MKT 620 Module 8 Post-Purchase Behavior Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 620 Module 8 Post-Purchase Behavior sample analyzes what consumers think, feel and do after they buy: satisfaction, doubt, complaints, word of mouth and loyalty. SNHU MKT 620 (MKT-620) asks MS in Marketing students to extend their analysis past the moment of purchase. The consumers are buyers of steel tornado safe rooms from Red Dirt Safe Rooms, a composite Oklahoma company. Follow-up surveys of 410 owners and two years of complaint records show high satisfaction shaped by expectations and the first storm, doubt in quiet years, complaints about small practical faults and strong word of mouth, each explained with satisfaction research and turned into recommendations.

CourseMKT 620 Consumer Behavior and Marketing
ModuleModule 8
Paper typegraduate assignment analyzing consumers' behavior after purchase: satisfaction, doubt, word of mouth and loyalty, with recommendations
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 620 Module 8

1

The First Storm in the Shelter: Post-Purchase Behavior Among Safe Room Owners

[Student Name]

Southern New Hampshire University

MKT 620: Consumer Behavior and Marketing

Post-Purchase Behavior Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe owner survey, complaint records and quotes are composites made for this assignment.
2

The First Storm in the Shelter: Post-Purchase Behavior Among Safe Room Owners

Introduction

The earlier assignments focused on why homeowners hesitate to buy. This one follows those who did. A safe room is bought once, so loyalty does not show up as repeat purchase; it shows up in what owners say to neighbors, at church and online, which Milestone Two showed is how most buyers hear about the company. The analysis uses follow-up surveys returned by 410 owners who bought in the past three years and the company's complaint log for the past two years.

What this page is doingStates what happens after the sale.
3

Satisfaction and Expectations

Overall, 87 percent of owners rated themselves satisfied or very satisfied. Satisfaction varied in two ways that matter.

Satisfaction by experience and expectation (n = 410)

GroupOwnersVery satisfied
Used the room during at least one warning23674%
Have not yet used the room17449%
Said installation matched what the salesperson described34169%
Said installation differed from what they expected6931%

Oliver (1980) modeled satisfaction as the product of what people expected plus the surprise, good or bad, when reality differs, with the resulting feeling carrying forward into later attitudes and plans; his field study, fittingly, concerned a flu inoculation, another product people buy for protection against something that may not happen. Owners who found the installation different from what they were told were far less likely to be very satisfied, even when the difference was minor, such as a longer installation day or a larger footprint in the garage. Expectations set during the sale are part of the product.

Szymanski and Henard (2001), combining 50 studies in a meta-analysis, found that satisfaction was related to expectations, disconfirmation, performance, affect and equity, with disconfirmation and equity among the strongest correlates. The first storm spent inside the room appears to work as a moment of strong positive disconfirmation and feeling: owners describe relief, children falling asleep, a sense that the money was well spent. Owners who have not yet used the room have no such moment.

What this page is doingExplains what shapes satisfaction.
4

Doubt in Quiet Years

Among owners who had not used their room, 23 percent agreed that they "sometimes wonder whether the money was worth it," compared with 6 percent of those who had. Doubt peaked in the second year after purchase for owners who had not experienced a warning, often coinciding with monthly payments that continued while the room sat unused. Several owners described the room as storage space for holiday decorations. One wrote that her husband jokes about "the most expensive closet in Cleveland County."

What this page is doingDescribes post-purchase dissonance.
5

Why Expectations Drift at the Sale

The 69 owners whose installation differed from what they expected were not misled about anything important; their surprises were small and practical. The most common was size. A room rated for eight people is snug for a family of five with a large dog and a cat carrier, and a brochure photograph of an empty steel room does not show that. The second was the installation day itself: owners expected a crew for two or three hours and got one for most of a day, with drilling noise and a garage that had to be emptied. The third was the door, which closes firmly by design and surprised owners who tried it for the first time during a warning. In each case the salesperson had described the product accurately in general terms but had not shown the buyer what it would be like in their own garage with their own family. The gap was not dishonesty; it was abstraction.

What this page is doingTraces the source of the gap.
6

What Owners Who Have Not Used the Room Need

Owners who have not yet sheltered in their rooms are a large group, 174 of the 410 surveyed, and the one most at risk of doubt. They need what the others got from their first warning: a concrete experience that confirms the purchase. That experience does not have to be a storm. A practice session, timing how long it takes to get everyone inside at night, adjusting the door and stocking the room with water and a weather radio, gives owners a reason to feel prepared rather than merely spent. Several owners who had used their room said the first time was disorganized; practicing in daylight would have helped them too.

What this page is doingLooks at the quiet-year group.
7

Complaints

Complaints logged over two years (n = 183)

ComplaintShare
Door stiff or hard to latch from inside34%
Room smaller than expected with family and pets21%
Installation delay after storms19%
Garage floor or anchoring concern11%
Ventilation or heat in summer9%
Other6%

More than half the complaints concern two practical features, the door and the space, that the company can address with better information and a simple adjustment visit. None concerned the room's strength.

What this page is doingIdentifies what drives dissatisfaction.
8

Word of Mouth

Owners reported recommending Red Dirt to an average of 3.1 other households; those who had used their room in a warning averaged 4.2, and those who had not, 1.8. Anderson (1998), studying customers in the United States and Sweden, found an asymmetric U-shaped relationship between satisfaction and word of mouth, with both very satisfied and very dissatisfied customers talking more, and the dissatisfied somewhat more, though less than often assumed. For Red Dirt, the owners who came through a warning very satisfied, roughly four in ten of all owners, are its most active advocates, and the small number with unresolved complaints are its most dangerous critics, especially in close-knit church and neighborhood networks.

What this page is doingShows how owners influence others.
9

Recommendations

First, set expectations precisely at the sale: show the actual room size with tape on the garage floor, explain the installation day hour by hour and demonstrate the door. Second, schedule a free pre-season visit each March for the first two years to adjust the door, practice getting the family and pets inside and answer questions; this gives owners who have not used the room a reassuring experience with it and fixes the most common complaint. Third, after a warning, send owners a brief message asking how it went and inviting them to share their experience with neighbors, with a referral thank-you. Fourth, resolve every complaint with a named person and a visit, since dissatisfied owners talk.

What this page is doingTies actions to findings.
10

Limits

Owners who return surveys are probably more satisfied than those who do not, so the satisfaction figures may be high. The link between using the room and satisfaction may also reflect who lives in more exposed areas, not only the experience itself.

What this page is doingNotes what the data cannot show.
11

References

Anderson, E. W. (1998). Customer satisfaction and word of mouth. Journal of Service Research, 1(1), 5-17. https://doi.org/10.1177/109467059800100102

Oliver, R. L. (1980). A cognitive model of the antecedents and consequences of satisfaction decisions. Journal of Marketing Research, 17(4), 460-469. https://doi.org/10.2307/3150499

Szymanski, D. M., & Henard, D. H. (2001). Customer satisfaction: A meta-analysis of the empirical evidence. Journal of the Academy of Marketing Science, 29(1), 16-35. https://doi.org/10.1177/009207030102900102

What the MKT 620 Module 8 instructions ask for

The Module 8 assignment in MKT 620 usually asks you to analyze post-purchase consumer behavior for your product: satisfaction and dissatisfaction, cognitive dissonance, complaint behavior, word of mouth, repeat purchase and loyalty. Expect to explain what shapes satisfaction for your consumers, what happens when they are disappointed and how post-purchase experience feeds back into others' decisions. A strong assignment uses evidence such as follow-up surveys, reviews or complaint records, applies a satisfaction model to explain the patterns, recognizes that some products are rarely repurchased so loyalty shows up as recommendation, and recommends specific actions after the sale. It treats the post-purchase period as part of marketing, not only service.

How this MKT 620 Module 8 post-purchase behavior assignment example is built

The sample analyzes 410 follow-up surveys from Red Dirt Safe Rooms owners and two years of complaint records. Satisfaction is high, and it depends on expectations set by the salesperson and on whether the family has used the room in a warning. Doubt appears in quiet years, when the room sits unused and monthly payments continue. Complaints center on small faults, a stiff door, a cramped fit for large dogs. Satisfied owners recommend the company to about three households each. Oliver's expectation and disconfirmation model, Szymanski and Henard's meta-analysis and Anderson's work on word of mouth explain the patterns, and recommendations include a pre-season practice visit and honest expectations at the sale.

Where the MKT 620 Module 8 rubric puts the points

Post-purchase assignments in MKT 620 are typically graded on use of evidence about consumers after purchase, application of satisfaction and dissonance concepts, analysis of complaints and word of mouth, practical recommendations and research and writing. Strong submissions present survey or complaint data, explain satisfaction as the result of expectations and experience and show how post-purchase behavior affects future buyers. Submissions lose credit for assuming satisfied customers will repurchase products bought once in a lifetime, ignoring complaints, describing dissonance without evidence that it occurs or recommending a generic loyalty program. Linking post-purchase actions to the word-of-mouth findings from earlier milestones strengthens the paper, since it shows the company why the period after the sale pays for itself.

MKT 620 Module 8 help: the mistakes that cost points

Gather evidence about consumers after they buy: surveys, reviews, warranty claims, complaints or interviews. Measure satisfaction and look at what predicts it, especially the gap between what consumers expected and what they experienced. Look for signs of doubt or regret and when they occur. Analyze complaints by type, since a few small faults often drive most of them. For products bought once, treat recommendation as the main form of loyalty. Then recommend specific actions after the sale, such as setting accurate expectations, follow-up contact or easy ways to share experiences. Tie each recommendation to a finding, and say how the company will know within a year whether it worked.

Get MKT 620 Module 8 written to your instructions

Share the MKT 620 Module 8 guidelines and what you know about your customers after they buy. We analyze satisfaction, doubt, complaints and word of mouth with your evidence and satisfaction research, and recommend what the company should do after the sale. There is no fee for your first post-purchase paper, usually finished in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 620 papers and related MS in Marketing samples

MKT 620 Module 8 questions, answered

Where can I find a free MKT 620 Module 8 post-purchase behavior sample?

This page carries the complete MKT 620 Module 8 assignment on satisfaction, doubt, complaints and word of mouth among tornado safe room owners.

What determines customer satisfaction?

Research finds satisfaction depends largely on how performance compares with expectations, along with perceived performance itself, feelings during use and a sense of fairness.

What is cognitive dissonance after a purchase?

Doubt or discomfort after buying, often when the purchase was costly or its value is uncertain, which consumers try to resolve by seeking reassurance.

How does loyalty work for products bought only once?

It shows up mainly as recommendations, reviews and referrals rather than repeat purchases, which makes post-purchase experience important for future sales.

How can companies reduce post-purchase doubt?

By setting accurate expectations at the sale, following up after delivery, helping customers use the product and giving them reasons and ways to share their experience.