| Course | MKT 620 Consumer Behavior and Marketing |
|---|---|
| Module | Module 10 |
| Paper type | graduate final project presenting a complete consumer behavior analysis of a target market and marketing recommendations grounded in it |
| Length | About 1,140 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 620 Module 10
Why They Wait for the Next Storm: A Consumer Behavior Analysis for Red Dirt Safe Rooms
[Student Name]
Southern New Hampshire University
MKT 620: Consumer Behavior and Marketing
Final Project: Consumer Behavior Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Why They Wait for the Next Storm: A Consumer Behavior Analysis for Red Dirt Safe Rooms
Summary
Red Dirt Safe Rooms has a problem most companies would envy and few could solve: nearly everyone in its market believes in its product, and most of them do not buy it. This analysis set out to explain why homeowners who want a tornado safe room wait for the next storm. The answer is that wanting is not the obstacle. Perceived risk rises after nearby storms and fades within months; motives are strong but confidence about cost, choice and installation is weak; couples who disagree do not buy; and present bias makes next month always seem like a better time. The company's best opportunity is the large group of intenders who already want a safe room, and the way to reach them is not more fear but more confidence, a concrete plan and the people they already trust.
The Consumers
Buyers are mostly homeowners aged 30 to 55 with children at home or an older parent living with them, in houses without basements. They fall into three segments: recent witnesses who buy within weeks of a nearby storm, 46 percent of buyers; planners who research for months and buy in quiet seasons, 31 percent; and intenders who request a quote and wait a year or more, 23 percent. Among surveyed homeowners without a shelter, roughly a fifth had already gotten a price and still meant to buy, a pool that dwarfs a year of the company's orders. Intenders are the focus because they already want the product and their obstacle can be addressed.
How They Perceive the Risk
Calls to the company jump about threefold in the weeks after a nearby storm wrecks homes, and most come from households the storm never came near. Flood insurance shows the same shape in Gallagher (2014): policies jumped after floods and drifted back down over the next years, and even towns that stayed dry but watched the same local news bought more. The availability of vivid images, not any change in actual risk, drives the surge. Then a lifetime of spring sirens does its work, and by midsummer the danger feels ordinary again. The company cannot change that cycle, but it can stop depending on it.
What Moves Them and What Stops Them
Intenders want to protect their children and older parents and to end the frightening scramble during night warnings. Almost all trust a shelter to keep them alive if the tornado comes straight at the house. Far fewer trust themselves on the practical side: picking the right type, fitting the cost into the budget, arranging the install. Witte and Allen (2000) showed across many studies that fear moves people only alongside confidence in the remedy and in their own ability to use it. The intenders' shortfall is not fear and not faith in the product; it is the practical confidence to get from wanting to owning.
The People Around Them
Installations cluster on the same streets. Bollinger and Gillingham (2012) found that each additional rooftop solar installation in a California ZIP code raised the probability of another, and safe rooms appear to spread the same way: 38 percent of recent buyers had an earlier installation within a quarter mile. Partners matter even more. Fewer than half of intenders said their partner agreed on buying now, and none of the interviewed intenders whose partners disagreed had bought. Churches, schools and youth sports carry information, and a regional pride in riding out storms leads some, often men, to see sheltering as overreaction.
Why "Later" Wins
The company's follow-up notes are full of "after the holidays." A purchase with immediate costs and an uncertain future benefit is exactly the kind people with present-biased preferences postpone. Milkman et al. (2011) found, at an employer's flu clinics, that a reminder asking staff to note the day and hour of their shot got more of them vaccinated than a plain reminder did. A concrete plan helps people do what they already intend.
After the Purchase
Satisfaction is high, but it depends on expectations and experience. In the terms Oliver (1980) used, satisfaction grows from expectations meeting reality; buyers surprised by the size, the door or the installation day rated the company much lower, and owners who had used the room during a warning were the most satisfied and recommended the company most. Owners who have not used their rooms are prone to doubt in quiet years. Since a safe room is bought once, recommendations are the company's main form of loyalty.
Recommendations
Quiet-season program
| Action | Finding it answers | How it will be tested |
|---|---|---|
| Five-minute home assessment ending in one recommended model | Weak confidence about choice | Randomly offer it to 50 percent of past quote requesters; compare six-month purchases |
| Every quote with a monthly figure and a chosen installation date, movable without cost | Weak confidence about cost; present bias | Same test |
| Both partners invited to the assessment, with a one-page summary | Partner disagreement | Track purchases by partner attendance |
| Neighbor open houses at recent installs, with owners' consent | Peer effects | Compare inquiries near open houses with matched streets |
| Pre-season visit for new owners in March | Doubt and door complaints | Compare satisfaction and referrals with prior owners |
Ethics
The analysis could be used to amplify fear, and it should not be. Consumers in nearby towns after a storm are in a vulnerable state, and fear without a clear, achievable response leads to avoidance rather than action. In the three days following a destructive storm close by, the company stays quiet apart from telling people how to reach it; its ads never show real wreckage, and its deadlines are always real. Every recommendation above helps consumers act on an intention they already hold, and every one can be declined without cost.
What the Analysis Cannot Show
Much of the evidence comes from a survey and interviews, and both describe what people say. Survey respondents were probably more interested in tornado safety than homeowners in general, and stated intentions to buy are an optimistic guide to behavior. The neighbor clustering could partly reflect similar households choosing similar homes, not only influence between them. And the recommendations, however well grounded, are predictions until they are tested. That is why each one in the table carries a test, and why the program should be judged by purchases among households that received it compared with those that did not, rather than by how persuasive it sounds.
Conclusion
Red Dirt does not need to persuade its market that safe rooms are wise. It needs to help the families who already believe it turn a decision they have made many times into a date on the calendar, with the people they trust beside them. The program asks for a modest investment in assessments and visits and will be judged by purchases among tested households within six months.
References
Bollinger, B., & Gillingham, K. (2012). Peer effects in the diffusion of solar photovoltaic panels. Marketing Science, 31(6), 900-912. https://doi.org/10.1287/mksc.1120.0727
Gallagher, J. (2014). Learning about an infrequent event: Evidence from flood insurance take-up in the United States. American Economic Journal: Applied Economics, 6(3), 206-233. https://doi.org/10.1257/app.6.3.206
Milkman, K. L., Beshears, J., Choi, J. J., Laibson, D., & Madrian, B. C. (2011). Using implementation intentions prompts to enhance influenza vaccination rates. Proceedings of the National Academy of Sciences, 108(26), 10415-10420. https://doi.org/10.1073/pnas.1103170108
Oliver, R. L. (1980). A cognitive model of the antecedents and consequences of satisfaction decisions. Journal of Marketing Research, 17(4), 460-469. https://doi.org/10.2307/3150499
Witte, K., & Allen, M. (2000). A meta-analysis of fear appeals: Implications for effective public health campaigns. Health Education & Behavior, 27(5), 591-615. https://doi.org/10.1177/109019810002700506
What the MKT 620 Module 10 instructions ask for
The MKT 620 Final Project generally asks for a comprehensive consumer behavior analysis of a target market for a product or brand, with marketing recommendations based on it. Expect to integrate the earlier work: the target consumers, their decision process, perception, motivation and attitudes, social and cultural influences, decision shortcuts, post-purchase behavior and ethical considerations. A strong analysis is organized around a central question about consumer behavior, uses evidence throughout, applies research to explain each pattern and ends with recommendations that each trace back to a finding. It revises earlier milestones using feedback and addresses the ethics of the recommended tactics, not only their likely effectiveness.
How this MKT 620 Module 10 final project example is built
The sample organizes the full analysis around one question: why homeowners who want a tornado safe room wait for the next storm to buy one. It summarizes the buyers and the three segments, with intenders as the focus; risk perception that rises with nearby storms and fades, as in Gallagher's flood insurance study; strong motives with weak confidence, explained with Witte and Allen; the neighbor effects measured by Bollinger and Gillingham and the partner splits in the interviews; present bias and the planning prompts tested by Milkman and colleagues; and satisfaction shaped by expectations, after Oliver. It ends with a quiet-season program and ethical limits on fear, with a test plan.
Where the MKT 620 Module 10 rubric puts the points
The MKT 620 Final Project is commonly graded on a clear central question, a well-defined target market, integration of the consumer behavior concepts studied, use of evidence and research, recommendations that follow from the analysis, attention to ethics and overall organization and writing. Top analyses read as one argument, show how each concept explains part of the same behavior and give recommendations with a reason and a measure. Analyses lose marks when they read as a series of separate assignments, apply concepts without evidence, recommend tactics unconnected to the findings or ignore whether the tactics respect consumers. Showing what changed from earlier milestones after feedback adds credibility, as does a short note on what the analysis could not establish.
MKT 620 Module 10 help: the mistakes that cost points
Start with one question about your consumers that the whole analysis answers. Revise each earlier piece using feedback, then arrange the sections so each explains part of the answer. Keep evidence visible: survey figures, interview themes, sales patterns. Use research to explain each pattern, not to fill space. Make every recommendation trace to a finding, and say how you would test it. Include a section on the ethics of your recommendations. Write the summary last, in plain language, so a manager could act on it. Check that every citation appears in the reference list and that figures match across sections. A final read for any recommendation without a matching finding catches the most common weakness.
Get MKT 620 Module 10 written to your instructions
Upload the MKT 620 Final Project brief and your graded milestones. You receive a single consumer behavior analysis that runs from the consumers and their decisions to influences, post-purchase behavior and ethics, with recommendations that follow from the evidence and research behind every claim. The first final analysis is free and generally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 620 papers and related MS in Marketing samples
- MKT 620 Module 1 Discussion: Why Consumers Buy, and Why They Do Not
- MKT 620 Module 2 Consumer Decision Process Assignment: The Consumer Decision Process
- MKT 620 Module 3 Milestone One: Target Consumer Profile
- MKT 620 Module 4 Discussion: Perception and the Availability of Risk
- MKT 620 Module 5 Motivation and Attitudes Assignment: Consumer Motivation and Attitudes
- MKT 620 Module 6 Milestone Two: Social, Group and Cultural Influences
- MKT 620 Module 7 Discussion: Decision Shortcuts and Procrastination
- MKT 620 Module 8 Post-Purchase Behavior Assignment: Post-Purchase Satisfaction, Dissonance and Loyalty
- MKT 620 Module 9 Discussion: Ethics of Persuasion and Vulnerable Consumers
- ACC 640 Module 10 Final Project: The Audit Plan and Critical Audit Matters
- MGT 510 Module 7 Culture Integration Assignment: Joining Two Ways of Working
- MGT 630 Module 4 Productivity Analysis Assignment: Ten Weeks of Panel Setting Data
- FIN 700 Module 1 Discussion: Capital Allocation as the Finance Leader's Main Job
MKT 620 Module 10 questions, answered
Where can I find a free MKT 620 Module 10 Final Project sample?
The full MKT 620 Final Project on this page analyzes why homeowners wait to buy tornado safe rooms and recommends a quiet-season marketing program.
What should a consumer behavior analysis include?
The target consumers, their decision process, perception, motivation and attitudes, social and cultural influences, decision shortcuts, post-purchase behavior, ethics and recommendations based on the findings.
How do I organize the MKT 620 final project?
Around one central question about your consumers, with each section explaining part of the answer and recommendations that trace back to specific findings.
How long is the MKT 620 final project?
It varies by section, but full analyses often run 12 to 20 pages plus tables; follow your guidelines and cover every required element.
How do I make consumer behavior recommendations ethical?
Base them on accurate information, aim them at helping consumers act on their own intentions and avoid tactics that exploit fear, distress or false urgency.