NUR 431 Module 2 Short Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 431 Module 2 short paper sample applies two leadership theories to the same night shift, showing how each changes what a leader actually does with three very different nurses. It meets the theory application assignment in SNHU NUR 431, Leadership Practices for the Professional Nurse, the RN to BSN course recorded as NUR-431. The composite setting is a 25-bed rural critical access hospital where the night house supervisor has a nurse three months out of school, a nurse with twenty years on the unit and a traveler on the first shift of a contract. Situational leadership explains why each nurse needs a different mix of direction and support tonight; transformational leadership explains how the supervisor builds a team that performs well when nobody is watching. The paper compares the two, uses systematic review evidence on leadership and nursing outcomes and ends with what the supervisor did differently.

CourseNUR 431 Leadership Practices for the Professional Nurse
ModuleModule 2
Paper typeLeadership theory application paper
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramRN to BSN
UpdatedOctober 2026

Free sample paper for NUR 431 Module 2

1

A New Graduate, a Veteran and a Traveler: Situational and Transformational Leadership on One Night Shift

[Student Name]

Southern New Hampshire University

NUR 431: Leadership Practices for the Professional Nurse

Module Two Short Paper

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the three followers before the two theories, signaling that the paper starts from people and uses theory to explain how to lead them.
2

A New Graduate, a Veteran and a Traveler: Situational and Transformational Leadership on One Night Shift

Leadership theories are easiest to learn in a classroom and hardest to use at 2 a.m. This paper takes one composite night shift at Ridgeline Community Hospital, a 25-bed critical access hospital, and applies two theories to it: situational leadership, which matches the leader's behavior to each follower's readiness, and transformational leadership, which aims to inspire followers toward shared goals and develop their capacity. It argues that situational leadership tells the night supervisor what each nurse needs tonight, while transformational leadership explains what kind of team the supervisor is trying to build over months, and that a good leader needs both. The hospital, staff and events are composites.

What this page is doingThe introduction defines both theories in plain language and states a thesis about how they complement each other, which is more analytical than choosing one.
3

The Shift

On the inpatient side that night were three registered nurses. Kai graduated three months ago and had just finished orientation. Pat has worked at Ridgeline for twenty years and knows every physician, every family in town and every workaround in the building. Morgan is a traveler on the first night of a thirteen-week contract, experienced in a large hospital but new to a setting where the lab technician is on call from home and the hospitalist appears on a screen. Around midnight, a swing-bed patient began to show early signs of sepsis, an emergency department patient needed admission, and the supervisor had to decide who should do what.

What this page is doingThe scenario gives each follower a distinct readiness profile, which is what makes situational leadership analysis possible. Names are used with no gendered pronouns.
4

Situational Leadership

Situational leadership, developed by Hersey and Blanchard, holds that no single style works for everyone; the leader adjusts the balance of directive behavior, telling people what to do and how, and supportive behavior, listening and encouraging, to the follower's readiness for a specific task (Hersey et al., 2013). Readiness combines ability and willingness or confidence, and it is task-specific: a nurse can be highly ready for one task and not for another.

Applied to this shift, Kai was willing but inexperienced with a deteriorating patient, which calls for a telling or guiding style: clear direction, specific steps and close follow-up. The supervisor assigned Kai the new admission, a lower-risk task, and checked in at set times. Pat was able and confident with sepsis recognition and knew the local escalation path, which calls for a delegating style: hand over the task and stay available. Pat took the swing-bed patient. Morgan was highly able clinically but unfamiliar with Ridgeline's systems, which calls for a participating style: shared decision-making with support on local processes. The supervisor paired Morgan with Pat to learn the on-call lab process during the sepsis workup, and asked Morgan how the larger hospital handled similar situations.

What this page is doingThe theory is summarized accurately and then applied task by task to each follower, including the important point that readiness is task-specific.
5

Transformational Leadership

Bass and Riggio (2006) describe transformational leadership through four elements: acting in ways that earn followers' trust and respect, offering a vision that gives the work meaning, pushing the team to rethink habits and try fresh approaches to old problems, and paying attention to each person's needs and growth. It is less about the next task and more about developing followers and building commitment to shared goals. On this shift, the supervisor's transformational work was smaller and slower. Asking Morgan what the previous hospital did differently was the third element, encouraging new thinking; it treated the traveler as a source of ideas, not only a pair of hands. Noticing Kai's anxiety and debriefing after the admission, including what went well, was attention to one person's growth. Staying calm, visible and honest about the risk to the septic patient modeled the behavior the supervisor wants from everyone.

What this page is doingThe four components are named with their source and each is illustrated with a small, specific action, which avoids the common trap of describing the theory in abstract terms.
6

What the Evidence Says

Research supports the value of relational leadership in nursing. In a systematic review of 129 quantitative studies, Cummings et al. (2018) reported that relational styles, transformational leadership among them, went along with more favorable results for nurses in areas such as job satisfaction, well-being and working relationships, whereas leaders focused narrowly on tasks saw worse results. A more recent systematic review focused on transformational leadership and concluded that it improves nurses' work environments both directly and indirectly, through structural empowerment, organizational commitment and job satisfaction, while noting that nurses rarely rated their own managers' transformational behavior as excellent (Ystaas et al., 2023). Neither review tested situational leadership directly, and both relied mostly on surveys, which limits claims about cause.

What this page is doingEvidence is reported accurately with its limits, and the paper notes what the reviews did not test. Honest use of evidence strengthens the theory analysis.
7

Comparing the Two Theories

The two theories answer different questions. Situational leadership answers, what does this nurse need from me for this task right now? It is practical and fast, which suits a night shift where the supervisor has minutes to make assignments. Its weakness is that it can reduce leadership to task matching, leaving little room for vision or development. Transformational leadership answers, what kind of team am I building and how do I help each person grow? It explains why the supervisor invests in debriefs and in asking the traveler's opinion, but it offers less guidance on the immediate assignment. Used together, they give the supervisor a way to be directive when safety demands it and developmental whenever there is room.

What this page is doingA direct comparison of strengths and weaknesses is usually an explicit rubric criterion, and here it leads to a synthesis rather than a winner.
8

What the Supervisor Did Differently

Before this analysis, the supervisor's habit was to give the sickest patient to the most experienced nurse and leave everyone else alone. That habit is partly situational, but it ignored readiness differences among the others and missed the chance to develop them. After this shift, the supervisor began assigning tasks with each nurse's readiness in mind, pairing travelers with long-time staff for local processes, and holding a five-minute debrief after any deterioration. Over the following month, two travelers asked to extend their contracts, and Kai asked to take the next sepsis patient with Pat as backup, a sign of growing readiness.

What this page is doingThe paper ends with changed behavior and early observable results, which demonstrates application, the core of a theory paper in a leadership course.
9

Conclusion

One night shift with three different nurses shows why leadership theory matters. Situational leadership guided the assignments that kept a septic patient safe and a new graduate supported. Transformational leadership explained the smaller acts, a question to a traveler and a debrief with a new nurse, that build a team able to handle the next night with less direction. The evidence favors relational leadership, and this shift showed that relational leadership still depends on sound task decisions.

What this page is doingThe conclusion restates the complementary relationship and ties it back to the evidence.
10

References

Bass, B. M., & Riggio, R. E. (2006). Transformational leadership (2nd ed.). Lawrence Erlbaum Associates.

Cummings, G. G., Tate, K., Lee, S., Wong, C. A., Paananen, T., Micaroni, S. P. M., & Chatterjee, G. E. (2018). Leadership styles and outcome patterns for the nursing workforce and work environment: A systematic review. International Journal of Nursing Studies, 85, 19-60. https://doi.org/10.1016/j.ijnurstu.2018.04.016

Hersey, P., Blanchard, K. H., & Johnson, D. E. (2013). Management of organizational behavior: Leading human resources (10th ed.). Pearson.

Ystaas, L. M. K., Nikitara, M., Ghobrial, S., Latzourakis, E., Polychronis, G., & Constantinou, C. S. (2023). The impact of transformational leadership in the nursing work environment and patients' outcomes: A systematic review. Nursing Reports, 13(3), 1271-1290. https://doi.org/10.3390/nursrep13030108

What the NUR 431 Module 2 instructions ask for

The Module 2 short paper in NUR 431 usually asks you to apply one or more leadership theories to a situation from practice. Typical prompts ask you to describe the theories, apply them to a specific scenario, compare their strengths and limitations, support your analysis with scholarly evidence and explain how the theories could improve your own leadership. Some sections assign particular theories, such as transformational, servant, situational or authentic leadership, while others let you choose. The paper usually runs three to four pages in APA 7. Picking a real situation with several people involved makes the application richer than a situation with only one follower, and makes the comparison between theories far easier to write.

How this NUR 431 Module 2 short paper example is built

This example uses a composite night shift at a rural critical access hospital with three nurses of very different readiness: a new graduate, a twenty-year veteran and a traveler new to the setting. It summarizes situational leadership with its source and applies it task by task, including the point that readiness is task-specific. It then applies the four components of transformational leadership through small, specific actions. Two systematic reviews support the value of relational leadership, with their limits noted. A comparison section explains what each theory answers, and the paper closes with changed leadership behavior and early observable results a month later.

Where the NUR 431 Module 2 rubric puts the points

Instructors usually grade this paper on how well each theory is explained, the application to a practice situation, the comparison of strengths and limitations, the use of evidence and the writing. Application carries the most weight, because the point is to see the theory change a decision or an action, not simply be described next to a scenario. The comparison criterion rewards papers that explain what each theory is good for rather than declaring one superior. Evidence earns full credit when it is reported accurately, including limits such as reliance on surveys. A short section on how the writer's leadership will change often lifts the application score by showing transfer beyond the scenario to the next shift and the next team.

NUR 431 Module 2 help: the mistakes that cost points

Many drafts of this paper open with two long paragraphs defining leadership theories followed by a short scenario that could fit any theory. Another is claiming a personal style, such as I am a transformational leader, with no evidence of what that looks like. Some papers misstate a theory, for example treating situational leadership as fixed personality types rather than task-specific readiness. Others cite leadership studies without noting their limits. Start with a real situation involving more than one person, apply each theory to specific decisions, compare them honestly and end with one change you will make on your next shift. Keep definitions short and let the scenario carry the paper.

Get NUR 431 Module 2 written to your instructions

Describe a shift or situation where you led others, name the theories your section assigns and share the Module 2 rubric. A theory application paper built on that situation arrives in 24 to 48 hours, and your first sample is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 431 papers and related RN to BSN samples

NUR 431 Module 2 questions, answered

Where can I find a free NUR 431 Module 2 short paper sample?

This page carries the complete paper free: situational and transformational leadership applied to one rural night shift with three different nurses, with evidence from two systematic reviews, a comparison, changed practice and four references. Versions on other theories can be requested.

What is situational leadership in nursing?

A theory in which the leader adjusts directive and supportive behavior to each follower's readiness for a specific task, so the same nurse may need more direction for one task and more autonomy for another.

What are the four components of transformational leadership?

Idealized influence, inspirational motivation, intellectual stimulation and individualized consideration. Together they describe a leader who builds commitment and develops followers.

Can I compare two leadership theories in NUR 431?

Yes, and many prompts ask for it. Explain what each theory is best at, where it falls short and how they might work together in your setting.

What evidence supports transformational leadership in nursing?

Systematic reviews associate relational leadership styles, including transformational leadership, with better nurse job satisfaction and work environments, though most studies are surveys that cannot prove cause.