NUR 656 Module 3 Milestone One Example

Reviewed by Delia Ravenscroft, MSN, RN

This NUR 656 Module 3 Milestone One sample shows how a first prenatal visit can change the course of a pregnancy. It is written for SNHU NUR 656 (NUR-656), the MSN family nurse practitioner course on primary care of women. The composite patient is Ana, 31, at nine weeks in her second pregnancy; her first ended with preeclampsia and delivery at 35 weeks. The milestone organizes her history, examination and standard first-trimester laboratory panel, confirms dating and discusses genetic screening options. It applies the USPSTF recommendation that anyone who could become pregnant take 0.4 to 0.8 mg of folic acid daily and the USPSTF recommendation of low-dose aspirin after 12 weeks for those at high risk of preeclampsia. The ASPRE trial explains why early aspirin reduced preterm preeclampsia. The plan adds baseline kidney and liver tests, home blood pressure checks, vaccines, warning signs and a visit schedule.

CourseNUR 656 Primary Care of Women
ModuleModule 3
Paper typemilestone case on first-trimester prenatal care
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMSN
UpdatedOctober 2026

Free sample paper for NUR 656 Module 3

1

Milestone One: The First Prenatal Visit at Nine Weeks After a Pregnancy Complicated by Preeclampsia

[Student Name]

Southern New Hampshire University

NUR 656: Primary Care of Women

Module Three Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe title names the timing and the prior complication, the two facts that shape every decision in the visit.
2

Milestone One: The First Prenatal Visit at Nine Weeks After a Pregnancy Complicated by Preeclampsia

The first prenatal visit sets the course of a pregnancy. It confirms dating, identifies risks, starts preventive measures and establishes a relationship with the patient. For a woman whose previous pregnancy was complicated by preeclampsia, the visit carries particular weight, because an effective preventive measure, low-dose aspirin, works best when started early in pregnancy. Ana is a 31-year-old seen at a composite community health center at nine weeks of gestation in her second pregnancy. This milestone documents her first prenatal visit and explains the reasoning behind each element. It argues that a systematic first visit that identifies preeclampsia risk, applies current preventive recommendations and prepares the patient to recognize warning signs can reduce the chance that her first pregnancy's complication repeats.

What this page is doingThe introduction explains the purposes of the first visit and why prior preeclampsia raises its stakes.
3

History

Ana's last menstrual period began nine weeks and two days ago; her cycles are regular. A home pregnancy test was positive two weeks ago. She has mild nausea without vomiting and no bleeding or pain. Her first pregnancy, three years ago, was complicated by preeclampsia diagnosed at 34 weeks with blood pressures of 150/100 and protein in the urine; labor was induced at 35 weeks, and her son spent five days in the neonatal unit. Her blood pressure returned to normal within six weeks after birth, and she has had normal readings at annual visits since. She has no diabetes, kidney disease or autoimmune disease. She does not smoke, drink alcohol or use drugs. She has been taking a multivitamin with folic acid since learning she was pregnant. Her mother had high blood pressure in pregnancy. She works as a school bus driver and lives with her husband and son. Screening for depression, intimate partner violence and food insecurity was negative.

What this page is doingThe history documents dating, the prior preeclampsia in detail, other risk factors and psychosocial screening.
4

Examination and Laboratory Tests

Blood pressure 124/78 on two readings, heart rate 82, body mass index 31. The general examination is normal. On bedside ultrasound one embryo was seen inside the uterus with a visible heartbeat, and its measured length matched nine weeks and one day, so her dates stand.

The standard first-trimester panel was ordered: complete blood count, blood type, Rh factor and antibody screen, rubella immunity, syphilis, HIV, hepatitis B surface antigen and hepatitis C antibody, urinalysis and urine culture. Because of her history, baseline tests were added to allow comparison if preeclampsia develops later: serum creatinine, liver enzymes, platelet count and a urine protein-to-creatinine ratio. Because her body mass index is above 30 and she has a family history of hypertensive disorders, early screening for diabetes was also ordered. Her cervical screening was up to date. Options for aneuploidy screening, including cell-free DNA testing, were explained, and she chose cell-free DNA at ten weeks.

What this page is doingExamination, dating ultrasound, the standard panel and history-driven additions are documented with reasons.
5

Assessment

1. Intrauterine pregnancy at nine weeks by dates and ultrasound, G2P0101.

2. High risk for preeclampsia. The USPSTF recommends low-dose aspirin, 81 mg daily, after 12 weeks of gestation for pregnant people at high risk of preeclampsia, and identifies a history of preeclampsia as a high-risk factor; the Task Force also lists moderate risk factors, such as obesity and a family history of preeclampsia, and recommends aspirin when more than one is present (Davidson et al., 2021). Ana has one high-risk factor and two moderate factors. The evidence for early treatment is strong. In the ASPRE trial, Rolnik et al. (2017) randomized women identified as high risk by first-trimester screening to aspirin 150 mg nightly or placebo from 11 to 14 weeks until 36 weeks, and preterm preeclampsia occurred in 1.6% of the aspirin group compared with 4.3% of the placebo group.

3. Folic acid supplementation. The USPSTF recommends that all persons who plan to or could become pregnant take a daily supplement containing 0.4 to 0.8 mg of folic acid to prevent neural tube defects (Bibbins-Domingo et al., 2017). Ana's multivitamin contains 0.8 mg.

What this page is doingThe assessment applies both USPSTF recommendations, counts risk factors and explains the trial evidence for early aspirin.
6

Plan

Aspirin: begin 81 mg daily at 12 weeks, taken at bedtime, and continue until delivery, with the obstetric consultant's agreement. Ana was told that aspirin at this dose is considered safe in pregnancy and reduces, but does not eliminate, the chance of preeclampsia. Blood pressure: she will check her blood pressure at home twice a week with a validated cuff provided by the clinic and report any reading of 140/90 or higher. Continue her multivitamin with folic acid. Vaccines: influenza vaccine given today; Tdap planned between 27 and 36 weeks; other vaccines reviewed according to season and current recommendations.

Consultation: because of her prior preterm preeclampsia, a consultation with maternal-fetal medicine will be arranged to agree on a plan for growth ultrasounds and the timing of delivery. Follow-up visits every four weeks until 28 weeks, then more often, with blood pressure and urine protein checked at each visit.

Social supports matter to this plan. Ana drives a school bus and worried that frequent visits would cost her shifts; her visits were scheduled for early afternoon, between routes, and she was given a work note explaining the medical need for regular checks. Her husband will attend the maternal-fetal medicine consultation so that both understand the plan and the warning signs.

What this page is doingThe plan specifies aspirin timing and dose, home monitoring, vaccines, consultation and visit frequency.
7

Education

Ana was taught the warning signs of preeclampsia that require an immediate call or emergency visit: severe headache that does not improve, vision changes, aching under her right ribs, a face or hands that puff up quickly, shortness of breath and a home blood pressure of 160/110 or higher. She was told that preeclampsia can develop after delivery as well, up to six weeks postpartum. She was also given guidance on nausea, safe foods and physical activity, and on bleeding or pain that should prompt a call. She repeated the warning signs back correctly and received them in writing.

What this page is doingEducation covers preeclampsia warning signs, including postpartum risk, with teach-back and written materials.
8

Conclusion

Ana's first prenatal visit confirmed a healthy early pregnancy and identified her as high risk for preeclampsia. Applying the USPSTF recommendations on aspirin and folic acid, grounding the aspirin decision in the ASPRE trial, adding baseline tests, arranging home blood pressure monitoring and consultation and teaching warning signs gives her the best chance of a different outcome this time.

What this page is doingThe conclusion connects each preventive step to the goal of avoiding a repeat of preeclampsia.
9

References

Bibbins-Domingo, K., Grossman, D. C., Curry, S. J., Davidson, K. W., Epling, J. W., GarcĂ­a, F. A. R., Kemper, A. R., Krist, A. H., Kurth, A. E., Landefeld, C. S., Mangione, C. M., Phillips, W. R., Phipps, M. G., Pignone, M. P., Silverstein, M., & Tseng, C. W. (2017). Folic acid supplementation for the prevention of neural tube defects: US Preventive Services Task Force recommendation statement. JAMA, 317(2), 183-189. https://doi.org/10.1001/jama.2016.19438

Davidson, K. W., Barry, M. J., Mangione, C. M., Cabana, M., Caughey, A. B., Davis, E. M., Donahue, K. E., Doubeni, C. A., Kubik, M., Li, L., Ogedegbe, G., Pbert, L., Silverstein, M., Simon, M. A., Stevermer, J., Tseng, C. W., & Wong, J. B. (2021). Aspirin use to prevent preeclampsia and related morbidity and mortality: US Preventive Services Task Force recommendation statement. JAMA, 326(12), 1186-1191. https://doi.org/10.1001/jama.2021.14781

Rolnik, D. L., Wright, D., Poon, L. C., O'Gorman, N., Syngelaki, A., de Paco Matallana, C., Akolekar, R., Cicero, S., Janga, D., Singh, M., Molina, F. S., Persico, N., Jani, J. C., Plasencia, W., Papaioannou, G., Tenenbaum-Gavish, K., Meiri, H., Gizurarson, S., Maclagan, K., & Nicolaides, K. H. (2017). Aspirin versus placebo in pregnancies at high risk for preterm preeclampsia. New England Journal of Medicine, 377(7), 613-622. https://doi.org/10.1056/NEJMoa1704559

What the NUR 656 Module 3 instructions ask for

Milestone One in NUR 656 often asks you to document a prenatal or preconception visit, applying current guidelines to a patient's risks. Expect to present the history, examination and laboratory plan, an assessment with risk stratification and a plan with education. Plan on five to seven pages in APA 7 in your program's format. Confirm dating, list the standard first-trimester tests and any additions justified by the history, count risk factors against the guideline's categories, give the exact dose and start time for preventive medications, arrange consultation when the history calls for it and teach warning signs with a check that the patient understood them. Account for work and family constraints when scheduling. Be exact about timing.

How this NUR 656 Module 3 milestone one example is built

This milestone documents a composite 31-year-old at nine weeks whose first pregnancy ended in preeclampsia at 35 weeks. Dating is confirmed by ultrasound, the standard panel is ordered and baseline kidney, liver and platelet tests are added. The assessment applies the Davidson USPSTF recommendation, identifying one high and two moderate risk factors, explains the Rolnik ASPRE trial showing preterm preeclampsia fell from 4.3% to 1.6% with early aspirin and confirms folic acid under the Bibbins-Domingo recommendation. The plan starts 81 mg aspirin at 12 weeks, adds home blood pressure checks, vaccines, consultation and warning signs taught with teach-back. Visits are scheduled around her bus routes, and her husband joins the consultation.

Where the NUR 656 Module 3 rubric puts the points

Grading of prenatal milestones commonly weighs the completeness of history and examination, accuracy of dating, appropriateness of laboratory testing, correct risk stratification, evidence-based preventive measures, education and APA 7 writing. Top-band papers justify additions to routine testing with the patient's specific history and apply guideline risk categories precisely. Graders reward exact dosing and timing for aspirin and folic acid, trial evidence that explains why timing matters and education that includes postpartum warning signs. Arranging appropriate consultation and a visit schedule shows the coordinated care expected of family nurse practitioners. Attention to work and family constraints strengthens the plan and is often noted by graders. Correct doses are essential.

NUR 656 Module 3 help: the mistakes that cost points

Prenatal notes lose points when dating is not confirmed, when standard tests are missing, when preeclampsia risk is not stratified or when aspirin is omitted or started at the wrong time. Another gap is education that leaves out warning signs or postpartum risk. Confirm dating, order the full panel with justified additions, count risk factors, dose preventive medications precisely, arrange consultation and teach warning signs with teach-back. If your case involves gestational diabetes screening, a patient with chronic hypertension or a preconception visit, send it with your NUR 656 template so the plan follows the right guidance. Schedule around the patient's work. Include postpartum warning signs.

Get NUR 656 Module 3 written to your instructions

Send us the NUR 656 milestone case, your template and how it is graded. We will confirm dating, justify every test, stratify risk against the guideline, dose preventive medications precisely and teach warning signs, within 24 to 48 hours, free the first time. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More NUR 656 papers and related MSN samples

NUR 656 Module 3 questions, answered

Where can I find a free NUR 656 Module 3 Milestone One sample?

This page carries the full case: a first prenatal visit at nine weeks after prior preeclampsia, first-trimester labs, folic acid and low-dose aspirin.

Who should take low-dose aspirin in pregnancy?

The USPSTF recommends 81 mg daily after 12 weeks for those with one high-risk factor, such as prior preeclampsia, or more than one moderate factor.

What did the ASPRE trial show?

Aspirin started at 11 to 14 weeks in high-risk women reduced preterm preeclampsia from 4.3% with placebo to 1.6%.

How much folic acid is recommended before and during early pregnancy?

The USPSTF recommends a daily supplement with 0.4 to 0.8 mg of folic acid for anyone who plans to or could become pregnant.

What are the warning signs of preeclampsia?

Severe headache, vision changes, pain under the right ribs, sudden swelling, shortness of breath and very high blood pressure, including after delivery.