OL 668 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 668 Module 8 Discussion sample asks how organizations should handle pay gaps between expatriates and local employees who work side by side. SNHU OL 668 (OL-668) raises this question in Module 8 of its MS Organizational Leadership course on global HR. At the San Luis Potosí plant of Northlake Airflow, an invented Michigan kitchen hood maker, the Mexican production manager learned that the American plant manager next door earns about six times his pay once housing, schooling and a car are counted. The post uses a study of how local employees judge such gaps, research on alternatives to expatriation and on what expatriates do, and asks classmates whether such gaps can feel fair.

CourseOL 668 Human Resources in Global Contexts
ModuleModule 8
Paper typegraduate discussion post on how organizations should handle pay gaps between expatriates and local employees in the same workplace
LengthAbout 380 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 668 Module 8

1

Module Eight Discussion

Six Times the Pay, One Office Apart

Our Mexican production manager at Northlake Airflow's San Luis Potosí plant is an engineer with twelve years in automotive manufacturing. Last month he learned, from a housing agent, what the company pays for the American plant manager's house. With base pay, housing, international school fees for two children, a car with a driver and a hardship allowance, the plant manager costs about six times what the production manager earns. He did not ask for a raise. He asked me whether a Mexican could ever run the plant.

What this page is doingThe question.
2

Chen et al. (2002), studying local employees in China-foreign joint ventures, found that pay disparity with expatriates was seen as unfair, but that the sense of unfairness was reduced when employees compared themselves with other local workers, when they accepted explanations for the disparity and when expatriates showed interpersonal sensitivity. Collings et al. (2007) listed ways to staff foreign units without multiyear postings, from brief assignments to growing local talent and bringing it to headquarters. Harzing (2001) showed that expatriates do more than control a subsidiary; they can also socialize people and build networks between headquarters and the site, roles that justify the cost only if they are actually performed.

What this page is doingWhat research says.
3

Some of the gap is explainable. The plant manager's base pay reflects the U.S. labor market for plant managers, and the allowances cover moving a family across a border. Saying that honestly is better than pretending the gap does not exist. And Chen's findings suggest that how the plant manager behaves matters: the production manager told me what bothered him most was being left out of meetings with Grand Rapids.

What this page is doingExplaining the gap.
4

The better answer to his real question is a career path. Under the plan in Milestone Two, the production manager would spend six months in Grand Rapids as an inpatriate, the plant manager would be measured partly on preparing a local successor and the next plant manager would be hired on local terms. Within three years, the sixfold gap at the top of the plant could disappear because the role would be held by a Mexican manager earning a strong salary by regional standards.

What this page is doingNarrowing it.
5

Can a large pay gap between colleagues doing similar work ever feel fair, and what would make it feel less unfair to you?

What this page is doingYour view.
6

References

Chen, C. C., Choi, J., & Chi, S.-C. (2002). Making justice sense of local-expatriate compensation disparity: Mitigation by local referents, ideological explanations, and interpersonal sensitivity in China-foreign joint ventures. Academy of Management Journal, 45(4), 807-817. https://doi.org/10.5465/3069313

Collings, D. G., Scullion, H., & Morley, M. J. (2007). Changing patterns of global staffing in the multinational enterprise: Challenges to the conventional expatriate assignment and emerging alternatives. Journal of World Business, 42(2), 198-213. https://doi.org/10.1016/j.jwb.2007.02.005

Harzing, A.-W. (2001). Of bears, bumble-bees, and spiders: The role of expatriates in controlling foreign subsidiaries. Journal of World Business, 36(4), 366-379. https://doi.org/10.1016/S1090-9516(01)00061-X

What the OL 668 Module 8 instructions ask for

The eighth OL 668 discussion asks how organizations should handle compensation differences between expatriates and local employees. Expect to explain why expatriate packages are often far larger, through home-country pay, allowances for housing, schooling, cost of living and hardship, and tax equalization, and how local employees may perceive the gap. Research on justice suggests that whom employees compare themselves with, the explanations they receive and how expatriates behave can shape whether gaps feel unfair. Strong posts consider both explaining the gap and reducing it through staffing choices. Apply the question to a specific situation. Replies should ask classmates what they would say to the local manager who raised the issue.

How this OL 668 Module 8 discussion example is built

The post follows the HR director of Northlake Airflow, a made-up maker of commercial kitchen hoods, after its Mexican production manager in San Luis Potosí learned that the American plant manager he works beside earns, with housing, international school fees, a car and allowances, about six times his own pay. He did not ask for a raise; he asked whether his career at the company had a ceiling. Chen, Choi and Chi's study of how local employees in China-foreign joint ventures judged pay disparities, Collings, Scullion and Morley's account of alternatives to traditional expatriate assignments and Harzing's study of expatriates' control roles support a two-part answer: explain the gap honestly and narrow it by developing local leaders. The post asks classmates whether such gaps can ever feel fair.

Where the OL 668 Module 8 rubric puts the points

The Module 8 discussion in OL 668 is generally assessed on a clear explanation of why expatriate and local pay differ, accurate use of research on perceived fairness of pay disparities, attention to staffing choices that change the size of the gap, a specific proposal for the situation and replies that test classmates' answers. The posts that score highest treat the local employee's question about career ceilings as the real issue. Marks slip for posts that simply defend packages as market necessity, that propose cutting expatriate pay without considering recruitment, that ignore how expatriates' behavior affects perceptions or that respond to classmates with general statements about inequality rather than the case at hand.

OL 668 Module 8 help: the mistakes that cost points

Describe the two employees and break down the expatriate's package: base pay, housing, schooling, cost-of-living and hardship allowances and tax treatment. Explain how the local employee learned of it and what they actually asked. Read research on how local employees judge pay disparities, including the effects of comparison groups, explanations and expatriates' sensitivity. Consider staffing choices that change the gap, such as shorter assignments, local hires and inpatriates. Propose what to say now and what to change over time. Be honest about what cannot be equalized, such as differences between labor markets. Close by asking OL 668 classmates whether a pay gap between colleagues doing similar work can feel fair, and under what conditions.

Get OL 668 Module 8 written to your instructions

Paste the OL 668 Module 8 prompt and describe the pay differences in your organization or case. We write a post that explains why expatriate and local pay differ, applies research on how local employees judge such gaps and on staffing alternatives, proposes how to explain and narrow the gap and asks OL 668 classmates whether such gaps can feel fair. Your first OL 668 pay post is free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 668 papers and related MS Organizational Leadership samples

OL 668 Module 8 questions, answered

Where can I find a free OL 668 Module 8 Discussion sample?

This page holds the complete OL 668 Module 8 post on a sixfold pay gap between an American expatriate and his Mexican colleague.

Why are expatriates paid more than local employees?

Packages often keep home-country pay and add allowances for housing, schooling, cost of living, hardship and taxes, so total cost can far exceed local pay for similar roles.

How do local employees react to expatriate pay gaps?

Research finds many see the gaps as unfair, but reactions are softened when they compare themselves with other locals, receive credible explanations and work with considerate expatriates.

What is tax equalization?

A policy in which the employer covers the difference in taxes so that an expatriate pays roughly what they would have paid at home.

How can companies reduce expatriate pay disparities?

By using fewer and shorter assignments, hiring and developing local managers, moving expatriates to local terms over time and explaining packages honestly.