NUR 506 Module 3 Search Strategy Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 506 Module 3 paper documents a literature search from start to finish so that a second nurse following it would land on the same studies. SNHU NUR 506 (NUR-506) asks MSN students to search the literature systematically, and the sample is organized like the methods section of a review. A composite labor and delivery nurse searches for evidence on warm perineal compresses during the second stage of labor. The paper lists the question and its concepts, search terms for each concept and how they were combined with subject headings and Boolean operators. It reports how the strategy changed after the first run. A search log table records each database, date, string and result count. Screening counts, the key sources and the blind spots of the search, such as non-English trials, finish the paper.

CourseNUR 506 Evidence-Based Practice
ModuleModule 3
Paper typeSearch strategy paper with search log
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedOctober 2026

Free sample paper for NUR 506 Module 3

1

A Search Another Nurse Could Repeat: Documenting the Evidence Search on Warm Perineal Compresses in Second-Stage Labor

[Student Name]

Southern New Hampshire University

NUR 506: Evidence-Based Practice

Module Three Search Strategy Paper

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingReproducibility, the test this paper sets for itself, is announced in the main title, while the subtitle identifies the topic and the stage of labor involved. The reader knows to expect exact search details rather than a summary of findings.
2

A Search Another Nurse Could Repeat: Documenting the Evidence Search on Warm Perineal Compresses in Second-Stage Labor

The Question and Its Concepts

On a composite 22-bed labor and delivery unit, midwives routinely apply warm compresses to the perineum during pushing, while some nurses and physicians do not, and the unit has no guideline. The question guiding this search is: in women giving birth vaginally (P), does applying warm compresses to the perineum during the second stage of labor (I), compared with no compresses (C), reduce third- and fourth-degree perineal tears (O) at birth (T)?

The question contains three searchable concepts: vaginal birth or the second stage of labor, warm compresses, and perineal trauma. The comparison and time are used to judge relevance during screening rather than as search terms. Searching for concepts rather than for the whole question keeps the search broad enough to find studies that describe the same thing in different words.

What this page is doingThe paper separates the question into concepts and explains why not every element is searched. That explanation shows understanding of how searches work, not only which words were used.
3

Search Terms and Combination

For each concept, the search used both subject headings and keywords. For labor, the headings Labor Stage, Second in PubMed and Labor Stage, Second in CINAHL were combined with keywords such as second stage, pushing and vaginal birth. For warm compresses, no specific heading exists, so keywords were used: warm compress, warm pack, hot compress and heat, with truncation such as compress* to capture compress and compresses. For perineal trauma, the headings Perineum and Obstetric Lacerations (PubMed) and Perineal Injuries (CINAHL) were combined with keywords including perineal tear, laceration, obstetric anal sphincter injury and OASIS.

Synonyms for the same concept were linked by OR so that any of them would retrieve a record, and AND then required all three concepts to appear together. Phrases were placed in quotation marks. Limits were kept to a minimum: English language and publication from 2000 onward. No study design filter was applied at first so that systematic reviews, trials and guidelines would all appear.

Refining the Strategy After the First Run

The first PubMed search, run before this log was finalized, used only the keyword warm compress and returned 11 records, several of them letters and commentaries. Reviewing the relevant records showed why the search was too narrow. Australian researchers used the term warm pack, some trials described the intervention as hot compresses, and many studies indexed their outcome under obstetric lacerations rather than perineal tears. Each of these terms was added to the strategy, which raised the PubMed result to 41 records with a much higher share of trials. Reading the subject headings assigned to two known relevant studies, a technique sometimes called pearl growing, was the quickest way to find the vocabulary that indexers had used.

A second refinement concerned outcomes. An early version of the search included pain and satisfaction as a fourth concept, but that excluded trials that reported perineal outcomes and not comfort. Because severe tears are the primary outcome, the pain concept was removed from the search and pain was treated as a secondary outcome to note during screening. Documenting these changes matters, because a reader who sees only the final strategy cannot tell which decisions shaped it.

Search Log

The table below records the searches exactly as run. Reporting guidance for literature searches recommends documenting each database, platform, date, full strategy and limits so that a search can be reproduced (Rethlefsen et al., 2021).

Table 1

Search Log for Warm Perineal Compresses

SourceDateStrategy summaryLimitsResults
PubMedSept 8(second stage OR pushing OR Labor Stage, Second[MeSH]) AND (warm compress* OR warm pack* OR hot compress*) AND (perine* OR Obstetric Lacerations[MeSH])English; 2000 to present41
CINAHL Complete (EBSCO)Sept 8Same concepts with CINAHL Headings Labor Stage, Second and Perineal InjuriesEnglish; 2000 to present36
Cochrane LibrarySept 9warm compress AND perinealNone4 reviews; 18 trials
Guideline sourcesSept 9Professional body websites searched for perineal care guidanceNone3
Reference listsSept 10Hand search of included reviewNone2 additional

Note. Full strings, exactly as entered, are saved in the appendix of the student's search file.

What this page is doingThe log gives the reader everything needed to rerun the search, including dates and platforms. Recording results from reference lists and guideline sites shows that the search extended beyond two databases.
4

Screening the Results

After duplicates were removed, 68 unique records remained. Titles and abstracts were screened against three criteria: the study included women having a vaginal birth, it tested warm compresses applied during the second stage, and it reported perineal trauma outcomes. Studies of perineal massage during pregnancy, of cold packs after birth for pain, and of episiotomy technique were excluded. Twelve records remained for full-text review, and seven were retained: one Cochrane systematic review, four randomized controlled trials and two clinical guidance documents. The flow from records identified to records included was recorded in a diagram following the structure of the PRISMA reporting guideline, adapted for a practice question rather than a full systematic review.

The Key Sources Found

The most important source is a Cochrane review of perineal techniques during the second stage of labor. It included 22 trials and found that warm compresses made no clear difference to the chance of an intact perineum, but that fewer third- and fourth-degree tears were reported with warm compresses, with the evidence rated as moderate quality (Aasheim et al., 2017). One of the included trials, conducted in two Sydney hospitals with 717 first-time mothers, found fewer third- and fourth-degree tears with warm packs and reported that women and midwives found the packs comforting (Dahlen et al., 2007). These sources will be appraised in detail in the next module.

Limits of the Search and Next Steps

The search has limits. Restricting to English may have missed trials from non-English-speaking countries, where some perineal research has been done. Only two bibliographic databases were searched; adding Embase and a trials register would reduce the chance of missing unpublished studies. Keywords for the intervention were chosen by the nurse and may have missed terms such as warm towel or heated pad. Before appraisal, a health sciences librarian will review the strategy, and one additional search will be run using the missed terms and a trials register.

Conclusion

This search translated a clinical question about warm compresses into three concepts, combined subject headings and keywords with Boolean logic, and recorded every step so that another nurse could reproduce it. It identified a Cochrane review and several trials suggesting that warm compresses may reduce severe perineal tears. The documentation, rather than the number of results, is what makes the search trustworthy and ready for appraisal.

References

Aasheim, V., Nilsen, A. B. V., Reinar, L. M., & Lukasse, M. (2017). Perineal techniques during the second stage of labour for reducing perineal trauma. Cochrane Database of Systematic Reviews, (6), Article CD006672. https://doi.org/10.1002/14651858.CD006672.pub3

Dahlen, H. G., Homer, C. S., Cooke, M., Upton, A. M., Nunn, R., & Brodrick, B. (2007). Perineal outcomes and maternal comfort related to the application of perineal warm packs in the second stage of labor: A randomized controlled trial. Birth, 34(4), 282-290. https://doi.org/10.1111/j.1523-536X.2007.00186.x

Rethlefsen, M. L., Kirtley, S., Waffenschmidt, S., Ayala, A. P., Moher, D., Page, M. J., Koffel, J. B., & PRISMA-S Group. (2021). PRISMA-S: An extension to the PRISMA statement for reporting literature searches in systematic reviews. Systematic Reviews, 10, Article 39. https://doi.org/10.1186/s13643-020-01542-z

What the NUR 506 Module 3 instructions ask for

In Module 3, NUR 506 turns your PICOT question into a documented search. Most prompts want the databases, the free-text words and controlled vocabulary for each concept, the Boolean logic, the limits applied, the counts returned and the screening steps. Some sections ask for a search log or a flow description. The point is reproducibility, so record exact strings and dates. NUR 506 expects APA 7 for the sources found. Use the Shapiro Library databases, typically CINAHL, PubMed and the Cochrane Library. Check the Module 3 guidelines for whether a minimum number of databases or a PRISMA-style count is required.

How this NUR 506 Module 3 search strategy paper example is built

The paper begins with the question and breaks it into concepts: the second stage of labor, warm compresses and perineal trauma. The terms section lists keywords and subject headings for each concept and explains combining synonyms with OR and concepts with AND. The refinement section reports that the first run missed studies using the term hot packs and was revised. A log table records CINAHL, PubMed and Cochrane searches with dates, strings, limits and counts. Screening describes removing duplicates and reading titles, abstracts and full texts, with numbers at each stage. The key sources, a Cochrane review and two trials, are listed, and limits note that only English-language studies were included.

Where the NUR 506 Module 3 rubric puts the points

A NUR 506 search paper is likely graded on rows for the search terms and strategy, the databases and limits, the documentation and the screening, with NUR 506 rows scored on SNHU's four levels. Documentation carries heavy weight; graders reward a log detailed enough to repeat. The strategy row looks for both keywords and subject headings combined correctly. Screening earns credit when numbers at each stage are reported. Limits should be justified, not just listed. Some rubrics add a row for the relevance of sources found. A well-labeled log table also helps the writing and APA rows, since the grader can match each count to its string. Screening numbers that add up across stages show care.

NUR 506 Module 3 help: the mistakes that cost points

Search papers often lose points because the strategy cannot be repeated: no dates, no exact strings, no counts. Another common gap is searching one database with one keyword. Some students list subject headings without explaining how they were combined. Others skip screening, so the reader cannot see how hundreds of results became four sources. Watch limits; restricting to five years can exclude the key trial. Finally, record the search as you go rather than reconstructing it, since a NUR 506 grader can tell when counts and dates were filled in afterward and the log no longer adds up. Ask a Shapiro Library librarian to review the strategy if your section allows it. Note the review in the paper.

Get NUR 506 Module 3 written to your instructions

Send your NUR 506 search assignment, the rubric and your PICOT question. A search paper documented to that question is written within 24 to 48 hours, and the first sample is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 506 papers and related MSN samples

NUR 506 Module 3 questions, answered

What does a NUR 506 search strategy assignment usually require?

Expect to name the databases you searched, your keywords and subject headings, how you combined them with Boolean operators, the limits you applied and the number of results at each step. Many prompts also ask how you selected the final sources. Your classroom instructions set the exact elements.

What makes a literature search reproducible?

Recording everything another person would need to repeat it: each database and platform, the date searched, the full search string exactly as entered, every limit applied and the number of results. Reporting guidance for searches recommends documenting all of these details.

Should I include both keywords and subject headings?

Yes. Subject headings, such as MeSH in PubMed or CINAHL Headings, find articles indexed on a concept even when authors use different words, while keywords find recent articles not yet indexed and terms the headings miss. Combining both gives a more complete search.

Where can I find a free NUR 506 Module 3 search strategy sample?

One is above in full: a documented search on warm perineal compresses in second-stage labor, with concepts, terms, a search log, screening counts and the key sources. Use it to see a search another nurse could repeat.

Do warm compresses reduce perineal tears in labor?

A Cochrane review by Aasheim and colleagues found warm compresses during the second stage of labor were associated with fewer third- and fourth-degree tears. The evidence quality was moderate, so many units include compresses in perineal care bundles.