| Course | MKT 645 Online Marketing Channels |
|---|---|
| Module | Module 7 |
| Paper type | graduate discussion post evaluating online display and retargeting advertising and how to measure what it actually adds |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 645 Module 7
Module Seven Discussion
Display Ads and the Sales That Would Have Happened Anyway
Last spring Cardinal Ridge spent $38,000 on banner and retargeting ads through a display vendor. The vendor's report credits the campaign with $310,000 in sales, a return of more than eight dollars per dollar. The marketing coordinator wants to triple the budget. Before anyone does, it is worth asking what the report actually measures.
The report counts every website purchase within 30 days by anyone who saw one of the ads, whether they clicked or not. About two thirds of the spending went to retargeting, ads shown to people who had already visited the website. Many of them were already shopping for a feeder; some had items in their carts. The ads may have helped, but the report cannot say how much, because it has no comparison group.
The trouble, as Lewis and Rao (2015) documented, is arithmetic: what one person spends swings so wildly next to the pennies it costs to show them a banner that only enormous experiments can pin down a return, and any comparison that lacks random assignment is skewed from the start because the ads are pointed at people already inclined to buy. Johnson et al. (2017) developed ghost ads, a method that identifies people in a randomized control group who would have been shown the ad had they been in the treatment group, which makes experiments cheaper and comparisons fairer than older methods such as showing the control group unrelated public service ads.
I would ask the vendor to run the spring campaign with a randomized holdout of 20 percent of the audience, using a ghost-ad or similar method, and compare purchases. Meanwhile, Goldfarb and Tucker (2011) found that ads both tightly matched to what a person was viewing and visually intrusive did worse than ads that were only one or the other, especially among privacy-minded people. Feeders shown to the same visitor ten times a day in flashing banners may annoy the birders the company wants to keep.
How does your organization decide whether display spending works, and has anyone ever tested it against a holdout?
References
Goldfarb, A., & Tucker, C. (2011). Online display advertising: Targeting and obtrusiveness. Marketing Science, 30(3), 389-404. https://doi.org/10.1287/mksc.1100.0583
Johnson, G. A., Lewis, R. A., & Nubbemeyer, E. I. (2017). Ghost ads: Improving the economics of measuring online ad effectiveness. Journal of Marketing Research, 54(6), 867-884. https://doi.org/10.1509/jmr.15.0297
Lewis, R. A., & Rao, J. M. (2015). The unfavorable economics of measuring the returns to advertising. The Quarterly Journal of Economics, 130(4), 1941-1973. https://doi.org/10.1093/qje/qjv023
What the MKT 645 Module 7 instructions ask for
The seventh MKT 645 discussion typically asks you to evaluate display, programmatic or retargeting advertising as an online channel, including how its results should be measured. Expect to describe a campaign, judge its reported results and propose a better way to learn what it adds. Strong posts recognize that view-through and click-through reports credit ads with sales from people who would have bought anyway, explain how a randomized test separates cause from coincidence and consider the cost and practicality of testing for the organization. They also think about how ads are targeted and shown, since intrusive targeting can reduce effectiveness and trust.
How this MKT 645 Module 7 discussion example is built
The sample examines a display vendor's report crediting $38,000 of banner and retargeting ads with $310,000 of Cardinal Ridge sales, counting every buyer who saw an ad within 30 days. It explains that retargeting reaches people already on the website and that many viewers were already shopping. Johnson, Lewis and Nubbemeyer's ghost ads method, which identifies people in a control group who would have been shown the ad, the Lewis and Rao point that only large randomized tests can pin down ad returns and Goldfarb and Tucker's finding that ads both closely targeted and visually intrusive lost effectiveness shape a proposal for a randomized test and gentler targeting. The post asks classmates how they judge display spending.
Where the MKT 645 Module 7 rubric puts the points
Grading for the display advertising discussion commonly covers understanding of how display results are reported, a clear explanation of why reports may overstate effects, a practical test design, attention to targeting and customer experience, the studies used and what replies add to the thread. The strongest posts explain the baseline problem in plain terms and propose a test the organization could run. Posts lose marks for accepting vendor reports at face value, rejecting display advertising without evidence, proposing tests no small organization could afford or ignoring how intrusive retargeting can feel. A reply that helps a classmate size a test realistically, for example by suggesting a holdout share, adds real value.
MKT 645 Module 7 help: the mistakes that cost points
Describe the campaign and the result being claimed, including how the vendor counted sales. Ask who saw the ads and whether they were already likely to buy, especially for retargeting. Explain how a randomized control group would show what the ads add, and what a fair comparison group looks like. Consider how large the test must be to detect an effect of the size that matters, and whether that is practical. Think about how the ads are targeted and how often people see them. Use research on ad measurement. Recommend what to do while the test runs, such as holding the budget steady rather than tripling it. Ask classmates how they judge similar spending.
Get MKT 645 Module 7 written to your instructions
Paste the MKT 645 Module 7 prompt and the display or retargeting results you are reviewing. We explain what the report does and does not show, design a test with a proper control group using measurement research and close by asking peers how they judge similar spending. Your first display-ad post is free and lands within a couple of days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 645 papers and related MS in Marketing samples
- MKT 645 Module 1 Discussion: Choosing Online Marketing Channels
- MKT 645 Module 2 Channel Assessment Assignment: Assessing Current Online and Offline Channels
- MKT 645 Module 3 Milestone One: Channel Objectives and Target Customers
- MKT 645 Module 4 Discussion: Online Marketplaces: Reach Versus Control
- MKT 645 Module 5 Affiliate and Partner Assignment: Affiliate and Partner Marketing Programs
- MKT 645 Module 6 Milestone Two: Online Channel Mix and Budget
- MKT 645 Module 8 Omnichannel Assignment: Integrating Online and Offline Channels
- CSR 610 Module 1 Discussion: Why Ethics Became a Business Problem in Ogden
- ACC 610 Module 7 Discussion: What IFRS Would Do Differently With Impairments
- MGT 510 Module 10 Final Project: The Culture Strategy
- INT 620 Module 9 Discussion: Cash Pools, Dividends and Transfer Prices
MKT 645 Module 7 questions, answered
Where can I find a free MKT 645 Module 7 Discussion sample?
The complete MKT 645 Module 7 post on this page questions a display vendor's report for a composite bird feeder maker and proposes a randomized test.
Why do display ad reports overstate results?
They often credit ads with every sale from people who saw them, including many who were already shopping and would have bought anyway.
What are ghost ads?
A measurement method that identifies people in a randomized control group who would have been shown an ad, so their behavior can be compared fairly with those who saw it.
Is retargeting effective?
It can be, but it reaches people already interested, so reported results overstate its effect; randomized tests show what it truly adds.
Can targeted ads backfire?
A field experiment found that ads both closely matched to content and visually intrusive lowered purchase intent compared with ads that were only one or the other, especially among privacy-conscious people.