| Course | OL 635 Consulting |
|---|---|
| Module | Module 9 |
| Paper type | graduate final project presenting a complete consulting report: engagement, diagnosis, recommendations, implementation and evaluation plan |
| Length | About 1,040 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 635 Module 9
Bringing Residents Back: A Consulting Report for the Harlow Parks and Recreation Department
[Student Name]
Southern New Hampshire University
OL 635: Consulting
Final Project: Consulting Report
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Bringing Residents Back: A Consulting Report for the Harlow Parks and Recreation Department
Executive Summary
Program registrations at the Harlow Parks and Recreation Department fell 22 percent in three years, from about 31,400 to 24,500, and two of four pools cut to five days a week last summer. Residents' shift to private gyms and travel sports explains part of the decline, but most of it comes from barriers the department can remove: program times built around a traditional workday, a registration system set up separately by three divisions that drives many residents away before they pay, lifeguard pay $2.75 an hour below peer cities with certification costs paid by applicants, and three divisions with no one responsible for participation citywide. Five changes, ranked by impact, would cost about $206,000 in the first year, 1.4 percent of the department's budget: paid lifeguard certification with a raise, a single sign-up catalog backed by phone and walk-in help, a citywide program manager, camps extended to 6 p.m. and adult classes moved to evenings and weekends. Recovering half the lost registrations would return about $240,000 a year in fees. The first step is council approval of lifeguard funding in January, ahead of spring hiring.
What Changed Since the Milestones
The milestone grader pushed for firmer evidence behind the coordination finding, a stronger link between the evaluation plan and the measures council already receives and more attention to seniors. The coordination finding now cites staff interviews and peer-city practice, the evaluation reports through the department's quarterly council report and senior programs have their own measure and in-person registration help.
The Engagement
The twelve-week engagement asked three questions: had residents' demand changed, could the department staff its programs and were schedules, prices or registration blocking participation? Evidence came from three years of registration records, a resident survey of 1,140 households including 210 paper responses, four neighborhood focus groups, interviews with 12 staff, registration system logs and a benchmark of four peer cities. A working group of five department staff helped design the survey, attended focus groups and tested findings. Appelbaum and Steed (2005) found that employees judged consulting projects more successful when objectives were clear and clients were involved, which is why the working group was part of every stage.
Diagnosis
Burke and Litwin (1992) described organizational performance as shaped by links running from the external environment through strategy, leadership and culture to structure, systems, climate and motivation. In Harlow, the environment changed: more households have two working adults, the labor market for young workers tightened and residents now expect to register online. The department's systems and structure did not keep pace. The registration decline was concentrated in swim lessons (down 37 percent), youth camps (27 percent), weekday adult classes (30 percent) and senior programs (54 percent), while evening and weekend classes grew 6 percent. Survey respondents named program times (46 percent) and registration difficulty (38 percent) far more often than private alternatives (17 percent). System logs showed 41 percent of online registrations abandoned before payment. Lifeguard positions were 71 percent filled, compared with 94 percent three years earlier. And no one owned the calendar or participation across divisions.
Recommendations
What each change answers and costs
| Cause found in the diagnosis | Change recommended | Year-one cost |
|---|---|---|
| Pools short of lifeguards | Department pays for certification, with a season's commitment, and adds $1.75 an hour | $96,000 |
| Residents abandoning online sign-up | A single catalog for the whole city, plus staffed phone lines and help at centers | $58,000 |
| No one owns participation citywide | A program manager over all three divisions, from a vacant slot | $12,000 net |
| Camps ending before parents finish work | Camp day runs to 6 p.m., extra hours on a sliding fee | $34,000 net |
| Weekday classes missing working adults | Half of adult classes shift to evenings and Saturdays, seniors keep mornings | $6,000 |
Each recommendation traces to evidence from at least two sources and to peer-city practice. Rousseau (2006) argued that managers should base practices on the best available evidence, as medicine does, and these recommendations combine the department's own data, peer cities' experience, staff judgment and residents' views.
Implementation and Evaluation
The work is phased around the department's calendar: certification and hiring in February to April, the program manager hired in February, extended camps open for registration in March, the registration catalog rebuilt in April to June for July sign-ups and adult classes shifted for summer. Leadership passes to the same five-person staff group that worked with the consultant, under the new program manager. Klein and Sorra (1996) found that employees use a new practice more consistently when the organization's climate signals that it is expected and supported and when the practice fits their values, which is why the staff who shaped the recommendations will lead them. Measures with baselines and targets, lifeguard positions filled, pool days open, completed online registrations, camp, adult and senior registrations and total registrations, are reported monthly to the director and quarterly to council, with a six-month evaluation in September. The program manager will produce the dashboard independently after a joint final analysis with the consultant.
What the Department Should Do First
Three steps should happen in the next sixty days. The director should present the lifeguard funding request to council in January, since spring hiring cannot wait for the full budget. The program manager position should be reclassified and posted internally so the role is filled before registration work begins. And the camp registration materials for March should advertise the 6 p.m. option, even if the sliding-scale details are still being finalized. Each of these steps is inexpensive and visible to residents within one season.
Limits of the Evidence
The survey likely underrepresents residents who have never used the department. Registration counts are enrollments, not unique residents. The benchmark covers four cities. And the recommendations' effects cannot be fully separated from outside events such as weather or new private facilities; the evaluation compares programs and neighborhoods that change at different times to reduce that problem.
Conclusion
Harlow's residents have not lost interest in their parks and programs. Many are trying to participate and running into schedules, systems and staffing gaps the department can fix. The five recommendations address those barriers at modest cost and leave the department with a team, a plan and the measures to show council the results.
References
Appelbaum, S. H., & Steed, A. J. (2005). The critical success factors in the client-consulting relationship. Journal of Management Development, 24(1), 68-93. https://doi.org/10.1108/02621710510572362
Burke, W. W., & Litwin, G. H. (1992). A causal model of organizational performance and change. Journal of Management, 18(3), 523-545. https://doi.org/10.1177/014920639201800306
Klein, K. J., & Sorra, J. S. (1996). The challenge of innovation implementation. Academy of Management Review, 21(4), 1055-1080. https://doi.org/10.5465/amr.1996.9704071863
Rousseau, D. M. (2006). Is there such a thing as "evidence-based management"? Academy of Management Review, 31(2), 256-269. https://doi.org/10.5465/amr.2006.20208679
What the OL 635 Module 9 instructions ask for
The OL 635 final project is a consulting report for the client organization, built from the diagnosis, recommendations and implementation milestones after revision. Typical prompts expect a short summary for decision makers, an account of how the engagement ran and what data it used, the diagnosis with supporting evidence, recommendations with costs and priorities, an implementation and evaluation plan and a discussion of limitations. The report should be written for the client's decision makers, who may read only the summary, while still giving enough evidence that skeptical readers can check the reasoning. Strong reports make the logic from evidence to diagnosis to recommendation easy to follow, are candid about what the evidence cannot show and leave the client equipped to act without the consultant.
How this OL 635 Module 9 final project example is built
The sample presents the report for the Harlow Parks and Recreation Department, an imagined agency in a North Carolina city of about 140,000, whose registrations fell from about 31,400 to 24,500 in three years. It opens with a one-page summary for the director and council, describes a twelve-week engagement using registration records, a resident survey of 1,140 households, focus groups, staff interviews and a peer-city benchmark, and presents a diagnosis organized by the Burke-Litwin model. Five recommendations, paid lifeguard certification with a raise, one citywide registration catalog, a program manager, extended camp hours and evening adult classes, are costed at about $206,000 and ranked, followed by an implementation and evaluation plan and the evidence's limits, citing research on diagnosis, consulting success, evidence-based management and implementation.
Where the OL 635 Module 9 rubric puts the points
The OL 635 consulting report is graded on a summary that decision makers can act on, a clear account of the engagement and methods, a diagnosis supported by converging evidence, recommendations tied to the diagnosis with costs and priorities, a workable implementation and evaluation plan, candor about limitations, revision from milestone feedback and professional writing. Reports whose reasoning a skeptical council member could follow from data to recommendation do best. Marks fall for summaries that bury the answer, for diagnoses resting on one source, for recommendations without costs or owners, for implementation plans that depend on the consultant or for reports that hide what the evidence cannot show.
OL 635 Module 9 help: the mistakes that cost points
Start by revising each milestone using the comments you received. Save the one-page summary for the end, and make it answer five things: the problem, the findings, the advice, the price and the first move. Describe the engagement and methods briefly but clearly enough that readers trust the data. Present the diagnosis with the evidence for each cause. Present recommendations ranked, costed and owned. Include the implementation and evaluation plan, written so the client can run it alone. Add a short section on the limits of the evidence. Use headings, tables and plain language, and read the report as the client's toughest critic would.
Get OL 635 Module 9 written to your instructions
Send the OL 635 final project prompt, your three graded milestones and the client details. We assemble and revise them into one consulting report: executive summary, engagement and methods, diagnosis, ranked and costed recommendations, implementation and evaluation plan and limits of the evidence, written for the client's decision makers. We write the first OL 635 report at no cost, generally within two days of receiving the files. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 635 papers and related MS Organizational Leadership samples
- OL 635 Module 1 Discussion: The Consultant's Role
- OL 635 Module 2 Proposal Assignment: Consulting Proposal and Contracting
- OL 635 Module 3 Milestone One: Organizational Diagnosis
- OL 635 Module 4 Discussion: Consulting Ethics
- OL 635 Module 5 Milestone Two: Analysis and Recommendations
- OL 635 Module 6 Discussion: Delivering Feedback and Handling Resistance
- OL 635 Module 7 Milestone Three: Implementation and Evaluation Plan
- OL 635 Module 8 Discussion: Knowledge Transfer and Client Capability
- OL 635 Module 10 Discussion: Reflecting on the Consulting Role
- ACC 692 Module 6 Milestone Two: Rights, Warnings and Evidence That Will Hold
- BMB 655 Module 10 Final Project: A Three-Year Financial Plan
- FIN 610 Module 3 Milestone One: The Cash Conversion Cycle and Where It Can Shrink
- FIN 620 Module 8 Derivatives Assignment: A Swap Offered to Fix a Variable-Rate Bond
OL 635 Module 9 questions, answered
Where can I find a free OL 635 Module 9 Final Project sample?
The complete OL 635 final project is on this page: a consulting report for a city parks department, from diagnosis to implementation plan.
What sections belong in a consulting report?
An executive summary, the engagement and methods, the diagnosis and evidence, prioritized and costed recommendations, an implementation and evaluation plan and limitations.
How long should a consulting report's executive summary be?
Usually one page, stating the problem, key findings, recommendations, cost and first steps, since many decision makers read nothing else.
Why include limitations in a consulting report?
Stating what the evidence cannot show builds credibility and helps the client judge how much weight to place on each finding.
How do you make consulting recommendations stick?
Tie them to evidence the client trusts, involve client staff in shaping them and leave a plan with owners, measures and review points the client can run alone.