| Course | OL 635 Consulting |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone analyzing diagnostic findings and developing evidence-based, prioritized recommendations for a client |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 635 Module 5
Five Changes for Harlow Parks and Recreation: Analysis and Recommendations
[Student Name]
Southern New Hampshire University
OL 635: Consulting
Milestone Two: Analysis and Recommendations
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Five Changes for Harlow Parks and Recreation: Analysis and Recommendations
Introduction
Milestone One found that Harlow's registrations fell mainly because program schedules no longer fit residents' lives, the registration system drove residents away, lifeguard pay and certification costs left the pools short-staffed and three uncoordinated divisions meant no one owned the whole picture. Changing tastes explained a smaller share. This milestone weighs options for each cause, recommends five changes, costs and ranks them and explains the evidence behind them.
Criteria
Each option was judged on four criteria agreed with the department's working group: expected effect on participation, first-year cost to the general fund, time until results and the department's capacity to carry it out with current staff. Equity was added at the working group's request: whether the option helps residents who currently face the most barriers, including seniors and lower-income families.
Options and Recommendations
For lifeguard shortages, the options were a larger pay raise alone, paying for certification in exchange for a season's commitment, or contracting pool staffing to a private operator. Paying certification plus a $1.75 raise, bringing pay to $15.25, addresses the barrier applicants named most often and narrows the pay gap at a cost of about $96,000 a season; contracting would cost more and remove the department's control over swim lessons.
For camp schedules, the options were extending department camps to 6 p.m. or partnering with an after-school provider. Extending camps with a sliding-scale fee for the extra hours keeps quality and staffing under the department's control, and two peer cities that did so kept camp registrations steady.
For registration, retraining staff on the current setup would leave the core problem, three separately configured catalogs. Rebuilding the system as one citywide catalog, with phone registration staffed during peak weeks and in-person help at every community center for seniors, addresses the 41 percent of online sessions abandoned before payment.
For weekday adult classes, the evidence that evening and weekend classes grew while weekday classes fell points to moving at least half of adult classes to evenings and Saturdays, at little cost.
For coordination, the options were a monthly managers' meeting or a single citywide program manager with authority over the calendar and registration data. The meeting would be cheaper but leaves no one accountable; a program manager position, reclassified from a vacant supervisor position, gives the department an owner for participation citywide.
Costs and Priorities
Recommendations ranked by impact and feasibility
| Priority | Recommendation | First-year cost | Expected effect | Owner |
|---|---|---|---|---|
| 1 | Paid certification and $1.75 lifeguard raise | $96,000 | Pools open seven days; swim lessons restored | Aquatics manager |
| 2 | One citywide registration catalog with phone and in-person help | $58,000 | Fewer abandoned registrations; seniors return | Program manager, IT |
| 3 | Citywide program manager (reclassified position) | $12,000 net | Coordinated calendar, citywide data | Director |
| 4 | Camps to 6 p.m. with sliding-scale fee | $34,000 net of fees | Camp registrations recover | Community centers manager |
| 5 | Adult classes moved to evenings and weekends | $6,000 | Adult class registrations recover | Community centers manager |
The total first-year cost is about $206,000, or 1.4 percent of the department's $14.6 million budget. The department estimates that recovering half of the lost registrations would bring back about $240,000 a year in fees.
How the Working Group Shaped the Options
The working group of five staff tested each option before it reached this paper. Its aquatics member pointed out that paid certification only works if the commitment is enforceable, so the recommendation requires lifeguards who leave before August to repay half the course fee. Its community center member warned that extending camps to 6 p.m. would fail without late-afternoon staff, so the camp option includes hiring from the department's existing part-time pool first. Two options the consultant initially favored were dropped at the group's urging: a new mobile app, which the IT department could not support, and a citywide marketing campaign, which made little sense while residents who wanted to register were already failing to do so.
What Not to Recommend
Some changes the director raised were not recommended. Cutting fees across the board would cost about $180,000 a year and address a barrier only 21 percent of survey respondents named. Closing the smallest community center to fund the other changes would save money but fall hardest on the neighborhood with the lowest car ownership. And waiting for a new registration vendor contract, due in two years, would leave the system's problems in place through two more summers.
Trade-Offs
The pay raise sets a precedent other city departments may cite. The rebuilt registration system will cause short-term disruption during the switch. Extended camps require more staff in the late afternoon, when the department competes with retail for workers. And moving adult classes to evenings may lose some retirees who prefer daytime, which is why senior programs keep their daytime slots.
Evidence Behind the Recommendations
Rousseau (2006) argued that managers too seldom base practice on the best available evidence and urged them to draw on research findings in the way medicine draws on clinical evidence. Briner et al. (2009) clarified that evidence-based management combines several sources, scientific research, organizational data, practitioners' experience and the views of those affected, rather than applying research mechanically. These recommendations draw on all four: the department's registration data, peer cities' experience, staff judgment from the working group and residents' survey answers. Lapsley and Oldfield (2001), studying consultants' work in the UK public sector, described consultants as change agents whose influence depends on how they work with public managers, which is why the working group helped shape every option.
Measuring Whether the Changes Work
Each recommendation comes with an indicator the department already collects or can collect cheaply: lifeguard positions filled by June 1 and pool days open, the share of online registrations completed after starting, camp enrollment by week, adult class enrollment by time slot and citywide registrations reported monthly by the program manager. The working group asked that the indicators be reported to council quarterly, so that the department can show progress in the next budget cycle.
Conclusion
Five specific, costed changes address the causes the diagnosis found, starting with the pools and the registration system, where the evidence is strongest and the effect fastest.
References
Briner, R. B., Denyer, D., & Rousseau, D. M. (2009). Evidence-based management: Concept cleanup time? Academy of Management Perspectives, 23(4), 19-32. https://doi.org/10.5465/amp.2009.45590138
Lapsley, I., & Oldfield, R. (2001). Transforming the public sector: Management consultants as agents of change. European Accounting Review, 10(3), 523-543. https://doi.org/10.1080/713764628
Rousseau, D. M. (2006). Is there such a thing as "evidence-based management"? Academy of Management Review, 31(2), 256-269. https://doi.org/10.5465/amr.2006.20208679
What the OL 635 Module 5 instructions ask for
Milestone Two in OL 635 asks students to analyze their diagnostic findings and develop recommendations. Expect to consider more than one option for each cause identified in Milestone One, evaluate the options against criteria such as impact, cost, feasibility and fit with the client's capacity, recommend the strongest and prioritize them. Each recommendation should trace back to evidence from the diagnosis and, where possible, to research or comparable organizations' experience. Recommendations need enough detail, cost, owner and timing, that the client could act on them. The milestone should also acknowledge trade-offs and what the client would give up. Many prompts also ask which recommendation the client should start with and why, so make the sequence explicit.
How this OL 635 Module 5 milestone two example is built
The sample develops recommendations for the Harlow Parks and Recreation Department, an imagined agency in a North Carolina city of about 140,000. For each cause found in the diagnosis, it compares options: for lifeguard shortages, a pay increase, paid certification or contracting pool staffing; for camp schedules, extended hours or partnering with an after-school provider; for registration, retraining staff on the current system or rebuilding it as one catalog. It recommends five changes, paid certification with a $1.75 raise, camps to 6 p.m. with a sliding-scale fee, a rebuilt citywide registration catalog with phone and in-person help, evening and weekend adult classes and a citywide program manager, then costs and ranks them. Rousseau's case for evidence-based management, Briner, Denyer and Rousseau's clarification of the idea and Lapsley and Oldfield's study of consultants in the public sector frame the work.
Where the OL 635 Module 5 rubric puts the points
OL 635 Milestone Two is marked on analysis that links each cause to options, sound criteria for comparing options, recommendations traced to evidence, realistic costs, owners and timing, sensible prioritization, honest discussion of trade-offs and research on evidence-based practice. Recommendations that a client could start acting on the following week earn the most. Points slip when recommendations are generic best practices unconnected to the diagnosis, when only one option is considered, when costs or owners are missing, when everything is labeled a priority or when the client's capacity to carry out the changes is ignored. Readers reward an option table that lets the client see at a glance why one route beat another.
OL 635 Module 5 help: the mistakes that cost points
List each cause from your diagnosis and brainstorm two or three options for addressing it, including inexpensive ones. Choose criteria, such as expected impact, cost, time to results and the client's capacity, and compare the options against them, perhaps in a table. Recommend the strongest option for each cause, with cost, owner and timing. Rank the recommendations so the client knows where to start. Trace each recommendation to the evidence that supports it and to research or peer organizations where possible. Be honest about trade-offs: what the client gives up or risks. Keep the number of recommendations manageable; five strong ones are better than fifteen.
Get OL 635 Module 5 written to your instructions
Upload the OL 635 Milestone Two directions with your graded diagnosis. We analyze the findings, weigh options for each cause, recommend the strongest, cost and prioritize them by impact and feasibility and tie each to the evidence, supported by research on evidence-based management. The first OL 635 Milestone Two is free and delivered in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 635 papers and related MS Organizational Leadership samples
- OL 635 Module 1 Discussion: The Consultant's Role
- OL 635 Module 2 Proposal Assignment: Consulting Proposal and Contracting
- OL 635 Module 3 Milestone One: Organizational Diagnosis
- OL 635 Module 4 Discussion: Consulting Ethics
- OL 635 Module 6 Discussion: Delivering Feedback and Handling Resistance
- OL 635 Module 7 Milestone Three: Implementation and Evaluation Plan
- OL 635 Module 8 Discussion: Knowledge Transfer and Client Capability
- OL 635 Module 9 Final Project: Consulting Report
- OL 635 Module 10 Discussion: Reflecting on the Consulting Role
- OL 610 Module 5 Milestone Two: Collective Bargaining Plan
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- ACC 692 Module 9 Milestone Three: Preparing to Testify as an Expert
- MKT 675 Module 3 Milestone One: Issues Inventory and Stakeholders
OL 635 Module 5 questions, answered
Where can I find a free OL 635 Module 5 Milestone Two sample?
This page holds the full OL 635 Milestone Two: costed, prioritized recommendations for a city parks department based on its diagnosis.
What is evidence-based management?
Making management decisions using the best available evidence, from research, organizational data, professional experience and stakeholders, rather than habit or fashion.
How should consultants prioritize recommendations?
By weighing expected impact against cost, time and the client's capacity, so the client can start with changes that do the most good soonest.
How many recommendations should a consulting report include?
Usually a handful of well-supported, specific recommendations, since long lists dilute attention and rarely get carried out.
Why compare options before recommending?
Considering alternatives shows the client the reasoning, surfaces cheaper or faster routes and makes the recommended option more credible.