| Course | OL 600 Strategic Human Resource Management |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone designing a performance management system and a total rewards strategy, including compliance and communication of HR self-service technology |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 600 Module 5
Managing and Rewarding Performance at Carraway Technical Fabrics
[Student Name]
Southern New Hampshire University
OL 600: Strategic Human Resource Management
Milestone Two: Performance Management and Total Rewards
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Managing and Rewarding Performance at Carraway Technical Fabrics
Introduction
Milestone One set Carraway's goals for the next three years: on-time delivery from 88 to 95 percent, first-pass quality on coated fabrics from 91 to 96 percent, first-year turnover among production hires from 41 to 22 percent and 14 technicians ready to replace retirees. This milestone designs how employees will be reviewed and rewarded in support of those goals, plans communication of a new HR self-service portal and evaluates federal compliance.
The Current System
Today every Carraway employee receives an annual review in December on a one-page form with five ratings from "unsatisfactory" to "outstanding." Supervisors complete about 30 forms each in two weeks, most employees receive the same middle rating and raises are 3 percent across the board regardless of the rating. Employees describe the review as a formality; supervisors describe it as paperwork.
Performance Management Design
Pulakos and O'Leary (2011) argued that performance management has failed largely because organizations keep redesigning formal forms and procedures while neglecting the everyday behaviors that matter: setting clear expectations, agreeing on short-term objectives and giving ongoing guidance. DeNisi and Murphy (2017), surveying a hundred years of studies published mostly in one leading journal, traced how attention moved from rating scales and rater error toward the purpose of ratings, employees' reactions and the context in which appraisal happens. Carraway's new system shifts weight from the form to the conversation. Supervisors will hold a ten-minute monthly check-in with each employee, set two or three quarterly goals tied to the mill's metrics and complete a short year-end summary that draws on the year's check-ins rather than on memory.
Appraisal methods by role group
| Role group | Appraisal method | Why it fits |
|---|---|---|
| Production operators | Skills-based checklist certified on the floor, plus attendance and safety record | Work is defined by observable skills that predict quality |
| Technician track | Certification steps verified by a senior technician | Progress is measured in mastered skills |
| Engineers | Quarterly goals tied to quality and delivery metrics | Contributions show up in project results |
| Supervisors | Behavior-based review from their managers and a short upward survey | Their impact runs through how they lead others |
Total Rewards Strategy
Base pay will be set against the county market. Milestone One raised starting operator pay by $1.50 an hour; this milestone adds a structured range with three steps tied to skills certification, so an operator can earn about $3 an hour more within two years. Technician-track participants receive a step increase at each certification. Gerhart and Fang (2015), reviewing evidence on pay for performance, concluded that claims that such pay undermines intrinsic motivation and creativity at work are not well supported, and that the effects depend on design. The design question is what to reward. Individual piece rates would encourage speed over quality on coated fabrics, so Carraway will instead pay a quarterly plant-wide quality bonus, capped at 4 percent of each employee's base earnings, in any quarter when the quality and delivery targets are both met. Benefits will be redesigned for the second shift's younger workforce: a lower-premium health plan option, tuition support, $1.25 more per hour on the second shift and a modest retirement match that vests in two years instead of five.
Communicating HR Self-Service
Carraway will launch an online HR portal where employees can see pay, enroll in benefits, request time off and check training records themselves. Strohmeier (2007), reviewing research on electronic HRM, emphasized that outcomes depend on users and implementation, not just on the technology. Many Carraway production employees do not use computers at work, so the rollout will include kiosks in both break rooms, phone access, sessions on each shift, printed guides in English and Spanish and two HR staff available during shift changes for the first month. Production supervisors get a walkthrough a week ahead of everyone else, and department managers see how much paperwork the portal removes from their teams.
Federal Compliance
Under the Fair Labor Standards Act, both the shift differential and the quality bonus count as part of a nonexempt employee's pay when the overtime premium is figured, so payroll must fold them into the hourly base used for time-and-a-half. The Equal Pay Act and Title VII require that pay ranges and step increases be applied consistently regardless of sex and race, so HR will audit pay by job, step, sex and race each year. Skills certifications must be based on job-related criteria and open to all eligible employees. The retirement match must comply with ERISA and the plan's documents, which benefits counsel will update before the change takes effect. Performance documentation from check-ins will be kept consistently, since inconsistent records weaken an employer's position in any later dispute.
Supervisors as the Key to the System
None of this works unless supervisors can do it. Most of Carraway's 21 production supervisors were promoted from operator roles and have never been trained to set goals or give feedback. Each will complete a two-day workshop on running a short check-in, setting a measurable quarterly goal and giving specific feedback on skills, followed by monthly practice sessions in which supervisors role-play difficult conversations, such as an operator whose scrap rate is rising. Supervisors will themselves be reviewed partly on whether their check-ins happen and on how their teams rate the usefulness of feedback, so the new system is part of their job rather than an extra task. The plant manager will review completion rates each month at the operations meeting, which signals that the system matters to leadership.
Why a Plant-Wide Bonus and Not Individual Incentives
An individual incentive was considered and rejected. Coated-fabric quality depends on handoffs between weaving, coating, curing and inspection, so individual output measures would reward each station for pushing fabric forward rather than for getting it right. A plant-wide bonus tied to quality and delivery encourages operators to stop a line when they see a defect and technicians to help other departments. The bonus is capped at 4 percent so it remains meaningful without becoming a substitute for competitive base pay, which research and local conditions both suggest is what attracts operators in the first place. The bonus formula, quarterly results and payout will be posted in each department so that employees can follow the numbers themselves.
Measures
The system will be judged by the same metrics set in Milestone One, plus three of its own: the share of monthly check-ins completed, employees' ratings of the usefulness of feedback on a short annual survey and the share of operators advancing a skill step each year.
References
DeNisi, A. S., & Murphy, K. R. (2017). Performance appraisal and performance management: 100 years of progress? Journal of Applied Psychology, 102(3), 421-433. https://doi.org/10.1037/apl0000085
Gerhart, B., & Fang, M. (2015). Pay, intrinsic motivation, extrinsic motivation, performance, and creativity in the workplace: Revisiting long-held beliefs. Annual Review of Organizational Psychology and Organizational Behavior, 2, 489-521. https://doi.org/10.1146/annurev-orgpsych-032414-111418
Pulakos, E. D., & O'Leary, R. S. (2011). Why is performance management broken? Industrial and Organizational Psychology, 4(2), 146-164. https://doi.org/10.1111/j.1754-9434.2011.01315.x
Strohmeier, S. (2007). Research in e-HRM: Review and implications. Human Resource Management Review, 17(1), 19-37. https://doi.org/10.1016/j.hrmr.2006.11.002
What the OL 600 Module 5 instructions ask for
Milestone Two of the OL 600 final project asks students to design a performance management system and a total rewards program for the case organization. Expect to explain how performance management will align with the organization's mission and goals, select appraisal methods and justify them, evaluate federal compliance, and develop compensation and benefits strategies that attract and keep the people the plan requires. Many versions also ask how the organization will communicate a new HR self-service technology to its stakeholders. Strong submissions build directly on Milestone One's workforce plan, treat different employee groups differently where that makes sense and back choices with research on appraisal, pay and motivation rather than with general claims.
How this OL 600 Module 5 milestone two example is built
The sample designs performance management and rewards for Carraway Technical Fabrics, an imagined North Carolina mill expanding with a second coated-fabric line. It replaces a December rating form with monthly check-ins and quarterly goals, uses a skills-based appraisal for production staff, results-based goals for engineers and a behavior-based review for supervisors, and trains supervisors in everyday feedback, drawing on Pulakos and O'Leary's critique of formal systems and DeNisi and Murphy's review of appraisal research. Total rewards set base pay against the county market, add skill-based pay steps for the technician track and a plant-wide quality bonus, informed by Gerhart and Fang's review of pay and motivation, and redesign benefits for a younger second shift. It plans a self-service portal rollout and reviews compliance with the FLSA, the Equal Pay Act, Title VII and ERISA.
Where the OL 600 Module 5 rubric puts the points
Graders usually weigh OL 600 Milestone Two on alignment of performance management with the organization's mission and goals, justified choice of appraisal methods, a total rewards strategy covering pay, incentives and benefits, attention to federal compliance, a communication plan for HR technology, continuity with Milestone One and research support. The strongest OL 600 second milestones show how each reward or review practice moves a metric from the workforce plan. Marks drop for a single appraisal form for every role, for incentives that reward the wrong behavior, for benefits copied from a template, for compliance treated as a list of acronyms or for a technology rollout with no plan for employees who rarely use a computer at work.
OL 600 Module 5 help: the mistakes that cost points
Start from the goals and metrics in Milestone One and ask what behavior each requires from each group of employees. Choose appraisal methods that fit the work: skills checklists for production, goals for professionals and behavior-based reviews for supervisors are common combinations. Build feedback into everyday management rather than relying on an annual form. For total rewards, compare base pay with the local market, decide what the incentive should reward and test it for unintended effects, and match benefits to who the workforce actually is. Check each piece against federal law, including wage and hour rules, equal pay and benefits regulation. For any new HR technology, plan how each stakeholder group will learn about it and get help using it.
Get OL 600 Module 5 written to your instructions
Send the OL 600 Milestone Two guidelines, your graded Milestone One and the case materials. We design the performance management system and appraisal methods, build the total rewards strategy across pay, incentives and benefits, plan stakeholder communication for HR self-service technology and review federal compliance, with research behind each choice. Your first OL 600 Milestone Two is free, and most drafts arrive within forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 600 papers and related MS Organizational Leadership samples
- OL 600 Module 1 Discussion: HR's Strategic Role
- OL 600 Module 2 External Environment Assignment: External Environment and Labor Market Analysis
- OL 600 Module 3 Milestone One: Strategic and Workforce Plan
- OL 600 Module 4 Discussion: Fair Hiring and Employment Law
- OL 600 Module 6 Discussion: Training and Development
- OL 600 Module 7 Milestone Three: Engagement, Safety and Employee Relations
- OL 600 Module 8 Discussion: HR Analytics and Technology
- OL 600 Module 9 Final Project: Strategic HR Plan
- OL 600 Module 10 Discussion: HR Leadership Competencies and Ethics
- ACC 691 Module 7 Discussion: Why the Auditors Missed It
- BMB 670 Module 8 Stakeholder Analysis Assignment: Neighbors, the Land and the Township
- MGT 630 Module 9 Discussion: Do Safe Sites Build Better Buildings
- BMB 515 Module 4 Discussion: Giving Music Away on Purpose
OL 600 Module 5 questions, answered
Where can I find a free OL 600 Module 5 Milestone Two sample?
The complete OL 600 Milestone Two is on this page: performance management, total rewards and an HR self-service plan for a textile mill.
Why do performance management systems fail?
Research argues many fail because they focus on formal annual forms rather than the everyday manager-employee communication, goal setting and guidance that actually shape performance.
What is total rewards?
The full set of what employees receive for their work: base pay, incentives, benefits, recognition, development and work conditions, managed together as one strategy.
Does pay for performance reduce intrinsic motivation?
A review of workplace evidence concluded that claims of harm are not well supported and that well-designed pay for performance can support motivation and performance.
What is skill-based pay?
A pay system in which employees earn higher rates as they learn and are certified in additional skills, which suits technical roles where breadth of skill matters.