NUR 645 Module 2 Needs Assessment Paper Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 645 Module 2 Needs Assessment Paper sample shows what a program should learn before it changes a single course. It is written for SNHU NUR 645 (NUR-645), the MSN nurse educator course on curriculum design. The composite school is a baccalaureate program where faculty sense that graduates struggle with population health and clinical judgment, but no one has gathered systematic evidence. The paper follows the first two steps of Kern's six-step approach, a general and a targeted needs assessment. It brings together graduate and employer surveys, licensure trends, student focus groups and county health data. It then analyzes external and internal frame factors, as described by Keating and DeBoor, from regional demographics to faculty expertise. The Future of Nursing 2020-2030 report frames the population health gap, and the paper ends with prioritized needs that will guide the revision.

CourseNUR 645 Curriculum Design in Nursing
ModuleModule 2
Paper typecurriculum needs assessment paper with frame factor analysis
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedSeptember 2026

Free sample paper for NUR 645 Module 2

1

Before Changing Anything: A Needs Assessment and Frame Factor Analysis for a Baccalaureate Curriculum Revision

[Student Name]

Southern New Hampshire University

NUR 645: Curriculum Design in Nursing

Module Two Needs Assessment Paper

[Instructor Name]

[Date]

What this page is doingThe title's opening phrase states the paper's principle: evidence of need comes before design decisions.
2

Before Changing Anything: A Needs Assessment and Frame Factor Analysis for a Baccalaureate Curriculum Revision

Curriculum revisions often begin with a solution. A faculty member returns from a conference excited about concept-based teaching, or an accreditation visit prompts a rush to rewrite outcomes. Without evidence of what graduates actually need and what the program can realistically deliver, a revision can solve the wrong problem or create new ones. Cedar Valley University School of Nursing, a composite baccalaureate program admitting 80 students a year, is considering a revision. Faculty believe graduates are weak in population health and clinical judgment, but that belief rests on anecdotes. This paper presents a needs assessment conducted before any design decisions. It argues that systematic evidence from multiple stakeholders, combined with an honest analysis of frame factors, should determine what the revision addresses and what it leaves alone.

What this page is doingThe introduction warns against starting with solutions and states that evidence should define the revision's scope.
3

A Framework for the Assessment

Thomas et al. (2016) describe a six-step approach to curriculum development that begins with problem identification and a general needs assessment, which examines the gap between current and ideal performance in the wider field, followed by a targeted needs assessment, which examines the specific learners and learning environment. Only after these steps do goals, strategies, implementation and evaluation follow. The approach was developed for medical education but applies well to nursing because it insists that each later step be justified by what the first two reveal. Keating and DeBoor (2018) add the concept of frame factors: the external and internal conditions, such as community needs, regulation, finances, faculty and facilities, that shape what any curriculum can achieve. Together these frameworks structure this assessment.

What this page is doingThe six-step approach and frame factors are introduced as the structure for the assessment.
4

General Needs: The Wider Field

The general needs assessment asked what the nursing workforce of the next decade will need. The national consensus study on nursing for 2020 to 2030 calls for graduates who can act on the social conditions that drive illness and who see equity as part of their work, and for schools to build community-based learning and teaching on structural causes of poor health into their programs (National Academies of Sciences, Engineering, and Medicine, 2021). The 2021 AACN Essentials, which the program must align with, shift nursing education toward competencies across ten domains, including population health. Regionally, the county served by Cedar Valley has a diabetes prevalence above the state average, a growing population over 65 and two rural hospitals that have closed obstetric units in the past five years. These sources point to population health, chronic disease management and care in community settings as growing needs.

What this page is doingThe general needs assessment draws on national reports, the new Essentials and regional health data.
5

Targeted Needs: Our Graduates and Students

Table 1 summarizes the targeted assessment. The findings partly confirm and partly challenge faculty assumptions. Employers and licensure data support concerns about clinical judgment, particularly recognizing and responding to deterioration. Population health emerged as a gap from graduates and the document review, but students located the problem in the isolation of the community course rather than in a lack of content. The content review revealed something faculty had not expected: substantial repetition, with diabetes taught in five courses, often at the same level, which contributes to the overload students described.

Table 1. Targeted Needs Assessment Sources and Findings

SourceMethodKey finding
Graduates, 1 to 3 years outOnline survey, 94 responses of 21041% felt unprepared to plan care for patients after discharge; 37% for community resources
EmployersStructured interviews with 9 nurse managersGraduates strong in skills; slower to recognize deterioration and to escalate
Licensure resultsFive-year trendFirst-time pass rate fell from 91% to 84%; weakest areas in management of care
Current studentsThree focus groups, 22 studentsCommunity course felt disconnected from other courses; heavy content with little application
Curriculum documentsContent review of 12 coursesDiabetes taught in 5 courses with repetition; population health in 1 course only

Note. Multiple sources were used so that no single perspective, including that of faculty, defines the problem.

What this page is doingThe table summarizes each source, method and finding, and the text notes where findings challenged faculty assumptions.
6

Frame Factors

External frame factors include the regional health profile described above, the state board of nursing requirements for clinical hours, the accreditation expectation to align with the 2021 Essentials, and the clinical placement market, in which three nursing programs compete for limited medical-surgical and obstetric sites. Two clinical partners have offered community and ambulatory placements, which could ease this pressure. Internal frame factors include a mission that emphasizes service to rural communities, a faculty of 18 in which only two have community health expertise, a simulation center that is underused on weekends and a budget with no new faculty lines for two years. Students are older than average, and 40% work more than twenty hours a week, which limits scheduling flexibility.

These factors narrow the options. A revision that requires new faculty positions is not feasible, but one that uses community placements and the simulation center, and that develops current faculty in population health, is. The rural mission supports strengthening population health, which gives the revision an internal justification beyond accreditation.

What this page is doingExternal and internal frame factors are analyzed and used to rule some options out and others in.
7

Prioritized Needs

The assessment identifies four needs in priority order. First, strengthen recognition of and response to patient deterioration across clinical courses, supported by employer, licensure and graduate data. Second, integrate population health across the curriculum rather than confining it to one course, supported by national reports, graduate data and student focus groups. Third, reduce content repetition, beginning with chronic disease topics, to make room for application. Fourth, develop faculty expertise in population health. Needs that were not supported by evidence, such as a proposal to add a separate informatics course, were set aside for future review.

What this page is doingNeeds are ranked with their supporting sources, and an unsupported proposal is explicitly set aside.
8

Limitations

The graduate survey response rate was 45%, and graduates who felt unprepared may have been more or less likely to respond. Employer interviews involved nine managers from three hospitals, all acute care settings, so community employers were not represented. Licensure results reflect many factors beyond the curriculum. These limitations will be addressed by adding interviews with community health employers and by repeating the graduate survey after the revision.

What this page is doingLimitations are stated honestly with plans to address them.
9

Conclusion

The needs assessment confirmed some faculty beliefs, challenged others and uncovered a problem no one had named. Following the first steps of the six-step approach and analyzing frame factors gives Cedar Valley a revision agenda grounded in evidence: strengthen clinical judgment, integrate population health, reduce repetition and develop faculty, all within the program's real constraints.

What this page is doingThe conclusion summarizes how evidence reshaped the agenda and restates the priorities.
10

References

Keating, S. B., & DeBoor, S. S. (Eds.). (2018). Curriculum development and evaluation in nursing education (4th ed.). Springer Publishing.

National Academies of Sciences, Engineering, and Medicine. (2021). The future of nursing 2020-2030: Charting a path to achieve health equity. The National Academies Press. https://doi.org/10.17226/25982

Thomas, P. A., Kern, D. E., Hughes, M. T., & Chen, B. Y. (Eds.). (2016). Curriculum development for medical education: A six-step approach (3rd ed.). Johns Hopkins University Press.

What the NUR 645 Module 2 instructions ask for

Needs assessment papers in NUR 645 usually ask you to gather and analyze evidence about the need for a new or revised curriculum or program before proposing any design. Expect to identify stakeholders, choose data sources and methods, analyze internal and external frame factors and state the needs your curriculum should address. Plan on five to seven pages in APA 7. Use more than one source so no single perspective defines the problem, report findings with numbers where you have them, note where evidence challenged your assumptions, rank the needs by strength of evidence and explain what the frame factors rule in or out. Say which ideas the evidence does not support.

How this NUR 645 Module 2 needs assessment paper example is built

This paper assesses needs at a composite baccalaureate program before a curriculum revision. It follows the first two steps of the Thomas and Kern six-step approach and uses Keating and DeBoor's frame factors. The general assessment draws on the National Academies future of nursing report, the 2021 Essentials and county health data. A table reports findings from graduates, employers, licensure trends, focus groups and a content review, including diabetes taught in five courses. Frame factors, such as no new faculty lines and available community placements, narrow options, and four needs are ranked while an unsupported informatics course is set aside. Limitations, such as a 45% response rate, are stated with fixes.

Where the NUR 645 Module 2 rubric puts the points

Grading of needs assessment papers commonly weighs the choice of stakeholders and data sources, the quality of analysis, the frame factor discussion, the clarity and prioritization of needs, acknowledgment of limitations and APA 7 writing. High-scoring papers draw on several sources, report concrete findings and show where evidence confirmed or contradicted what faculty believed. Graders reward frame factor analyses that actually constrain options rather than listing factors, and needs that are ranked with the evidence behind each. Setting aside an idea because the data did not support it shows the disciplined reasoning reviewers look for in this assignment. Honest limitations also earn credit. Clear ranking helps graders follow the logic.

NUR 645 Module 2 help: the mistakes that cost points

Needs assessments lose points when they rely on faculty opinion alone, when findings are described without data, when frame factors are listed without saying what they allow or prevent or when every proposed change is treated as a need. Another gap is skipping limitations such as low response rates. Use several sources, report numbers, analyze factors for their effect on options, rank needs by evidence and state limits. If your assessment is for a different kind of program, such as an RN to BSN pathway, a nurse residency or a continuing education series, send the setting with your NUR 645 prompt so the paper fits. Name the ideas you set aside.

Get NUR 645 Module 2 written to your instructions

Send the NUR 645 prompt, what you know about your program and the grading criteria. Your paper will draw on several evidence sources, test frame factors for what they permit and rank needs by strength of evidence, within 24 to 48 hours, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 645 papers and related MSN samples

NUR 645 Module 2 questions, answered

Where can I find a free NUR 645 Module 2 Needs Assessment Paper sample?

The full paper is on this page: graduate and employer data, licensure trends, a content review and frame factor analysis before a baccalaureate curriculum revision.

What are frame factors in curriculum development?

The external and internal conditions, such as community needs, regulation, clinical placements, faculty expertise and budget, that shape what a curriculum can achieve.

What is Kern's six-step approach?

Problem identification and general needs assessment, targeted needs assessment, goals and objectives, educational strategies, implementation and evaluation.

What is the difference between a general and a targeted needs assessment?

A general assessment examines needs in the wider field; a targeted assessment examines the specific learners, program and environment.

Which sources should a nursing curriculum needs assessment use?

Several, such as graduate and employer surveys, licensure results, student focus groups, curriculum documents and regional health data.