OL 668 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 668 Module 1 Discussion sample asks how HR management changes when an organization operates in several countries and what orientation headquarters should take toward its foreign sites. SNHU OL 668 (OL-668) opens its MS Organizational Leadership course on global HR with this question. Northlake Airflow, a composite Michigan maker of commercial kitchen hoods, translated its U.S. handbook for plants in San Luis Potosí and Gdańsk; the Mexican plant lost a third of its welders in a year and the Polish works council rejected an attendance policy. The post applies a framework of strategic international HRM, evidence that affiliates follow local practice and a model of globalizing HRM.

CourseOL 668 Human Resources in Global Contexts
ModuleModule 1
Paper typegraduate discussion post on how human resource management changes when an organization operates in several countries, and the orientations headquarters can take toward foreign sites
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 668 Module 1

1

Module One Discussion

A Michigan Handbook in Two Languages

I direct HR at Northlake Airflow, a Grand Rapids maker of commercial kitchen hoods and fire suppression systems with 1,400 employees. In 2022 we opened a plant in San Luis Potosí, Mexico, and in 2024 we acquired a Polish fabricator on the Baltic coast in Gdańsk. Our approach was simple: translate the U.S. handbook and send experienced American managers. Within a year a third of the Mexican plant's welders had left for automotive suppliers nearby, and the Polish works council formally objected to our points-based attendance policy, which counts every absence the same way.

What this page is doingWhat happened.
2

Schuler et al. (1993) proposed a framework of strategic international HRM in which a multinational must balance the links among its units with each unit's need to operate effectively in its own environment, shaped by factors inside and outside the firm. Rosenzweig and Nohria (1994), studying U.S. affiliates of foreign multinationals, found that affiliates' HR practices generally resembled those of local competitors, with the degree varying by practice. Brewster et al. (2005) proposed that organizations going global develop their HR by connecting people and knowledge across units, often through technology, instead of cloning what headquarters does.

What this page is doingWhat makes global HR different.
3

We acted ethnocentrically. Our attendance policy assumed workers in Gdańsk would accept rules that our Michigan workers accept, but Polish labor law and workplace norms give employee representatives a voice we did not expect. In Mexico, we paid the wage we had benchmarked from one survey and ignored that a new automotive cluster was bidding up welders' pay. Neither mistake was cultural in the stereotypical sense; both came from treating foreign sites as copies of Grand Rapids.

What this page is doingWhere we stand.
4

I would make three things the same everywhere: safety standards, our code of ethics and the skills standard for welders and fabricators. Pay, leave, benefits and attendance rules should follow local law and local labor markets, designed by people who know them. A geocentric approach would also mean the next plant manager in San Luis Potosí could be Mexican, Polish or American, chosen on merit.

What this page is doingWhat should be global.
5

If you could standardize only one HR practice across every country where your organization works, which would it be, and why that one?

What this page is doingYour view.
6

References

Brewster, C., Sparrow, P., & Harris, H. (2005). Towards a new model of globalizing HRM. The International Journal of Human Resource Management, 16(6), 949-970. https://doi.org/10.1080/09585190500120590

Rosenzweig, P. M., & Nohria, N. (1994). Influences on human resource management practices in multinational corporations. Journal of International Business Studies, 25(2), 229-251. https://doi.org/10.1057/palgrave.jibs.8490199

Schuler, R. S., Dowling, P. J., & De Cieri, H. (1993). An integrative framework of strategic international human resource management. Journal of Management, 19(2), 419-459. https://doi.org/10.1177/014920639301900209

What the OL 668 Module 1 instructions ask for

The first OL 668 discussion asks how human resource management differs when an organization operates internationally. Expect to explain what changes, such as legal systems, labor markets, cultures, languages, distance and the need to coordinate across units, and to describe the orientations headquarters can take: ethnocentric, exporting home practices; polycentric, leaving each country to its own; and geocentric, drawing the best people and practices from anywhere. Research shows strong pressure for affiliates' HR practices to resemble local ones, varying by practice, so the best posts specify which practices can be global and which must be local. Use a real or familiar organization. In replies, ask classmates which single practice they would standardize worldwide and why.

How this OL 668 Module 1 discussion example is built

The post comes from the HR director of Northlake Airflow, an imagined 1,400-employee maker of commercial kitchen hoods and fire suppression systems in Grand Rapids, Michigan. When it opened a plant in San Luis Potosí in 2022 and bought a fabricator in Gdańsk in 2024, it translated its U.S. handbook and sent American managers to run both. A third of the Mexican plant's welders left within a year, and the Polish works council objected to a points-based attendance policy. Schuler, Dowling and De Cieri's framework of strategic international HRM, Rosenzweig and Nohria's finding that affiliates' HR practices tend to follow local norms and the model of globalizing HRM from Brewster, Sparrow and Harris show the company acting ethnocentrically, and the post asks classmates which practices should be global.

Where the OL 668 Module 1 rubric puts the points

The opening OL 668 discussion is generally judged on a clear account of what changes in HR across borders, accurate use of the ethnocentric, polycentric and geocentric orientations, research on global and local pressures, a specific example and replies that challenge classmates' choices of what to standardize. The strongest posts name particular practices, such as safety standards or leave, and argue for each. Weaker posts treat global HR as domestic HR with translation, describe cultures in stereotypes, ignore law and labor markets or simply restate a classmate's example in reply. Instructors also look for honesty about the costs of a geocentric approach as well as its benefits.

OL 668 Module 1 help: the mistakes that cost points

Pick an organization with sites in more than one country and describe how it handles HR at each. List what differs: employment law, benefits norms, labor markets, languages and expectations of managers. Read the frameworks on ethnocentric, polycentric and geocentric orientations and on strategic international HRM, and research showing which practices tend to follow local norms. Then sort the organization's practices into those that should be the same everywhere, such as safety and ethics standards, and those that should follow local law and custom, such as leave, benefits and some pay practices. Say where the organization stands today. Close by asking OL 668 classmates which one practice they would make global.

Get OL 668 Module 1 written to your instructions

Describe an organization with operations abroad and paste the OL 668 Module 1 prompt. Our writers explain what makes HR different across borders, apply research on strategic international HRM and on local versus global practices, place the organization's approach on the ethnocentric to geocentric range and ask OL 668 classmates which practices should be global. Your first OL 668 post is free within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 668 papers and related MS Organizational Leadership samples

OL 668 Module 1 questions, answered

Where can I find a free OL 668 Module 1 Discussion sample?

The full OL 668 Module 1 post is on this page: why a Michigan manufacturer's translated handbook failed at its plants in Mexico and Poland.

What is an ethnocentric approach to international HR?

Exporting headquarters' practices and managers to foreign sites, on the assumption that home-country ways work best everywhere.

What is a geocentric approach to HR?

Treating the organization as a global whole, filling key roles with the best people regardless of nationality and building practices that draw on all its locations.

What is the difference between polycentric and geocentric?

A polycentric approach leaves each country to run its own HR with local managers; a geocentric approach integrates practices and talent across countries.

Which HR practices are usually local?

Research on multinational affiliates found benefits and time off tend to follow local practice most closely, while practices tied to senior managers' pay tend to follow headquarters more.