| Course | NUR 301 Concepts of Professional Nursing Practice |
|---|---|
| Module | Module 1 |
| Paper type | Opening reflective journal entry |
| Length | About 420 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | RN to BSN |
| Updated | October 2026 |
Free sample paper for NUR 301 Module 1
Module One Journal: Why the BSN, and Why Now
Eleven years at the bedside and back in school
I have worked on a 28-bed general surgery unit for eleven years with an associate degree, and for most of that time I thought the BSN was a credential for people who wanted to leave the bedside. When I told my manager I had enrolled, I gave her the practical reason: our hospital now prefers the bachelor's degree for charge nurse roles, and I want to be considered. That reason is true, but it is not the whole story, and this first journal entry is a chance to look at the rest of it.
The research I read this week made the question harder to dismiss. Aiken et al. (2003) compared Pennsylvania hospitals by the share of their nurses who held a bachelor's degree and followed adult surgical patients through their stays. Where that share was higher, fewer patients died within a month of admission, and the gap was large enough that every 10-point rise in the bachelor's share went with roughly 5 percent lower odds of death and of failure to rescue. A national report later set a target of a nursing workforce in which four of every five nurses held a bachelor's degree by 2020 (Institute of Medicine, 2011), and a follow-up report placed nursing education within a broader goal of preparing nurses to address health equity and the conditions that shape health outside the hospital (National Academies of Sciences, Engineering, and Medicine, 2021).
What these sources do not tell me is that I am a less safe nurse today than I will be after this program. The 2003 study measured hospitals, not individuals, and an association across many hospitals says nothing about any single nurse. I know nurses with associate degrees who catch deterioration earlier than anyone on the floor. What the evidence suggests instead is that something in bachelor's preparation, perhaps the emphasis on evidence, systems and population health, changes how a nursing workforce performs as a group. That is a more interesting claim, and it gives me a reason to pay attention to the parts of this program I might otherwise treat as boxes to check.
My goal for NUR 301 is specific. By the end of the course I want to be able to explain, in a staff meeting, one change on our unit that should be based on evidence rather than habit, and cite the evidence. If I can do that, the degree will have changed my practice and not only my title.
References
Aiken, L. H., Clarke, S. P., Cheung, R. B., Sloane, D. M., & Silber, J. H. (2003). Educational levels of hospital nurses and surgical patient mortality. JAMA, 290(12), 1617-1623. https://doi.org/10.1001/jama.290.12.1617
Institute of Medicine. (2011). The future of nursing: Leading change, advancing health. The National Academies Press. https://doi.org/10.17226/12956
National Academies of Sciences, Engineering, and Medicine. (2021). The future of nursing 2020-2030: Charting a path to achieve health equity. The National Academies Press. https://doi.org/10.17226/25982
What the NUR 301 Module 1 instructions ask for
The first NUR 301 journal usually asks you to introduce yourself as a professional: your current role, why you are pursuing the BSN and what you expect the degree to change. Journals in SNHU courses are typically private, read only by the instructor, which allows a more personal voice than a discussion post. Many prompts still ask you to connect your reflection to course readings or to evidence about baccalaureate education. Expect a modest length, often 300 to 600 words, and APA 7 citations when you draw on a source. Some sections give a list of guiding questions to answer; others leave the shape open. Read the Module 1 journal prompt in Brightspace to see whether sources are required.
How this NUR 301 Module 1 journal example is built
The entry follows a short arc that keeps a personal piece analytical. The writer opens with her situation, eleven years on a surgical unit, and the reason she gave her manager for enrolling. She then sets that reason beside three sources: an outcomes study on baccalaureate staffing and two national reports on the educated workforce goal. The highlighted sentence shows her reading the study correctly, as evidence about hospital staffing patterns rather than proof that any one nurse becomes safer with a degree. She admits one doubt, that eleven years of experience already shaped her judgment, and leaves it unresolved. The entry ends with a goal she can check by the end of the program.
Where the NUR 301 Module 1 rubric puts the points
SNHU journal assignments are usually scored on a short journal rubric with rows such as reflection, connection to course concepts or evidence, and writing quality, each rated from Exemplary to Not Evident. The reflection row rewards honest self-assessment over enthusiasm; a statement that you love nursing earns less than a specific reason and a specific doubt. The connection row is where sources matter, and an entry that interprets a study accurately scores higher than one that only names it. Writing quality covers clarity, organization and APA citations where sources appear. Because journals are graded on thinking, not polish, a structured reflection with evidence often outscores a longer narrative.
NUR 301 Module 1 help: the mistakes that cost points
Opening journals often lose points by staying general: a page of career history with no reflection on what the degree means. Another frequent problem is overstating the research, for example claiming the BSN makes every nurse safer, when the outcomes studies describe hospital staffing levels. Some students skip citations because the journal is personal and then lose the connection row. Others write a resume in paragraphs. Keep the entry focused on one question, why the BSN and why now, and answer it with your own experience plus one or two sources. Finally, leave room for doubt; instructors respond well to a reflection that admits what you are not yet sure about.
Get NUR 301 Module 1 written to your instructions
Send the Module 1 journal prompt and rubric and a few lines about your own nursing background. The desk writes a sample entry to that prompt in 24 to 48 hours, and the first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 301 papers and related RN to BSN samples
- NUR 301 Module 2 Short Paper: ANA Code and an unwitnessed waste
- NUR 301 Module 3 Project One Preparation: Hospice career goal preparation
- NUR 301 Module 4 Project One: Career path to WOC nursing
- NUR 301 Module 5 Policy Revision: Family presence during resuscitation policy
- NUR 301 Module 6 Project Two Preparation: Isolation among homebound older adults
- NUR 301 Module 7 Project Two: Rural birthing unit closure response
- NUR 301 Module 8 Journal: Final journal on advocacy
- NUR 350 Module 8 Discussion: Truck depot near a school
- NUR 431 Module 7 Project Two Leadership Action Plan: A Nightly Cross-Department Safety Huddle
- NUR 490 Module 6 Capstone Presentation: Making infusion double checks independent
- NUR 499 Module 4 Advocacy Letter: Letter supporting a faculty loan bill
NUR 301 Module 1 questions, answered
What does NUR 301 Module 1 usually ask for?
Many sections open with a reflective journal or short introductory assignment in which the RN student describes their practice background, their reasons for pursuing the BSN, and how they see professional nursing. The prompt in your classroom sets the exact questions, and some versions ask you to connect the reflection to course readings.
Can I use first person in a NUR 301 journal?
Yes. Journals are one of the few places in the RN to BSN sequence where first person is expected, because the assignment asks about your own experience. Keep the tone professional, cite any claim about evidence or outcomes, and avoid sharing identifiable details about patients or colleagues.
Do NUR 301 journals need references?
It depends on the prompt, but citing one to three sources usually strengthens a journal entry, particularly when you make claims about why the BSN matters or how practice is changing. Instructors can see the difference between a reflection that engages the literature and one that repeats common opinions.
Where can I find a free NUR 301 Module 1 journal sample?
A complete entry is above: an associate-degree RN explains her return to school and checks her reasons against three real sources, in about 400 words. Use it as a model of structure, then write from your own situation.
What research links the BSN to patient outcomes?
The best-known study, by Aiken and colleagues in 2003, found lower surgical mortality in hospitals with a higher share of baccalaureate nurses. It describes staffing patterns across hospitals, so cite it as evidence about workforce mix rather than about individual nurses.