OL 610 Module 7 Milestone Three Example

Reviewed by Portia Lambrick, MBA

This OL 610 Module 7 Milestone Three sample designs a grievance and arbitration system and the structures for a working labor-management relationship. SNHU OL 610 (OL-610) places Milestone Three in Module 7, the last building block of the MS Organizational Leadership labor relations strategy. The employer is Brandywine Pupil Transport, a composite Pennsylvania school bus contractor that has just signed a first contract with its Exton drivers' union. The paper designs a grievance procedure with time limits and arbitration, protections against retaliation, a joint committee with decision rights and voice for its nonunion depots, drawing on research on grievance outcomes, nonunion procedures and high-involvement work.

CourseOL 610 Employee and Labor Relations
ModuleModule 7
Paper typegraduate milestone designing a grievance and arbitration procedure and structures for an ongoing labor-management relationship
LengthAbout 1,100 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 610 Module 7

1

Settling Disputes and Working Together: A Grievance and Labor-Management System for Brandywine

[Student Name]

Southern New Hampshire University

OL 610: Employee and Labor Relations

Milestone Three: Grievance and Labor-Management System

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe contract language, committees and depots in this OL 610 milestone are invented.
2

Settling Disputes and Working Together: A Grievance and Labor-Management System for Brandywine

Introduction

Milestone One found that Exton drivers had no independent way to raise concerns, and Milestone Two planned a contract to address the causes of the organizing drive. The contract is now signed. This milestone designs the systems that will make it work: a grievance procedure with arbitration, protections that make it usable, joint structures for cooperation and voice for drivers at the two depots that remain nonunion.

What this page is doingLinks to earlier milestones.
3

The Grievance Procedure

Grievance procedure, Exton unit

StepWho hears itTime limits
InformalDriver, steward and dispatcher or depot manager talk within five working days of the eventAnswer within three working days
Step 1Written grievance to the depot managerFiled within ten working days; answered within five
Step 2Regional operations director and union business agentAppealed within five working days; meeting within ten; answer within five
Step 3Vice president of human resources and union representativeAppealed within ten working days; answer within ten
ArbitrationNeutral arbitrator from a panel of three agreed in advanceRequested within thirty days; costs shared equally

If management misses a deadline, the grievance moves to the next step automatically; if the union misses one, the grievance is considered settled on management's last answer. Discharges may be filed directly at Step 2, since the depot manager usually made the decision.

What this page is doingSets out steps and time limits.
4

Making the Procedure Usable

Lewin and Peterson (1999), following employees in four unionized organizations over two three-year periods, found that after grievance settlement, filers had lower performance ratings, attendance and promotion rates and higher turnover than nonfilers, and that their supervisors showed similar declines, with no such differences before or during the grievance. They suggested employer retribution as one explanation, though they could not rule out real performance differences. A grievance procedure that punishes its users will go unused, and Exton would be back where it started. The contract therefore prohibits retaliation, and HR will review route assignments, discipline and evaluations for every filer and every supervisor involved for twelve months after each grievance, reporting the results to the joint committee. Supervisors will be trained to treat a grievance as a request for a decision, not a personal accusation. The union, for its part, has agreed to raise problems with a supervisor informally before filing whenever the issue allows, so that the written procedure is reserved for disputes that need it.

What this page is doingProtects filers.
5

The Joint Safety and Scheduling Committee

The contract creates a committee of three drivers chosen by the union and three managers, meeting monthly. It has authority, not only a voice, over three matters: reviewing every late pull-out to decide whether points apply, approving any route change made with less than two weeks' notice and recommending safety equipment purchases up to $25,000 a year. Disagreements on the first two go to the grievance procedure. The committee publishes minutes at the depot. Its first task will be to agree on what counts as a documented cause outside a driver's control, such as a failed pre-trip inspection signed by a mechanic or a routing error logged by the office, so that late pull-out reviews follow a shared standard rather than case-by-case argument. The committee will also review, after six months, whether the two-week notice rule for route changes is workable during the first weeks of each school year, when districts change bell times and enrollment shifts routes.

What this page is doingBuilds cooperation with authority.
6

High-Involvement Work and Unions

Bryson et al. (2005), studying British workplaces, found that high-involvement management practices were associated with higher labor productivity only in unionized workplaces, an effect they thought might reflect concessionary bargaining rather than mutual gains, since they found no link to financial performance. The finding is a caution against assuming that involvement automatically pays, and a reason to give the joint committee real authority over issues drivers care about rather than using it to extract effort.

What this page is doingUses research to shape the committee.
7

Arbitration and Its Costs

Arbitration gives both sides a neutral final decision and keeps disputes off the road; a strike over a single discharge would strand thousands of students. Each case costs about $4,000 to $6,000 in arbitrator fees, shared equally, plus each side's own preparation time. To keep arbitration for disputes that truly need it, the parties agreed to a step in which a mediator from the state's labor mediation service may be called before arbitration at no cost to either side, and to a panel of three arbitrators chosen in advance and assigned in rotation, which avoids weeks of argument over who will hear each case. Both sides will receive a written summary of every award, and the joint committee will review whether recurring awards point to a rule that needs to change rather than to individual cases.

What this page is doingExplains the final step.
8

Training Stewards and Supervisors Together

The procedure will only work if the people at its first steps understand it the same way. Union stewards and depot supervisors will attend a joint half-day session on the contract, the grievance steps and how to settle disputes informally, led by a neutral trainer. Training them together is deliberate: stewards and supervisors who have worked through the same practice cases are more likely to settle the next real one at the depot. The session will be repeated each fall for new stewards and supervisors.

What this page is doingBuilds shared understanding.
9

Voice at the Nonunion Depots

West Chester and Coatesville drivers face the same points system, schedules and pay rules. Colvin (2003), studying dispute resolution in the telecommunications industry, found that employers adopted nonunion procedures in response to both legal pressures and human resource strategy, and that procedures such as peer review were sometimes adopted partly to avoid unionization. Brandywine must be careful here. The NLRA prohibits employer domination of a labor organization, which can include an employee committee that deals with management over wages or working conditions. The company will instead offer individual channels: a peer review panel for discipline appeals, with panelists drawn at random from trained volunteers and deciding individual cases rather than negotiating terms, and monthly open meetings at each depot. The company will extend the revised points rules company-wide on its own initiative and will not suggest that these changes are a reason to avoid a union.

What this page is doingExtends voice within the law.
10

Measures

Progress will show in the share of grievances settled at the informal step or Step 1, average days to resolution, arbitration outcomes, filers' later outcomes compared with nonfilers, driver turnover at all three depots and late pull-outs per month.

What this page is doingLists the signs the system works.
11

Conclusion

Taken together, the grievance steps, the committee and the depot channels give Exton drivers what they lacked, an independent and protected way to be heard, and give the company early warning of problems before they become petitions or arbitration cases.

What this page is doingSummarizes.
12

References

Bryson, A., Forth, J., & Kirby, S. (2005). High-involvement management practices, trade union representation and workplace performance in Britain. Scottish Journal of Political Economy, 52(3), 451-491. https://doi.org/10.1111/j.0036-9292.2005.00352.x

Colvin, A. J. S. (2003). Institutional pressures, human resource strategies, and the rise of nonunion dispute resolution procedures. ILR Review, 56(3), 375-392. https://doi.org/10.1177/001979390305600301

Lewin, D., & Peterson, R. B. (1999). Behavioral outcomes of grievance activity. Industrial Relations, 38(4), 554-576. https://doi.org/10.1111/0019-8676.00144

What the OL 610 Module 7 instructions ask for

Milestone Three of the OL 610 final project typically asks students to design the systems that will govern the employment relationship after bargaining: a grievance procedure with clear steps and time limits, arbitration, and structures for ongoing cooperation, such as joint committees or regular labor-management meetings. Some prompts add a question about employees the union does not represent. Strong submissions draw lessons from the Milestone One assessment about why concerns went unheard, use research on grievance systems and labor-management cooperation, make sure employees can use the procedure without fear of retaliation and stay within labor law, particularly the rules against employer-dominated labor organizations and against interfering with organizing.

How this OL 610 Module 7 milestone three example is built

The sample designs the post-contract system at Brandywine Pupil Transport, an imagined Pennsylvania school bus contractor, after a first contract with the union representing about 150 drivers and aides at its Exton depot. It sets out an informal problem-solving conversation, three grievance steps with time limits and final, binding arbitration with shared costs, and explicit protections against retaliation, a response to Lewin and Peterson's evidence that grievance filers and their supervisors fared worse after settlement. A joint safety and scheduling committee gains authority over route-change notice and late pull-out reviews. For the two nonunion depots, it weighs Colvin's research on why employers adopt peer review and similar procedures and designs voice that does not interfere with organizing, noting Bryson, Forth and Kirby's findings on high-involvement work in unionized and nonunion workplaces.

Where the OL 610 Module 7 rubric puts the points

OL 610 Milestone Three is generally graded on a complete grievance procedure with steps, time limits and arbitration, protections that make the procedure usable, joint structures with clear authority, attention to nonunion employees within the law, use of research on grievances and cooperation, links to the earlier milestones and clear APA writing. The strongest OL 610 third milestones design for the relationship the parties want in five years, not just for the next dispute. Points are lost for procedures without time limits, for ignoring retaliation, for joint committees with no authority, for nonunion programs that could be seen as interfering with organizing or for designs that repeat the single-channel voice that failed before.

OL 610 Module 7 help: the mistakes that cost points

Start with Milestone One: why did concerns go unheard, and what would have caught them early? Design the grievance procedure step by step, with who hears each step, time limits for filing and answering and what happens if a deadline is missed. Decide how arbitration will work and who pays. Add protections: training for supervisors, monitoring of filers' later outcomes and a clear rule against retaliation. Design joint structures with defined authority, not just meetings. For employees outside the unit, research nonunion voice options and check them against the NLRA's limits on employer-dominated organizations. Support each design choice with research. Close with how you will know the system is working.

Get OL 610 Module 7 written to your instructions

Send the OL 610 Milestone Three directions, your earlier milestones with comments and the details of the workplace. We design the grievance and arbitration procedure, the protections that make it usable, joint labor-management structures and voice for any nonunion groups, supported by research and current labor law. The first OL 610 third milestone is free and ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 610 papers and related MS Organizational Leadership samples

OL 610 Module 7 questions, answered

Where can I find a free OL 610 Module 7 Milestone Three sample?

The full OL 610 Milestone Three is on this page: a grievance procedure, arbitration and joint labor-management committee for a school bus contractor and its union.

What are the steps in a typical grievance procedure?

An informal discussion, then written grievances heard at successively higher levels of management, often ending in final and binding arbitration by a neutral.

Do employees suffer for filing grievances?

A study of four unionized organizations found that after settlement, filers and their supervisors had lower performance ratings and promotion rates and higher turnover than comparable nonfilers.

What is a labor-management committee?

A joint group of union and management representatives that addresses shared concerns such as safety, scheduling or quality, ideally with defined authority to act.

Can nonunion employers create employee committees?

Yes, but committees that deal with management over wages or working conditions may be unlawful employer-dominated labor organizations, so their design needs care.