner would find out, is especially useful.
MKT 645 Module 1 help: the mistakes that cost points
Choose an organization whose channels you can describe with some numbers, even approximate shares of sales. List each channel, what customers use it for and what it costs the organization. Identify at least one tension, such as online prices undercutting partners or a marketplace taking margin. Use research on multichannel or omnichannel strategy to explain how you would weigh adding or growing a channel. Keep the introduction brief so the argument has room. Close by asking classmates what their organization's newest channel changed, and reply with a question about a partner or price they may have overlooked. One clear tension, explained well, makes a better post than a tour of every platform.
Get MKT 645 Module 1 written to your instructions
Send the Module 1 discussion prompt for MKT 645 along with a sentence about the company whose channels you will follow. We map its routes to market as one system, show with research what a new or growing online channel does to the rest and close by asking peers about their own newest channel. The first post is written free, usually within forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 645 papers and related MS in Marketing samples
- MKT 645 Module 2 Channel Assessment Assignment: Assessing Current Online and Offline Channels
- MKT 645 Module 3 Milestone One: Channel Objectives and Target Customers
- MKT 645 Module 4 Discussion: Online Marketplaces: Reach Versus Control
- MKT 645 Module 5 Affiliate and Partner Assignment: Affiliate and Partner Marketing Programs
- MKT 645 Module 6 Milestone Two: Online Channel Mix and Budget
- MKT 645 Module 7 Discussion: Display Advertising and Measuring Its Effect
- MKT 645 Module 8 Omnichannel Assignment: Integrating Online and Offline Channels
- MKT 645 Module 9 Discussion: Channel Conflict With Offline Partners
- MKT 645 Module 10 Final Project: Online Channel Strategy
- OL 670 Module 8 Discussion: Gender, Culture and Judging Leaders
- MKT 625 Module 5 Customer Journey Assignment: Customer Journey Mapping and Touchpoints
- MKT 660 Module 2 Situation Analysis Assignment: Nonprofit Situation Analysis
- MBA 687 Module 2 Stakeholder Analysis Memo: Stakeholder analysis before One Platform
MKT 645 Module 1 questions, answered
Where can I find a free MKT 645 Module 1 Discussion sample?
The complete MKT 645 Module 1 post appears on this page: choosing online channels for a composite bird feeder maker that also sells through specialty stores.
What is the difference between multichannel and omnichannel?
Multichannel means selling through several channels managed separately; omnichannel means managing channels and touchpoints together so the customer's experience and the firm's results are optimized across them.
Does adding an online channel help established companies?
Research on stock market reactions found that internet channel additions were, on average, positive investments, though effects depended on the firm and its existing channels.
How should a company choose online channels?
By what each channel does for its customers, what it costs, how it affects existing channels and partners and how its contribution can be measured.
What channel metrics should a manufacturer track?
Measures of distribution breadth and depth, sales and margin by channel and the overlap of customers across channels, so channel decisions reflect the whole system.