| Course | NUR 301 Concepts of Professional Nursing Practice |
|---|---|
| Module | Module 8 |
| Paper type | Closing reflective journal entry |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | RN to BSN |
| Updated | October 2026 |
Free sample paper for NUR 301 Module 8
Module Eight Journal: Professional Growth Across the Term
The discharge I questioned
When this course began, I would have said that advocacy was a professional attribute I already had. I thought of it as being kind to patients and making sure they understood their medications. Over the term I came to see that advocacy is often less comfortable than that. It means speaking up when a decision about a patient seems wrong, to people who have more authority than I do, before I am certain.
In week five, I was caring for an 81-year-old man scheduled for discharge home after a fall. He lived alone, had not walked farther than the bathroom with a walker, and seemed more confused in the evening than in the morning. The discharge order had been written during morning rounds. I hesitated for most of the afternoon, then called the hospitalist and said plainly that I did not think he could manage safely alone that night and asked whether physical therapy and a case manager could see him first. The discharge was postponed one day, therapy recommended short-term rehabilitation, and he left for a skilled nursing facility instead.
The literature helped me understand why that afternoon of hesitation felt so long. A review of research on speaking up for patient safety found that health care professionals weigh their concern against their perceived position in the hierarchy, their expectation of how the listener will react, and whether they believe speaking up will make a difference (Okuyama et al., 2014). I recognized every one of those calculations in myself. Medical-surgical nurses describe advocacy as protecting patients and speaking on their behalf, yet also report that time pressure and the fear of being seen as difficult limit how often they act on it (Hanks, 2010). The Code of Ethics frames that duty as part of every nurse's practice rather than an optional kindness (American Nurses Association, 2015).
Both course projects pushed me in the same direction. My career goal in Project One requires consulting across disciplines, and my Project Two proposal asked nurses to speak to legislators. The habit I will keep is simple: when I have a safety concern, I will raise it within the hour, state it as a concern rather than an accusation, and ask for a specific action. Waiting until I am certain is too late.
References
American Nurses Association. (2015). Code of ethics for nurses with interpretive statements. Nursesbooks.org.
Hanks, R. G. (2010). The medical-surgical nurse perspective of advocate role. Nursing Forum, 45(2), 97-107. https://doi.org/10.1111/j.1744-6198.2010.00170.x
Okuyama, A., Wagner, C., & Bijnen, B. (2014). Speaking up for patient safety by hospital-based health care professionals: A literature review. BMC Health Services Research, 14, Article 61. https://doi.org/10.1186/1472-6963-14-61
What the NUR 301 Module 8 instructions ask for
Looking back over eight modules is the usual task for the last NUR 301 journal: how you have grown as a professional nurse. Many prompts ask which concept or attribute changed most for you and how you will apply it, and some ask you to connect the reflection to Project One or Project Two. Journals are commonly private between you and the instructor, so a personal voice is fine. Expect a short entry, often 300 to 500 words, with APA 7 citations if you draw on readings. A concrete example from practice is usually expected. Keep any patient details anonymous. Check the Module 8 prompt for required questions, since some versions list three or four to answer.
How this NUR 301 Module 8 journal example is built
The entry is built around one event rather than a summary of eight modules. The first paragraph names advocacy and admits the narrow way the writer once understood it. The middle paragraph tells the discharge story with the details that make it real: the patient's confusion, the order, what the nurse said to the physician and the result. The third paragraph uses two sources to explain the difficulty, one on the risks nurses feel when they speak up and one on how advocacy is defined in nursing. The closing paragraph names a specific habit, a question she will ask before any discharge she doubts, so the growth can be checked.
Where the NUR 301 Module 8 rubric puts the points
Closing journals are usually scored on a journal rubric whose rows judge how deep the reflection goes, how it uses course ideas and how it is written, rated from Exemplary to Not Evident. Depth is rewarded when the entry shows change, what you thought before and what you think now, through an example. The connection row looks for accurate use of course readings or other sources. Writing covers clarity and APA citations. Because this is the last assignment, some instructors also look for a link to the course outcomes or to the projects. Short, specific entries often outscore long ones, since graders are reading for insight rather than coverage.
NUR 301 Module 8 help: the mistakes that cost points
The most common weakness in a final journal is a list of everything covered in the course, with no single change shown. Another is a story with no reflection, a narrative of the event that never says what it taught. Some students drop citations because the entry is personal, then lose the connection row. Others reveal patient or colleague details that should be anonymous. Watch the length; a closing journal is not a final paper. Finally, end with something you will do, not just something you feel, since a habit or plan gives the instructor evidence that the reflection is real. Proofread once aloud; personal writing still counts toward the writing row.
Get NUR 301 Module 8 written to your instructions
Send the Module 8 journal prompt and rubric, plus a line on which attribute or course project you want to reflect on. A sample entry in that shape is written in 24 to 48 hours, and the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 301 papers and related RN to BSN samples
- NUR 301 Module 1 Journal: An ADN nurse weighs the BSN evidence
- NUR 301 Module 2 Short Paper: ANA Code and an unwitnessed waste
- NUR 301 Module 3 Project One Preparation: Hospice career goal preparation
- NUR 301 Module 4 Project One: Career path to WOC nursing
- NUR 301 Module 5 Policy Revision: Family presence during resuscitation policy
- NUR 301 Module 6 Project Two Preparation: Isolation among homebound older adults
- NUR 301 Module 7 Project Two: Rural birthing unit closure response
- NUR 431 Module 4 Project One Team Analysis: The Night Team Nobody Sees All at Once
- NUR 490 Module 8 Reflection Discussion: From doing the task to changing it
- NUR 303 Module 8 Final Reflection Paper: A Citizen With a License
- NUR 409 Module 2 Short Paper: Measuring Late Doses With Donabedian's Model
NUR 301 Module 8 questions, answered
What does the NUR 301 Module 8 journal usually ask?
Instructors often end the term with a journal about professional growth: how your understanding of professional nursing, its attributes and your own role has changed, often with reference to the two course projects. Some prompts ask you to name next steps. Your classroom instructions set the exact questions.
How personal should a final NUR 301 journal be?
Personal enough to be specific: one real situation described in general terms tells the instructor more than a list of lessons. Keep patients and colleagues unidentifiable, keep the tone professional, and connect the experience to at least one course concept or source.
Should I mention my Project One and Project Two in the final journal?
If the prompt invites it, yes. Linking the reflection to the career goal from Project One or the community issue from Project Two shows that the course formed a whole. A sentence or two on how each project changed your thinking is usually enough.
Where can I find a free NUR 301 Module 8 journal sample?
The complete closing entry is on this page: a reflection on advocacy built around one questioned discharge, with citations and references. Use it to see how one example can carry a reflection, then write about your own practice.
How do nursing scholars define patient advocacy?
Definitions vary, but most describe protecting the patient's interests and rights, informing patients and speaking up when care is unsafe or unwanted. Concept analyses in nursing journals compare these definitions and are useful sources for a reflection on advocacy.