| Course | PHE 101 Fundamentals of Public Health |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate short paper on a historical public health campaign |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Public Health |
| Updated | October 2026 |
Free sample paper for PHE 101 Module 2
Shoes, Privies and Schoolhouses: What the Southern Hookworm Campaign Teaches Rural Public Health
[Student Name]
Southern New Hampshire University
PHE 101: Fundamentals of Public Health
Module Two Short Paper
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Shoes, Privies and Schoolhouses: What the Southern Hookworm Campaign Teaches Rural Public Health
Early in the twentieth century, millions of people in the rural American South carried a parasite that left them pale, tired and slow to learn. Between 1909 and 1914, a philanthropic commission set out to remove it. The campaign against hookworm is one of the clearest early examples of organized public health in the United States, and its methods, mistakes and results still speak to rural communities today. This paper describes the disease, the campaign and its results, then draws lessons for a county health department in rural Kansas confronting a very different problem, deaths in grain bins.
The Disease
Hookworm larvae live in soil contaminated by human waste and enter the body through bare skin, usually the feet. In the adult form the worms attach to the intestine and feed on blood. Heavy infection causes anemia, fatigue and, in children, slowed growth and poor school performance. In the rural South of 1900, the conditions for spread were nearly perfect: warm sandy soil, few sanitary privies and children who went barefoot most of the year. Because the illness made people listless rather than acutely sick, outsiders often mistook it for a moral failing.
The Campaign
In 1909, John D. Rockefeller funded the Rockefeller Sanitary Commission for the Eradication of Hookworm Disease, with a budget of one million dollars over five years. Ettling (1981) describes how the commission worked through state boards of health rather than around them, sending physicians and inspectors to rural counties. Its approach had three parts. Traveling dispensaries examined and treated people for free, often on market days in county seats, drawing large crowds. Sanitary inspectors surveyed homes and schools and urged the building of privies that kept waste out of the soil. And the commission worked through teachers, ministers and newspapers to explain how the worm spread and to persuade families to be tested. Treatment was quick, but reinfection was certain without privies and shoes, so the campaign tied cure to changes in the environment.
Stigma
The campaign had a problem with words. Newspapers in the North dubbed hookworm the germ of laziness, implying that Southern poverty was the product of a parasite and, by extension, that Southerners were lazy. Ettling (1981) shows that many Southerners resented the label and the suggestion that outsiders had come to fix them, and that the commission had to work hard to present the campaign as a partnership with Southern institutions. The lesson was that a public health message can be accurate about a cause and still insult the people it is meant to help.
Results
The commission's own surveys found very high infection rates in many counties and reported large numbers of people examined and treated. More striking evidence came much later. Bleakley (2007), an economist, compared Southern areas with high and low hookworm infection before the campaign and found that areas with more infection saw larger gains in school enrollment, attendance and literacy after it, and that children who grew up after the campaign earned more as adults. The study suggests the campaign's benefits reached well beyond health into education and income. The campaign also left an institutional legacy: the county-level work it funded helped establish the idea of full-time local health departments, which spread across the South in the following decades.
The Campaign Through a Modern Lens
Read through a framework developed a century later, the campaign looks remarkably modern. Frieden (2010) arranges public health interventions in a five-level pyramid. At the base are changes to socioeconomic conditions, followed by reshaping surroundings so that the healthy option happens without effort, then one-time clinical protections, ongoing clinical care and, on the smallest top tier, one-on-one counsel and classes. The lower the tier, the wider the reach and the less any single person has to do. The hookworm campaign worked at three levels at once. Its dispensaries delivered clinical treatment. Its lectures and school talks sat at the top, as education. And its privy building sat near the base, changing the environment so that a family did not have to remember anything to avoid reinfection once a sanitary privy was in use.
The pyramid also helps explain the campaign's limits. The commission could not change the poverty that left families without shoes or the money to build privies, which sit at the very base. Where privy building lagged, reinfection followed treatment within a season. The campaign's success was therefore greatest where its environmental work took hold, and its shortfall lay in the level it could not reach.
Lessons for Prairie Bend County
Grain bin entrapment is a world away from hookworm, but three lessons carry over. First, cure without changing conditions does not last. The commission learned that treating people without building privies only delayed reinfection; for grain bins, rescue training without changes that keep people out of bins treats the last step of a preventable chain. Second, work through trusted local institutions. The commission succeeded where it partnered with teachers and churches; in Prairie Bend, that means grain cooperatives, the county extension office, FFA chapters and volunteer fire departments. Third, choose words carefully. Calling entrapment a result of carelessness, as some local talk does, would repeat the germ of laziness mistake by blaming people for working under real pressure at harvest. Messages should respect the farmers they hope to protect.
A fourth, quieter lesson concerns evidence. The commission counted people treated, but the most persuasive evidence of its value arrived decades later from researchers outside public health. A county effort on grain bins should decide at the start what it will count, such as entries made from outside bins or rescue tubes in place, so that its value can be judged sooner.
Conclusion
The hookworm campaign combined treatment, environmental change and local partnership, stumbled over stigma and produced benefits that economists could still measure a century later. For a rural health department today, its example is a reminder that public health works best when it changes conditions, works through people's own institutions and speaks to them with respect.
References
Bleakley, H. (2007). Disease and development: Evidence from hookworm eradication in the American South. Quarterly Journal of Economics, 122(1), 73-117. https://doi.org/10.1162/qjec.121.1.73
Ettling, J. (1981). The germ of laziness: Rockefeller philanthropy and public health in the New South. Harvard University Press.
Frieden, T. R. (2010). A framework for public health action: The health impact pyramid. American Journal of Public Health, 100(4), 590-595. https://doi.org/10.2105/AJPH.2009.185652
What the PHE 101 Module 2 instructions ask for
For Module Two, PHE 101 asks for a short paper on a moment in public health history and what it teaches. Three to four pages in APA 7 is typical. Choose an event, campaign or achievement and describe the health problem, the conditions that caused it, what was done and by whom. Include the difficulties and mistakes, not only the successes, such as resistance, stigma or unequal reach. Report results with evidence, ideally including later research that judged the long-term effects. Then draw two or three lessons for current public health practice, applied to a specific present-day problem in your community or the course case, and close with what the history adds to understanding the field. Accuracy with names and dates matters.
How this PHE 101 Module 2 history short paper example is built
Prairie Bend County's student studies the Rockefeller Sanitary Commission's hookworm work from 1909 to 1914. The parasite's spread through bare feet and missing privies explains the campaign's three parts, free dispensaries, privy building and work through teachers and churches, described from Ettling's history. The germ of laziness label shows how an accurate message can still insult. Bleakley's economic study finds larger gains in schooling and later earnings where infection had been heaviest. The PHE 101 paper draws three lessons for grain bin deaths: change conditions rather than only rescuing, work through cooperatives, extension and fire departments, and avoid calling harvest-pressure deaths carelessness. The past informs present choices.
Where the PHE 101 Module 2 rubric puts the points
Graders of the PHE 101 history paper generally reward an accurate account of the problem and its causes, a clear description of the response and its actors, attention to failures and controversies, evidence about results including long-term effects, lessons that genuinely connect to a present problem and correct APA 7 citations of historical and research sources. Papers that stand out avoid treating history as a story of heroes and show why methods worked or failed. Graders value specific application over general statements that history teaches us much. Clear organization, readable prose and accurate dates and names round out the strongest submissions. Precise dates help.
PHE 101 Module 2 help: the mistakes that cost points
History papers in this course lose marks by retelling events without analysis, celebrating a campaign without noting its problems, drawing lessons too vague to apply or citing only general websites. Some also get dates or names wrong, which graders notice. If your prompt names a different event, such as the 1854 cholera investigation, smallpox eradication, the polio vaccine trials or tobacco control, send it with your present-day problem and the paper will connect the two. Library database access helps us find primary and scholarly sources. Our PHE 101 history papers judge what worked and what failed and apply each lesson to a current problem. Exact dates matter.
Get PHE 101 Module 2 written to your instructions
Send the PHE 101 Module 2 prompt, the historical event you are studying and a present-day problem you want to connect it to. The paper will describe the problem, response and results with scholarly sources, address mistakes as well as successes and draw specific lessons for today, delivered in 24 to 48 hours, free for a first order. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PHE 101 papers and related BS Public Health samples
- PHE 101 Module 1 Discussion: What Makes This a Public Health Problem
- PHE 101 Module 3 Essential Services Short Paper: A County Health Department's Ten Jobs
- PHE 101 Module 4 Discussion: Rules, Liberty and the Family Farm
- PHE 101 Module 5 Project One: Analyzing Grain Bin Deaths as a Public Health Problem
- PHE 101 Module 6 Determinants Short Paper: Why the Risk Falls Where It Does
- PHE 101 Module 7 Project Two: A Layered Plan to Prevent Entrapment
- PHE 101 Module 8 Discussion: Closing Reflection on the Values of Public Health
PHE 101 Module 2 questions, answered
Where can I find a free PHE 101 Module 2 History Short Paper sample?
The complete PHE 101 Module 2 paper is on this page, examining the Southern hookworm campaign of 1909 to 1914 and drawing three lessons for rural public health today.
What was the Rockefeller Sanitary Commission?
A philanthropic commission founded in 1909 to eliminate hookworm in the American South through free treatment, sanitary privies and education through local institutions.
Did the hookworm campaign have lasting effects?
An economic study found that areas with heavier infection before the campaign saw larger later gains in school enrollment, attendance, literacy and adult earnings.
What was the germ of laziness?
A popular label for hookworm that implied Southern poverty and listlessness came from a parasite and was resented as a slur on Southerners.
How should a public health history paper end?
With specific lessons applied to a present-day problem, showing how historical methods or mistakes inform current practice.