| Course | NUR 506 Evidence-Based Practice |
|---|---|
| Module | Module 2 |
| Paper type | PICOT development paper |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MSN |
| Updated | October 2026 |
Free sample paper for NUR 506 Module 2
Three Drafts to One Question: Building a PICOT Question on Ice Chips and Mucositis During Fluorouracil Chemotherapy
[Student Name]
Southern New Hampshire University
NUR 506: Evidence-Based Practice
Module Two PICOT Development Paper
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Three Drafts to One Question: Building a PICOT Question on Ice Chips and Mucositis During Fluorouracil Chemotherapy
The Practice Problem
In a composite outpatient infusion center, many adults receiving fluorouracil-based chemotherapy for colorectal and other gastrointestinal cancers return for their second cycle with painful mouth sores. Oral mucositis makes eating and drinking difficult, can lead to weight loss and dehydration, and sometimes forces a dose reduction or delay in chemotherapy. Some nurses on the unit offer patients ice chips during the infusion; others do not, and nobody is sure whether it helps or what the right way to do it would be. That inconsistency is the starting point for this question.
Draft One
The first draft was the question as it was asked in the hallway: does ice help prevent mouth sores in chemotherapy patients? A trial search in CINAHL and PubMed using the words ice, mouth sores and chemotherapy returned a scattered mix of results, including articles on radiation to the head and neck, children with leukemia, dental care and cold caps for hair loss. The draft had no defined population, used lay language that researchers rarely use, and had no comparison or measurable outcome. It was a good conversation starter and a poor search.
Draft Two
The second draft used the structure of PICO, which is known to make searches more precise (Schardt et al., 2007): in adults receiving chemotherapy, does oral cryotherapy compared with no cryotherapy reduce oral mucositis? Replacing ice with oral cryotherapy and mouth sores with oral mucositis, the terms used in the research literature, brought up far more relevant studies, including a Cochrane review. But the population was still too broad. Chemotherapy regimens differ in how they cause mucositis, and the review found that cryotherapy had been studied mainly in two groups: adults receiving fluorouracil-based chemotherapy for solid tumors and adults receiving high-dose melphalan before stem cell transplant (Riley et al., 2015). Evidence from one group might not apply to the other, and neither group matched every patient in the center. The draft also lacked a time frame and a clear definition of the outcome.
Draft Three
The final question reads: in adults receiving bolus fluorouracil-based chemotherapy for gastrointestinal cancers (P), does holding ice chips in the mouth for 30 minutes starting just before the bolus dose (I), compared with standard oral care alone (C), reduce the incidence of moderate to severe oral mucositis (O) during the first two treatment cycles (T)?
Each element was revised for a reason. The population now matches the patients actually treated in the center and the group in which cryotherapy has been studied. The intervention names a timing and duration, because the protective effect depends on cooling the mouth while drug levels are highest after a bolus dose, and an international guideline recommends 30 minutes of oral cryotherapy for patients receiving bolus fluorouracil (Elad et al., 2020). The comparison is standard oral care rather than nothing, because every patient already receives mouth care instructions. The outcome is moderate to severe mucositis, which is what limits eating and leads to dose changes, and the time frame covers the early cycles when the problem was noticed.
The Final Question Ready for Searching
The table below breaks the final question into searchable elements for the next module's search.
Table 1
Final PICOT Elements With Search Terms
| Element | Final wording | Synonyms and related terms | Example subject headings |
|---|---|---|---|
| Population | Adults receiving bolus fluorouracil-based chemotherapy for gastrointestinal cancers | 5-FU, fluorouracil, colorectal cancer, gastrointestinal neoplasms | Fluorouracil; Colorectal Neoplasms |
| Intervention | Ice chips held in the mouth for 30 minutes | Oral cryotherapy, ice chips, oral cooling | Cryotherapy; Ice |
| Comparison | Standard oral care alone | Usual care, no cryotherapy | None needed |
| Outcome | Moderate to severe oral mucositis | Stomatitis, oral mucositis, mouth ulcers | Stomatitis; Mucositis |
| Time | First two treatment cycles | Not searched; used to judge relevance | None needed |
Note. Subject headings will be confirmed in each database's thesaurus before searching.
Testing the Question With Colleagues
Before finalizing the question, the nurse shared the third draft with two infusion nurses, the unit's oncology pharmacist and a patient advisor who had received fluorouracil. Their comments sharpened it further. The pharmacist confirmed which of the center's regimens include a bolus dose, since some patients receive fluorouracil only as a continuous infusion through a portable pump over two days, and cooling the mouth for 30 minutes would make little sense for them. The nurses pointed out that the center already grades mucositis with a standard toxicity scale at every visit, which means the outcome could later be measured with existing data. The patient advisor raised a practical concern: holding ice for half an hour is uncomfortable, and some patients have sensitive teeth. That comment did not change the question, but it added acceptability and adherence as factors to look for when the studies are read.
Why This Question Matters
The final question addresses a problem that affects many patients in the center, involves an intervention that costs almost nothing and is within nursing's control, and leads to a decision the unit can act on. A preliminary look at the literature suggests the question is answerable: the Cochrane review found that oral cryotherapy probably lowers the rate of mucositis, at any grade, among adults treated with fluorouracil-based regimens, with moderate quality evidence (Riley et al., 2015). Because this is a question about the effect of an intervention, the strongest evidence will come from randomized controlled trials and systematic reviews of those trials, which is where the search will begin.
Lessons From Revising
Three lessons from this process will carry into later questions. First, the words patients and nurses use are rarely the words in the literature, so the first search is often a vocabulary lesson. Second, a population that seems specific at the bedside, such as chemotherapy patients, may hide important differences that researchers treat as separate groups. Third, the details of an intervention, such as its timing and duration, matter as much as its name, because a unit cannot adopt a practice it cannot describe exactly. A question that has survived three drafts and two trial searches is far more likely to produce an answer the infusion center can use.
Conclusion
Revising a PICOT question through several drafts, and testing each one against a database, turned a hallway question about ice into a precise, searchable question about oral cryotherapy during bolus fluorouracil chemotherapy. The final version defines the patients, the intervention's timing and duration, a realistic comparison, a clinically meaningful outcome and a time frame, and it is ready to guide a documented search.
References
Elad, S., Cheng, K. K. F., Lalla, R. V., Yarom, N., Hong, C., Logan, R. M., Bowen, J., Gibson, R., Saunders, D. P., Zadik, Y., Ariyawardana, A., Correa, M. E., Ranna, V., & Bossi, P. (2020). MASCC/ISOO clinical practice guidelines for the management of mucositis secondary to cancer therapy. Cancer, 126(19), 4423-4431. https://doi.org/10.1002/cncr.33100
Riley, P., Glenny, A.-M., Worthington, H. V., Littlewood, A., Clarkson, J. E., & McCabe, M. G. (2015). Interventions for preventing oral mucositis in patients with cancer receiving treatment: Oral cryotherapy. Cochrane Database of Systematic Reviews, (12), Article CD011552. https://doi.org/10.1002/14651858.CD011552.pub2
Schardt, C., Adams, M. B., Owens, T., Keitz, S., & Fontelo, P. (2007). Utilization of the PICO framework to improve searching PubMed for clinical questions. BMC Medical Informatics and Decision Making, 7, Article 16. https://doi.org/10.1186/1472-6947-7-16
What the NUR 506 Module 2 instructions ask for
The Module 2 assignment in NUR 506 is likely to ask you to develop a PICOT question for an evidence-based practice project. Many prompts ask you to state the clinical problem, write the question, define each element, explain the type of question, such as intervention, prognosis or meaning, and justify its significance. In some NUR 506 sections the drafts themselves must appear, with the test search that changed each one. NUR 506 expects APA 7 with a few sources showing the problem and the existence of research. The question you write here usually carries through the course, so narrow it carefully. Check the Module 2 guidelines in Brightspace for whether drafts must be included.
How this NUR 506 Module 2 picot development paper example is built
The paper opens with the practice problem, patients getting fluorouracil who develop painful mouth sores, and the hallway question that started the project. Draft one is too broad and returns thousands of results. Draft two names the drug and the intervention but uses an outcome nobody measures the same way. Draft three adds a mucositis grading scale and a time frame. Each draft section reports the test search and the change it prompted. The final question is laid out element by element. A short section tests it with two colleagues, who suggest adding the comparison of usual mouth care. Significance and lessons from revising close the paper.
Where the NUR 506 Module 2 rubric puts the points
A NUR 506 question development paper usually lists the clinical problem, the finished PICOT, each element's definition, significance and sources as its rubric rows, with NUR 506 using SNHU's Exemplary to Not Evident levels. The question row carries the most weight; graders want every element named precisely, such as bolus fluorouracil and a named mucositis scale, and a question that can be searched. Definitions earn credit when each element is specific, such as a named drug and a named scale. Significance rewards evidence that the problem matters. Showing revision is often credited because it demonstrates how the question was tested. Clarity and APA formatting are separate rows.
NUR 506 Module 2 help: the mistakes that cost points
PICOT papers often lose points by presenting a finished question with no sign of how it was tested. Another common gap is a vague intervention, such as cold therapy, when the evidence is about a specific practice like ice chips for thirty minutes. Some students choose an outcome no study measures. Others leave out the comparison. Watch the question type; an intervention question needs a comparison, while a meaning question does not. Finally, run a real search on each draft, since a NUR 506 grader can tell when revisions were invented rather than driven by what a database actually returned. Keep the counts and dates from each test. Paste the final string into the paper exactly as typed.
Get NUR 506 Module 2 written to your instructions
Send your NUR 506 Module 2 instructions, the rubric and your draft question, however rough. A PICOT paper developed from it comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 506 papers and related MSN samples
- NUR 506 Module 1 Clinical Question Discussion: Night noise, delirium and a PICOT question
- NUR 506 Module 3 Search Strategy Paper: Reproducible search on warm compresses
- NUR 506 Module 4 Critical Appraisal Paper: Appraising the SCALP scalp cooling trial
- NUR 506 Module 5 Evidence Table Paper: Evidence table on heel-lance comfort
- NUR 506 Module 6 Evidence Synthesis Paper: Synthesis on oropharyngeal colostrum
- NUR 506 Module 7 Implementation Plan Paper: Implementing hip protectors in a nursing home
- NUR 506 Module 8 Final Evidence-Based Practice Proposal: Proposal for parent-given tub baths
- NUR 607 Module 4 Focused Cardiac Exam: A Murmur at a Sports Physical
- NUR 634 Module 9 Final Project: The Complete Teaching Innovation Proposal
- NUR 640 Module 9 Final Project: A Complete Assessment and Evaluation Plan for a Medical-Surgical Course
- NUR 530 Module 7 Milestone Two: A Draft Implementation Plan for Afternoon Discharge Huddles
NUR 506 Module 2 questions, answered
What is NUR 506 Module 2 likely to ask for?
After identifying a practice problem, evidence-based practice courses usually ask students to write a formal PICO or PICOT question, explain each element and show how the question will guide the literature search. Some prompts ask for a revised version of an earlier question. Check your instructions for required elements.
Why should I test my PICOT question with a search?
A question can look well built and still fail in a database, either returning thousands of irrelevant results or almost none. Running a quick search on each draft shows whether the population is too broad, the intervention is named in words researchers do not use, or the outcome is not one studies measure.
What is oral cryotherapy?
Oral cryotherapy means cooling the mouth, usually by having the patient hold ice chips or ice water in the mouth, during chemotherapy infusion. Cooling narrows blood vessels in the mouth and is thought to reduce the amount of drug reaching the oral lining, which lowers the risk of painful mucositis.
Where can I find a free NUR 506 Module 2 PICOT example?
The full paper is on this page: three drafts of a PICOT question on ice chips and mouth sores during fluorouracil chemotherapy, each revised after a test search. Use it to see a question built rather than announced.
Does sucking ice chips prevent mouth sores during chemotherapy?
For bolus fluorouracil, a Cochrane review by Riley and colleagues found oral cryotherapy reduced the severity of oral mucositis. The benefit depends on the drug and schedule, so a PICOT should name them.