| Course | PSY 324 Cross-Cultural Psychology |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post reflecting on the writer's own cultural background and assumptions, how the course changed them and how cultural humility will shape future work |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 324 Module 8
Module Eight Discussion
What I Thought Was Just Normal
My hometown is a farming town in western Kentucky, in a family that valued independence and plain speaking. My parents expected me to make my own decisions by sixteen, to say what I felt and to move out after high school. I took all of that as simply how people are. Working at Lantern Bridge Family Center this term, alongside a course on cross-cultural psychology, showed me how much of it was my culture.
I assumed that a good teenager pulls away from parents, until our teens described growing into more family responsibility. I assumed that people who are worried look worried, until a mother's polite smile at an intake turned out to hide weeks of fear. I assumed counseling was the obvious answer to distress, until I learned how many parents describe distress as headaches or thinking too much and hear counseling as a label for madness. And I assumed strict parents were cold, until I read how strictness can express devotion and training.
Each assumption came from somewhere specific, and each was supported by psychology I had learned in earlier courses. Henrich et al. (2010) showed that much of that psychology rests on samples from societies like mine, which helps explain why it felt universal to me.
The risk now is that I replace my old assumptions with new facts about other groups. Tervalon and Murray-Garcia (1998) distinguished cultural humility, an ongoing practice of self-reflection, openness and attention to power, from competence understood as mastering knowledge about cultures. In research by Hook et al. (2013), clients who rated their counselors as culturally humble also rated the working relationship as stronger. That matters at the center, where staff hold power over services families need.
I will ask before I interpret, especially about how worried someone is. I will write down what families say, not what I think they feel. And I will ask families, at the end of each program cycle, what we got wrong.
Which assumption of your own did this course reveal, and where do you think you learned it?
References
Henrich, J., Heine, S. J., & Norenzayan, A. (2010). The weirdest people in the world? Behavioral and Brain Sciences, 33(2-3), 61-83. https://doi.org/10.1017/S0140525X0999152X
Hook, J. N., Davis, D. E., Owen, J., Worthington, E. L., Jr., & Utsey, S. O. (2013). Cultural humility: Measuring openness to culturally diverse clients. Journal of Counseling Psychology, 60(3), 353-366. https://doi.org/10.1037/a0032595
Tervalon, M., & Murray-Garcia, J. (1998). Cultural humility versus cultural competence: A critical distinction in defining physician training outcomes in multicultural education. Journal of Health Care for the Poor and Underserved, 9(2), 117-125. https://doi.org/10.1353/hpu.2010.0233
What the PSY 324 Module 8 instructions ask for
In the last PSY 324 discussion, students typically look at their own cultural background and at how the course reshaped their view of themselves and of other people, and on how they will apply it. Expect a personal reflection connected to course concepts. Strong posts name specific assumptions the writer held and where they came from, connect them to research rather than general statements, distinguish cultural humility from knowing facts about groups, avoid replacing old stereotypes with new ones and set concrete commitments for future work or life. They are honest about what remains uncertain. Replies should engage classmates' reflections thoughtfully and respectfully. Reflection should lead to specific actions with a time frame.
How this PSY 324 Module 8 discussion example is built
The closing post reflects on a term of cross-cultural psychology for a student at Lantern Bridge Family Center, a fictional Bowling Green, Kentucky nonprofit, who grew up in a small Kentucky town valuing independence and plain speaking. Four assumptions are named: good teens pull away from parents, worried people look worried, counseling is the obvious answer and strict parents are cold, each shaped by the writer's culture. Cultural humility is distinguished from knowing facts about groups, with research linking perceived humility to stronger working relationships and on psychology's narrow samples. Commitments include asking before interpreting, recording families' words and inviting feedback. Hook and colleagues, Tervalon and Murray-Garcia and Henrich and colleagues are cited. Commitments are specific. Classmates are invited to reflect.
Where the PSY 324 Module 8 rubric puts the points
For the closing PSY 324 thread, instructors typically credit specific assumptions named honestly, connections to course research, an accurate account of cultural humility, avoidance of new stereotypes, concrete commitments and respectful engagement with classmates. Posts gain credit when reflection leads to changes in behavior. They lose points for general statements of appreciation, for describing other cultures without examining one's own, for vague commitments or for no sources. Two APA citations and thoughtful replies complete the grade. Reflections that name where an assumption came from, such as family, school or media, earn more credit than those that only name the assumption. Honesty counts.
PSY 324 Module 8 help: the mistakes that cost points
Name two or three things you took for granted before the course, and ask where you learned them: family, town, school, media. Connect each to research from the course that showed it was cultural rather than universal. Explain what cultural humility asks of you, which is different from learning facts about other groups. Then commit to specific actions you can take at work, in school or in your community. Reflections often say the writer is more open-minded now; the stronger ones say exactly what the writer will do differently on Monday. Share your commitments with someone who will ask about them later. Then revisit them.
Get PSY 324 Module 8 written to your instructions
Paste the PSY 324 Module 8 prompt and share what the course changed for you. A writer reflects honestly on your cultural assumptions, connects them to course research, explains cultural humility and sets specific commitments, closing with a question that invites classmates to reflect, with APA sources. Your first PSY 324 post is free, usually in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 324 papers and related BA Psychology samples
- PSY 324 Module 1 Discussion: Whose Psychology Do the Textbooks Describe?
- PSY 324 Module 2 Self-Concept Assignment: The Self in a Youth Leadership Program
- PSY 324 Module 3 Milestone One: Teens and Parents Adjusting at Different Speeds
- PSY 324 Module 4 Discussion: A Smile Misread at Intake
- PSY 324 Module 5 Milestone Two: Distress Described in Other Words
- PSY 324 Module 6 Parenting Assignment: Parenting That Does Not Fit the Categories
- PSY 324 Module 7 Final Project: A Culturally Grounded Plan for the Center
- PSY 440 Module 6 Training Evaluation Assignment: Did the New Onboarding Work?
PSY 324 Module 8 questions, answered
Where can I find a free PSY 324 Module 8 Discussion sample?
The complete PSY 324 Module 8 reflection from a student at an invented Kentucky family center is on this page.
Why reflect on one's own culture in cross-cultural psychology?
Because assumptions learned in one's own culture often feel like human nature until compared with others.
What does cultural humility ask of practitioners?
Ongoing self-reflection, openness to others' perspectives, attention to power differences and partnership with the people served.
Can knowing facts about cultures lead to stereotyping?
Yes; facts about group tendencies can become assumptions about individuals if not paired with curiosity and humility.
How can students apply cultural humility in everyday work?
By asking before interpreting, recording what people say, inviting feedback and examining their own reactions.