| Course | NUR 631 Strategic Skills for Nurse Executive Leaders |
|---|---|
| Module | Module 10 |
| Paper type | Closing reflective journal on nurse executive leadership |
| Length | About 400 words, 3 pages |
| Format | Journal entry with APA 7 citations |
| School | Southern New Hampshire University |
| Program | MSN |
| Updated | October 2026 |
Free sample paper for NUR 631 Module 10
Module Ten Journal
The Spreadsheet and the Conversation
I started this course believing I was good with people and bad with numbers. As a charge nurse I can calm a family, settle a scheduling fight and talk a new graduate through a bad night. A spreadsheet made me anxious. By the end of the term I had learned that I needed the numbers to be heard and that I had been less skilled with people than I thought, at least with people who did not share my view of the problem.
The business case was the turning point on numbers. Working from a base rate to a loaded cost, then from paid to productive hours, I could finally see why finance officers distrust nursing requests that say "we need more staff" without arithmetic. The most useful moment was discovering that one of my options, the virtual nursing pilot, did not pay for itself. My first instinct was to hide that. Presenting it honestly, as a test with a stopping rule, made the rest of the case more believable.
The shift on people came from the negotiation memo and the stakeholder map. Writing down the chief financial officer's interests, protecting a thin margin and avoiding permanent costs for uncertain savings, I realized I had always cast finance as the obstacle. Fisher et al. (2011) argue that agreements built on interests rather than positions last longer, and when I listed both sides' interests, most of them overlapped. The union, too, had concerns I would have dismissed as resistance: floating to unfamiliar units and cameras used to judge nurses. Those were fair worries, and meeting them in writing was the price of their support.
The research kept the human stakes in view. Burnout was reported by nearly half the nurses in a large multihospital survey, and it was linked to turnover (Aiken et al., 2023). Every line in my spreadsheet stood for a nurse on a night shift with too many patients. And the change analysis reminded me why good ideas vanish: without urgency, a broad coalition and permanent structures, even a helpful role gets absorbed into the next short-staffed day (Kotter, 2012).
I will carry two habits forward. I will never bring a request to finance without the arithmetic and an honest account of what might not work. And before any change, I will write down, in their words, what each group affected by it stands to gain and lose.
References
Aiken, L. H., Lasater, K. B., Sloane, D. M., Pogue, C. A., Fitzpatrick Rosenbaum, K. E., Muir, K. J., & McHugh, M. D. (2023). Physician and nurse well-being and preferred interventions to address burnout in hospital practice: Factors associated with turnover, outcomes, and patient safety. JAMA Health Forum, 4(7), Article e231809. https://doi.org/10.1001/jamahealthforum.2023.1809
Fisher, R., Ury, W., & Patton, B. (2011). Getting to yes: Negotiating agreement without giving in (3rd ed.). Penguin Books.
Kotter, J. P. (2012). Leading change. Harvard Business Review Press.
What the NUR 631 Module 10 instructions ask for
In the last week of NUR 631, the journal prompt turns inward: which of your assumptions about executive leadership did the course test, and what will you do differently in a leadership role? Some prompts name competencies such as financial management, strategic planning or relationship building. Entries are commonly 400 to 700 words, written personally, and often expected to cite a source or two in APA 7. Build the reflection on concrete moments from specific assignments, such as a calculation that surprised you or a stakeholder whose view you misjudged, and end with habits precise enough that a colleague could see you practice them in your next position. Specific beats sweeping.
How this NUR 631 Module 10 journal example is built
The entry belongs to a composite cardiac step-down charge nurse who hopes to become a director and who came in confident with people and anxious about numbers. It shows the first shift through the business case, especially the decision to present an unprofitable virtual nursing pilot honestly as a test. The second shift comes from the negotiation memo and stakeholder map, which revealed that finance and the union had legitimate interests she had overlooked, supported by Fisher and colleagues on interest-based negotiation. Burnout research and Kotter's change model keep nurses and sustainability in view, and the entry closes with two concrete habits for her next role.
Where the NUR 631 Module 10 rubric puts the points
Closing journals in NUR 631 are generally marked on the honesty and depth of the self-assessment, the link between lessons and course assignments, relevance to executive leadership, use of sources and writing quality. Entries score well when they describe a specific belief the course challenged and show how it changed through a particular piece of work. Graders value writers who admit discomfort or error, because leadership growth usually starts there. Concrete habits for practice demonstrate application, and a focused entry built on one or two shifts in thinking tends to show more insight than a module-by-module review of the course, which graders often read as summary.
NUR 631 Module 10 help: the mistakes that cost points
Final leadership reflections lose marks when they repeat the course outline, claim transformation without showing a moment that caused it, leave out sources or end with promises such as leading with integrity that no one could observe. Name a belief you held at the start, show the assignment that tested it, connect the lesson to a source and state habits a colleague could watch you practice. Write in your own voice within the length allowed. Where the prompt requires you to address particular competencies or a leadership framework, send it with a few notes about your assignments, and a reflection can be drafted from your own work this term and the leadership role you are aiming for.
Get NUR 631 Module 10 written to your instructions
Share the journal prompt, any competencies it asks you to address and a line or two about the work that shifted your view. Expect a personal reflection grounded in those moments, supported by sources and ending in observable habits, within 24 to 48 hours, at no cost the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More NUR 631 papers and related MSN samples
- NUR 631 Module 1 Discussion: Thinking Like a Chief Nursing Officer
- NUR 631 Module 2 Environmental Scan: A SWOT of Medical-Surgical Staffing
- NUR 631 Module 3 Milestone One: Framing the Staffing Issue With Data
- NUR 631 Module 4 Change Analysis: Why the Last Staffing Initiative Faded
- NUR 631 Module 5 Milestone Two: Business Case: Float Pool and Virtual Nursing
- NUR 631 Module 6 Stakeholder Analysis: Who Gains, Who Loses and Who Decides
- NUR 631 Module 7 Negotiation Memo: Negotiating First-Year Funding With the CFO
- NUR 631 Module 8 Balanced Scorecard: Twelve Measures for the Staffing Strategy
- NUR 631 Module 9 Final Project: The Full Nursing Staffing Strategic Plan
- NUR 550 Module 3 Milestone One: A Documented, Repeatable Literature Search on Delirium Prevention
- NUR 502 Module 2 Learner Needs Assessment: Assessing parents before gastrostomy teaching
- NUR 650 Module 6 Measures Paper: Measuring Care Coordination With Structure, Process and Outcome
- NUR 545 Module 8 Older Adult Assessment: Assessing an 82-Year-Old Taking Nine Medicines
NUR 631 Module 10 questions, answered
Where can I find a free NUR 631 Module 10 Journal sample?
A full closing entry is published here: a future nurse leader reflects on learning to build a defensible business case and to take finance, the union and bedside nurses seriously.
What should a nurse executive leadership reflection include?
An honest starting point, specific assignments that challenged it, the lesson in each case linked to a source and observable habits you will use in a leadership role.
Why do nurse leaders need financial skills?
Because resource requests are judged on costs, savings and risk. Leaders who show the arithmetic and admit uncertainty are more likely to win and keep the trust of finance officers.
What is interest-based negotiation?
An approach that looks past each side's stated demand to the needs behind it, finds where those needs overlap and builds options and criteria both sides can accept.
How long is the NUR 631 closing journal?
Prompts usually call for roughly 400 to 700 words, but your section's instructions set the exact length and any source requirements.