NUR 654 Module 9 Final Project Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 654 Module 9 Final Project sample assembles the course's foundations into a proposal a college's leaders and faculty could approve. It is written for SNHU NUR 654 (NUR-654), the MSN nurse educator course on curriculum foundations. The composite college plans an online RN to BSN program for associate degree nurses who work full time, most employed by a regional health system that requires a baccalaureate within five years. The proposal sets purposes through Tyler's rationale, drawing on learners, practice leaders and the 2021 AACN Essentials. It then maps external requirements to owners, lays out a ten-course sequence with interprofessional and precepting strands, applies evidence-based online design and describes the partnership and mentor model. Student and faculty support, a CIPP evaluation following Stufflebeam and Zhang and a three-year budget complete a plan that answers why, what, how and how we will know.

CourseNUR 654 Curriculum Foundations in Nursing Education
ModuleModule 9
Paper typecomprehensive nursing program proposal grounded in curriculum foundations
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedOctober 2026

Free sample paper for NUR 654 Module 9

1

Final Project: A Proposal for an Online RN to BSN Program Grounded in Curriculum Foundations

[Student Name]

Southern New Hampshire University

NUR 654: Curriculum Foundations in Nursing Education

Module Nine Final Project

[Instructor Name]

[Date]

What this page is doingThe phrase grounded in curriculum foundations signals that each element of the proposal traces back to history, theory, standards or evidence.
2

Final Project: A Proposal for an Online RN to BSN Program Grounded in Curriculum Foundations

A proposal for a new nursing program must persuade several audiences at once. Faculty want to know that the curriculum is sound, administrators that it is financially viable, accreditors that it meets standards, partners that it serves their nurses and students that it fits their lives. Pine Ridge College, a composite regional college, proposes an online baccalaureate completion program for the region's associate degree nurses, most of whom work full time for Summit Health, a partner that requires newly hired associate degree nurses to earn a baccalaureate within five years. This final project presents the complete proposal. It argues that a program whose purposes are set deliberately, whose external requirements are mapped and owned, whose courses and online design rest on evidence, whose partnership is formal and whose evaluation starts before launch can serve all of these audiences.

What this page is doingThe introduction names the proposal's audiences and states its central claim.
3

Why This Program

Nursing has argued for a century that education should prepare nurses for judgment, leadership and community health, not only bedside tasks, and that such preparation belongs in colleges. That argument now has outcome evidence and employer demand behind it: hospitals increasingly require baccalaureate preparation, and research has linked higher proportions of baccalaureate nurses to better surgical outcomes. In Pine Ridge's region, about 1,100 associate degree nurses work for partner organizations, and a survey of 180 of them found that 72% intended to pursue a baccalaureate within three years if a program fit their work schedules. The nearest existing online programs are at private institutions with tuition roughly double Pine Ridge's.

What this page is doingThe historical argument, employer demand and local survey data establish the need.
4

Purposes and Outcomes

The program's purposes were set using the approach Tyler (1949) proposed: drawing on studies of the learners, the demands of contemporary practice and the views of specialists, then filtering these through the college's philosophy and knowledge of how adults learn. The learner survey showed strong clinical skills but limited experience in population health, research appraisal and leadership. Interviews with nurse leaders emphasized quality improvement, care across settings and precepting. The 2021 Essentials supplied the specialist frame, defining competencies across ten domains for entry-level professional nursing (American Association of Colleges of Nursing, 2021). The resulting eight program outcomes emphasize clinical reasoning across settings, population health, evidence-based practice, quality and safety, interprofessional collaboration, informatics, leadership and professional development, including the ability to coach less experienced nurses. Each outcome is mapped to the Essentials domains and to at least two assessments.

What this page is doingPurposes and outcomes are derived explicitly through Tyler's three sources and mapped to the Essentials.
5

External Requirements

The program will seek national nursing accreditation, which expects curricula to incorporate the Essentials and to track outcome data, and the college will notify its institutional accreditor of the new online degree. Because students may live in neighboring states, the college will meet distance education authorization requirements through its reciprocity membership, publish state-by-state licensure disclosures and maintain an inventory of state rules for practice experiences. Every student must hold an active registered nurse license in the state where practice experiences occur, verified at admission and each term. A requirements table assigns each item to an owner, from the program director to the compliance officer.

What this page is doingAccreditation, institutional notification, distance education and state practice rules are addressed with owners.
6

Curriculum and Online Design

The program comprises ten eight-week courses, completed part time over about twenty months. Evidence appraisal comes first and is used in every later course. Population health, informatics, quality and safety, leadership and a course on caring for patients across transitions follow, with two interprofessional modules shared with the college's social work, public health and health administration programs and a capstone completed at the student's workplace. A precepting strand in the leadership course and a capstone option teach students to coach the clinical reasoning of new graduates, responding to evidence that many new nurses are not yet ready for independent practice.

Online courses follow the Community of Inquiry framework: short videos with low-stakes retrieval questions replace long lectures, stable small groups work on problems from members' own counties and workplaces and instructors provide weekly summaries, active facilitation and live sessions at two times of day. Deadlines, video length and assignments are designed around twelve-hour shifts, and every course meets accessibility standards.

What this page is doingThe curriculum sequence, interprofessional and precepting strands and online design principles are summarized.
7

Partnership, Faculty and Students

A formal partnership with Summit Health, governed by a council that includes a student, provides tuition support, scheduling flexibility and practice mentors drawn from Summit's population health, quality and leadership staff. Faculty coach mentors, and academic and employment records are kept separate. The program will begin with three full-time faculty and four adjunct faculty, all completing online teaching training before launch. Students receive an online orientation, an assigned adviser who contacts them within the first week, access to library and writing support in the evenings and an early warning system that flags missed work for outreach within three days.

What this page is doingThe partnership, faculty preparation and student support are specified.
8

Evaluation and Budget

Evaluation follows the CIPP model, which Stufflebeam and Zhang (2017) describe as serving decisions about context, inputs, process and products. Context evaluation revisits needs before each new cohort; input evaluation includes an external review of the curriculum before launch; process evaluation tracks engagement, course feedback and mentor reports each term; and product evaluation measures completion, graduation, competence, employer ratings and unintended effects. An evaluation committee with a student and a partner representative reviews results each term.

Projected enrollment is 30 students in year one, 45 in year two and 60 in year three. At Pine Ridge's reduced partner tuition, revenue is projected to cover faculty, instructional design, technology and support costs by the second year, with start-up costs of about $240,000 for course development and faculty training in the year before launch. A conservative scenario with 20 students a year delays break-even to the third year.

What this page is doingThe CIPP evaluation and a budget with a conservative scenario close the proposal's practical case.
9

Conclusion

Pine Ridge's online RN to BSN program answers a century-old argument about what nurses need, a present demand from employers and a clear interest among working nurses. Its purposes are set deliberately, its external requirements are mapped and owned, its courses and online design rest on evidence, its partnership is formal and fair to students and its evaluation begins before the first student enrolls. The proposal asks faculty and administrators to approve a program that has answered, in advance, the questions each of them will ask.

What this page is doingThe conclusion restates how the proposal addresses each audience's questions.
10

References

American Association of Colleges of Nursing. (2021). The essentials: Core competencies for professional nursing education. https://www.aacnnursing.org/essentials

Stufflebeam, D. L., & Zhang, G. (2017). The CIPP evaluation model: How to evaluate for improvement and accountability. Guilford Press.

Tyler, R. W. (1949). Basic principles of curriculum and instruction. University of Chicago Press.

What the NUR 654 Module 9 instructions ask for

The NUR 654 Final Project usually asks for a complete proposal for a new or revised nursing program that draws together the course's foundations: history and need, curriculum model, standards and regulation, partnerships, delivery design and evaluation. Plan on about ten to twelve pages in APA 7, often with appendices such as a course sequence or requirements table. Write for the several audiences who must approve the program, show how purposes were derived, map external requirements to owners, describe the curriculum and delivery design with their evidence, formalize partnerships, describe support for faculty and students and include an evaluation plan and a budget with a cautious scenario. Keep each section short enough for busy readers.

How this NUR 654 Module 9 final project example is built

This project proposes an online RN to BSN program for a composite college whose main partner requires associate degree nurses to earn a baccalaureate. It documents need with a survey showing 72% intend to enroll. Purposes are derived through Tyler's three sources and mapped to the 2021 Essentials. External requirements are assigned owners. Ten courses include interprofessional modules and a precepting strand, and online design follows the Community of Inquiry framework. A formal partnership provides mentors, student support includes early warning outreach and a CIPP evaluation following Stufflebeam and Zhang and a budget with a conservative scenario complete the plan. Start-up costs of about $240,000 are stated plainly, with break-even delayed to year three in the cautious scenario.

Where the NUR 654 Module 9 rubric puts the points

NUR 654 final proposals are typically judged on the case for the program, the derivation and quality of outcomes, attention to external requirements, the coherence of curriculum and delivery design, partnership and support structures, evaluation, financial viability and APA 7 writing. Top-band proposals show how each element rests on history, theory, standards or evidence and speak to every audience that must approve them. Graders reward explicit derivation of purposes, requirements tied to owners, designs built around the actual learners and budgets that include a cautious scenario. An evaluation that begins before launch signals a program built to improve itself. Plain statements of start-up costs and risks also earn credit.

NUR 654 Module 9 help: the mistakes that cost points

Program proposals lose points when need is asserted without data, when outcomes appear without explanation of how they were chosen, when regulatory and accreditation requirements are missing or when online delivery is described without evidence. Another gap is a budget with only an optimistic scenario. Document need, derive purposes, map requirements, ground curriculum and delivery in evidence, formalize partnerships, support students and faculty, evaluate from the start and include a cautious budget. If your proposal is for a prelicensure, graduate or residency program, send those details with your NUR 654 prompt so the plan fits. State start-up costs plainly and name who owns each requirement.

Get NUR 654 Module 9 written to your instructions

Send us your NUR 654 final project prompt, your program idea and how it is graded. We will document need, derive purposes, map requirements to owners, ground design in evidence and include evaluation and a cautious budget, within 24 to 48 hours, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 654 papers and related MSN samples

NUR 654 Module 9 questions, answered

Where can I find a free NUR 654 Module 9 Final Project sample?

This page carries the full proposal: an online RN to BSN program with purposes, requirements, courses, online design, partnership, evaluation and budget.

What should a nursing program proposal include?

Evidence of need, how purposes were set, external requirements, curriculum and delivery design, partnerships, support, evaluation and a budget.

How can Tyler's rationale help set program purposes?

By drawing on studies of learners, the demands of practice and specialist views such as the Essentials, then filtering them through philosophy and learning theory.

Why include a conservative budget scenario?

It shows decision makers how the program performs if enrollment falls short, which builds confidence in the plan.

When should evaluation of a new program begin?

Before launch, with context and input evaluation, so problems can be addressed before students enroll.