| Course | NUR 440 Research & Evidence-Based Practice |
|---|---|
| Module | Module 8 |
| Paper type | Closing discussion post on EBP barriers |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | RN to BSN |
| Updated | October 2026 |
Free sample paper for NUR 440 Module 8
Module Eight Discussion: Barriers to Evidence-Based Practice
Re: Why we still do it this way
The clearest barrier to evidence-based practice I have seen is on my own unit. We flush saline locks every eight hours whether or not they are used, and when I asked why during this course, the answer from three different nurses was, "That is how we have always done it." The policy was last revised years ago, and nobody on the unit could name the evidence behind the eight-hour interval. When I searched for the evidence for my final project, I found that current infusion standards focus on flushing before and after each use and on assessing the site, rather than on a fixed clock time, and I could not find strong evidence that our schedule prevents occlusion better than other approaches.
My unit is not unusual. In a national survey of more than 1,000 registered nurses, most said they valued evidence-based care, yet many reported barriers such as resistance from colleagues, nurse leaders and managers, and nurses in Magnet hospitals and those with master's degrees reported different experiences from other nurses (Melnyk et al., 2012). What struck me is that the barrier on my unit was not a lack of caring about evidence; it was that no one owned the question of whether our routine still made sense. Habits that everyone learned in orientation feel like policy even when they are not.
This course gave me a process I did not have before: turning a complaint into a question, searching and appraising the evidence, and presenting a recommendation in a way leaders can act on (Melnyk & Fineout-Overholt, 2023). My plan is small. I have asked our educator for fifteen minutes at the next practice council meeting to present a one-page summary comparing our policy with the current infusion standards (Gorski et al., 2021), and to propose that a council member review the policy with pharmacy. I am not asking the unit to change overnight, only to ask the question formally.
My question for the group: when you raised a practice question on your unit, who turned out to be your most important ally, and how did you find that person?
References
Gorski, L. A., Hadaway, L., Hagle, M. E., Broadhurst, D., Clare, S., Kleidon, T., Meyer, B. M., Nickel, B., Rowley, S., Sharpe, E., & Alexander, M. (2021). Infusion therapy standards of practice, 8th edition. Journal of Infusion Nursing, 44(1S), S1-S224. https://doi.org/10.1097/NAN.0000000000000396
Melnyk, B. M., & Fineout-Overholt, E. (2023). Evidence-based practice in nursing and healthcare: A guide to best practice (5th ed.). Wolters Kluwer.
Melnyk, B. M., Fineout-Overholt, E., Gallagher-Ford, L., & Kaplan, L. (2012). The state of evidence-based practice in US nurses: Critical implications for nurse leaders and educators. Journal of Nursing Administration, 42(9), 410-417. https://doi.org/10.1097/NNA.0b013e3182664e0a
What the NUR 440 Module 8 instructions ask for
The final discussion in NUR 440 usually turns from appraising research to using it. Prompts often ask what stops evidence from reaching the bedside on your unit, what helps it get there and what a staff nurse can do about either. Most want one specific practice as the example and at least one scholarly source on barriers or implementation. A practice you have seen stay unchanged despite newer evidence, such as a flushing routine, a dressing schedule or a vital signs frequency, makes a good subject. The NUR 440 board usually has separate deadlines for the first post and for replies. Cite the survey or study you draw on in APA 7, and describe your unit without naming it.
How this NUR 440 Module 8 discussion example is built
The post begins with the habit: a heparin flush still used for certain peripheral lines although the unit's own policy references were two decades old. The second paragraph brings in a national survey of nurses on barriers to evidence-based practice and names the ones the writer recognizes, lack of time, a culture of doing things the usual way and leaders who do not prioritize it. The third paragraph explains how those barriers combine on her unit, where nobody owns policy review. The closing paragraph proposes one small step, taking two current sources to the practice council, and asks classmates who updates policies on their units and how often.
Where the NUR 440 Module 8 rubric puts the points
In NUR 440 the closing discussion is graded on the quality of the first post, the replies, posting on time and the writing, with NUR 440's usual four levels for each. A first post reaches the top level when its barriers are tied to evidence and to one practice the writer has seen, rather than listed from a textbook. Replies earn credit when they bring something new, such as how a classmate's unit cleared the same obstacle or a source on practice councils. Clarity counts, along with APA in-text citations for the barrier survey. Timeliness usually has a row of its own. A post about barriers that also proposes a step tends to draw the most useful replies.
NUR 440 Module 8 help: the mistakes that cost points
Barrier posts often list the usual obstacles, time, resources and resistance, without any example. One practice and one unit make a stronger post. Another common gap is criticizing colleagues or managers in a way that sounds like a complaint rather than an analysis. Some students skip the plan, which leaves the post with a problem and no response. Others cite no sources even though the prompt asks for one. Keep the unit and colleagues unidentifiable. Finally, make the plan small and real; a NUR 440 post that proposes a full hospital culture change is less convincing than one that names a single meeting and two articles. Reply to at least one classmate whose barrier differs from yours.
Get NUR 440 Module 8 written to your instructions
Send your final NUR 440 discussion prompt and rubric plus a practice from your own unit you would like to discuss. The desk writes a post to that prompt within 24 to 48 hours, and your first sample is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 440 papers and related RN to BSN samples
- NUR 440 Module 1 Short Paper: Appraising a vapocoolant spray trial
- NUR 440 Module 2 Milestone One: PICOT on delayed cord clamping
- NUR 440 Module 3 Annotated Bibliography: Annotated bibliography on therapy dogs
- NUR 440 Module 4 Levels of Evidence Paper: Ranking the evidence on honey for cough
- NUR 440 Module 5 Evidence Appraisal: Falls prevention evidence appraisal
- NUR 440 Module 6 Evidence Synthesis: Awake prone positioning evidence matrix
- NUR 440 Module 7 Final Project: Integrative Review: Integrative review of ICU diaries
- NUR 431 Module 6 Short Paper: Emotional Intelligence and Self-Care at Night
- NUR 411 Module 1 Short Paper: Research, EBP and QI Told Apart
- NUR 305 Module 3 Short Paper: Teen confidentiality and proxy portal access
- NUR 307 Module 6 Project Two Implementation Plan: Rolling Out Pump Tracking on a Nursing Unit
NUR 440 Module 8 questions, answered
What does the NUR 440 Module 8 discussion usually ask?
Module Eight of NUR 440 commonly closes with a reflection on evidence-based practice in the student's own setting: barriers and facilitators, how they would disseminate their final project findings, or what they learned about using research. Instructors generally expect a specific example supported by at least one source and substantive replies to peers.
What are common barriers to evidence-based practice?
Surveys of nurses repeatedly identify lack of time, limited access to evidence or skills to appraise it, resistance from colleagues or managers, and organizational cultures that value tradition. Facilitators include mentors, protected time, leadership support and a clear process for proposing practice changes.
How can a staff nurse start a practice change?
Start small and use the organization's existing structures. Frame a clear question, find and appraise the best evidence, compare it with current policy, and bring a short summary to the unit practice council or educator. Partnering with a colleague and a leader increases the chance the change is heard.
Where can I find a free NUR 440 Module 8 discussion sample?
Read the whole post above: an account of why one unit's flushing protocol still follows an old habit, with national survey evidence on barriers and a small plan to change it. Use it as a model and write about your own unit.
What is a nursing practice council?
It is a shared governance group of staff nurses that reviews and updates unit or hospital practice, often including policies and protocols. Bringing current evidence to a practice council is one of the most direct routes a staff nurse has to change an outdated routine.