| Course | OL 600 Strategic Human Resource Management |
|---|---|
| Module | Module 6 |
| Paper type | graduate discussion post on designing training that transfers to the job, applied to a specific skill gap |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 600 Module 6
Module Six Discussion
Shadow Earl Until You Get It
Sixteen of Carraway's 42 loom and coating technicians can retire within five years. Today a new technician learns by following a veteran, often our senior technician Earl, until the new person "gets it," which takes anywhere from one to three years. Earl is an excellent technician and a patient teacher, but much of what he knows has never been written down.
Arthur et al. (2003), pooling hundreds of training evaluations, reported effects of about six tenths of a standard deviation for what trainees learned, how they behaved afterward and the results their units saw, and that effectiveness depended on the training method and the kind of skill being taught. Blume et al. (2010), reviewing 89 studies, found that skills carried over to work more often when trainees were able, dependable and eager and when their workplace backed them up, and that most predictors mattered more for open skills that require judgment than for closed, procedural ones. Salas et al. (2012), summarizing the science of training, stressed that training works but only when it is designed with a needs analysis, practice, feedback and attention to what happens before and after the program.
Troubleshooting a loom is an open skill: no two faults are quite the same. Shadowing gives exposure but not deliberate practice, because trainees mostly watch and the faults they see are whatever happens to occur. A trainee might go months without seeing a broken warp stop motion and then face one alone on a Saturday night. Earl also explains his reasoning unevenly; when the line is down, he fixes first and teaches later, if at all.
A twelve-month program with four parts: short classroom modules on loom mechanics at the community college; weekly practice on an idle loom where Earl introduces faults for trainees to diagnose; a checklist of the cues Earl uses, built by recording his reasoning; and supervisors who assign trainees real repairs soon after each module and review them afterward. We would measure diagnosis time and first-time-fix rates, not hours attended.
In your organization, what happened after a training program ended that decided whether people actually used what they learned?
References
Arthur, W., Jr., Bennett, W., Jr., Edens, P. S., & Bell, S. T. (2003). Effectiveness of training in organizations: A meta-analysis of design and evaluation features. Journal of Applied Psychology, 88(2), 234-245. https://doi.org/10.1037/0021-9010.88.2.234
Blume, B. D., Ford, J. K., Baldwin, T. T., & Huang, J. L. (2010). Transfer of training: A meta-analytic review. Journal of Management, 36(4), 1065-1105. https://doi.org/10.1177/0149206309352880
Salas, E., Tannenbaum, S. I., Kraiger, K., & Smith-Jentsch, K. A. (2012). The science of training and development in organizations: What matters in practice. Psychological Science in the Public Interest, 13(2), 74-101. https://doi.org/10.1177/1529100612436661
What the OL 600 Module 6 instructions ask for
The sixth OL 600 discussion turns to training and development as a strategic HR tool. Most prompts ask students to identify a skill gap in an organization and propose how to close it, using research on how adults learn and on what makes training effective. Graduate posts should move beyond "offer more training" to the design questions that research addresses: what method fits the skill, how practice and feedback are built in and what happens back on the job to help or block the use of new skills. Linking the training to a business need, such as retirements or a new product, strengthens the post. Replies should ask classmates what happened after training ended in their examples, since that is where most programs succeed or fail.
How this OL 600 Module 6 discussion example is built
The sample looks at Carraway Technical Fabrics, an imagined mill in Alamance County, North Carolina, where 16 of 42 loom and coating technicians can retire within five years and new technicians currently learn by shadowing a veteran. The post draws on a pooled study by Arthur's team showing sizable training gains that varied with method and skill, Blume and colleagues' review of 89 studies of what predicts transfer to the job and Salas and colleagues' summary of what the science says about designing training. It proposes short classroom modules on loom mechanics, structured practice on an idle loom with deliberately introduced faults, a checklist capturing veteran technicians' judgments and supervisor follow-up on the floor, then asks classmates what made training stick where they work.
Where the OL 600 Module 6 rubric puts the points
In the sixth OL 600 discussion, credit generally reflects a clearly defined skill gap tied to a business need, accurate use of research on training effectiveness and transfer, a proposal that addresses design, practice and the work environment, attention to measurement and replies that probe what happened after training. The best OL 600 posts treat the job environment as part of the training design. Posts lose credit for proposing a single course or video, for ignoring practice and feedback, for describing research without stating findings, for assuming completion equals learning or for replies that compliment without asking about transfer. Graders also notice posts that leave out how the training's results would be measured.
OL 600 Module 6 help: the mistakes that cost points
Define the skill gap precisely: which tasks, which people and why it matters now. Ask how the skill is learned today and what goes wrong. Use research to choose methods; skills involving judgment usually need practice with feedback, not just instruction. Build in what happens after training: supervisor support, chances to use the skill soon and follow-up. Capture expert knowledge explicitly if experts are leaving. Decide how you will measure learning and on-the-job use, not just attendance. Keep the proposal realistic for time and cost. Ask OL 600 classmates what happened after a training program ended in their organizations, and in replies ask what supervisors did to help or hinder.
Get OL 600 Module 6 written to your instructions
Paste the OL 600 Module 6 prompt and name the skill or role your organization needs to train. Our writers bring research on training design and transfer to bear on that skill, proposes a program with practice and support built in and closes with a question for OL 600 peers about what made training work for them. Your first post is free and returned within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 600 papers and related MS Organizational Leadership samples
- OL 600 Module 1 Discussion: HR's Strategic Role
- OL 600 Module 2 External Environment Assignment: External Environment and Labor Market Analysis
- OL 600 Module 3 Milestone One: Strategic and Workforce Plan
- OL 600 Module 4 Discussion: Fair Hiring and Employment Law
- OL 600 Module 5 Milestone Two: Performance Management and Total Rewards
- OL 600 Module 7 Milestone Three: Engagement, Safety and Employee Relations
- OL 600 Module 8 Discussion: HR Analytics and Technology
- OL 600 Module 9 Final Project: Strategic HR Plan
- OL 600 Module 10 Discussion: HR Leadership Competencies and Ethics
- ACC 550 Module 1 Discussion: Cost Information After an Export Market Shrinks
- ACC 640 Module 9 Milestone Three: Completing the Audit
- INT 640 Module 2 Market Opportunity Assessment: Ontario, Britain or Australia
- MKT 668 Module 2 Service Quality Gaps Assignment: Service Quality Gaps Analysis
OL 600 Module 6 questions, answered
Where can I find a free OL 600 Module 6 Discussion sample?
The complete OL 600 Module 6 post is here: how a textile mill should train operators to replace retiring loom technicians so the skills transfer.
Does workplace training work?
Generally yes. Pooled studies show sizable gains in what trainees know, what they do at work and unit results, though the size depends on method and on the skill taught.
What is transfer of training?
The extent to which skills learned in training are used on the job and maintained over time, which depends on the trainee, the training design and the work environment.
Why do trained skills fail to show up on the job?
Often because trainees lack motivation or a chance to practice, and above all because the workplace, especially the supervisor, does not encourage using what was learned.
How do you capture knowledge from retiring employees?
Pair them with successors, record their judgments in checklists and troubleshooting guides and have them coach practice sessions before they leave.