PSY 440 Module 6 Training Evaluation Assignment Example

Reviewed by Gilbert Sorenby, PhD

This PSY 440 Module 6 Training Evaluation Assignment sample evaluates a training program at several criterion levels, compares results with a comparison group and interprets the evidence with attention to design limitations. SNHU PSY 440 (PSY-440) asks BA Psychology students to judge training by what changes, not by how much people liked it. The program is a new onboarding pilot for care aides at Wild Plum Senior Living, an invented Omaha operator. Early turnover fell sharply in the pilot communities, and the paper weighs how much of that the program can claim. Costs are weighed against savings. Limits are stated.

CoursePSY 440 Industrial Organizational Psychology Consulting and Analysis
ModuleModule 6
Paper typeundergraduate assignment evaluating a training program at several criterion levels, comparing results with a comparison group and interpreting the evidence with attention to design limitations
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBA Psychology
UpdatedOctober 2026

Free sample paper for PSY 440 Module 6

1

Did the New Onboarding Work? Evaluating the Wild Plum Care Aide Pilot

[Student Name]

Southern New Hampshire University

PSY 440: Industrial Organizational Psychology Consulting and Analysis

Training Evaluation Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingEvery person, place and number at Wild Plum in this PSY 440 evaluation is invented; the studies cited are published research.
2

Did the New Onboarding Work? Evaluating the Wild Plum Care Aide Pilot

Introduction

Based on the needs assessment and job analysis, Wild Plum Senior Living piloted a new onboarding program for resident care aides at its Elkhorn and Bellevue communities for six months. This paper evaluates whether the program worked, at four levels, comparing the pilot communities with their own past results and with two similar communities that kept the old onboarding.

What this page is doingStates the purpose.
3

The Program

Under the old approach, new aides shadowed a coworker for one day and then took a full assignment. Under the new program, new aides spend four days training in pairs on the critical tasks identified in the job analysis, safe transfers, call lights, dementia care and reporting changes in condition, with an experienced aide who has been trained as a peer mentor. The mentor checks in at least weekly for 90 days, works shifts with the new aide when possible and is paid a $300 stipend per mentee who stays 90 days.

What this page is doingDescribes what changed.
4

Evaluation Design

The evaluation compares 52 aides hired into the pilot communities during the six months, all of whom completed the new onboarding, with 49 aides hired into two comparison communities, Papillion and Benson, which are similar in size and resident mix, and with the pilot communities' own results in the previous year.

What this page is doingExplains the comparison.
5

Results at Four Levels

Evaluation results

LevelMeasurePilot communitiesComparison communities
ReactionsAverage rating of onboarding usefulness, 1 to 54.52.7
LearningSkills checklist passed on first attempt92%Not administered
BehaviorCharge nurse rating of safe, independent practice at 60 days, 1 to 53.93.2
Results90-day turnover of new aides31%55%
Results, baseline90-day turnover in pilot communities the previous year58%

The results are consistent across levels, which is itself a form of evidence: aides in the pilot found onboarding more useful, nearly all passed the skills checklist, charge nurses rated their practice higher at 60 days and fewer left within 90 days.

What this page is doingReports the evidence.
6

Interpreting the Results

Alliger et al. (1997) pooled training studies and found that trainee satisfaction barely tracks later learning or on-the-job change, so the high reaction ratings alone would not justify the program. Pooling training studies, Arthur et al. (2003) reported sizable effects of workplace training on what people learned, how they behaved on the job and organizational outcomes, with effects depending on the training's design and the match between training and evaluation. The pilot's evidence goes beyond reactions: learning was measured directly, behavior was rated by charge nurses who did not deliver the training and the results measure, 90-day turnover, is the outcome the organization cares about most.

Allen et al. (2010) argued that early socialization and support are among the most effective retention strategies. The mentor component, in which an experienced aide checks in and works alongside the new aide, directly addresses the isolation that exit interviews described.

What this page is doingApplies research on training criteria.
7

Design Limitations

Having comparison sites helps, yet this is still not a true experiment.

The pilot communities were not chosen at random. Elkhorn already had the lowest turnover in the company and a director of six years, so part of the difference may reflect leadership rather than the program. Bellevue, however, had higher turnover than the comparison communities before the pilot and still improved, which strengthens the case. Charge nurses who rated behavior knew which aides were in the pilot, which could bias ratings. And six months is a short period; some effects may fade once the program is routine and the first, most enthusiastic mentors move on. Seasonal hiring patterns also differ, since many aides are hired in late spring when students look for work, and the pilot months may not represent a full year.

What this page is doingStates what the evidence cannot show.
8

What Aides Said About the Program

Short interviews with 14 aides in the pilot added detail the numbers could not. New aides most often credited the mentor, especially in the first two weeks, with knowing whom to ask and feeling less alone on a hard shift. Mentors said the stipend mattered less than being asked to help, and several said mentoring made them more likely to stay themselves. Two aides said the four days felt long before they had met any residents, a point for redesign. These comments suggest that the mentor relationship, rather than the extra classroom time, may carry much of the program's effect.

What this page is doingAdds qualitative evidence.
9

Costs and Benefits

Costs were tracked from the start of the pilot. The program cost about $1,240 per new aide, most of it paid training time: three extra days of paid training, mentor stipends and mentor training. In the pilot communities, 90-day turnover fell from 58 to 31 percent, about 14 fewer early departures among 52 hires. At about $3,800 per departure, that saved roughly $53,000 against program costs of about $64,000 for the six months. Because turnover after 90 days is low, aides who stay longer produce further savings beyond the evaluation period, and the program likely breaks even within a year.

What this page is doingEstimates return.
10

Recommendation

The evidence supports expanding the program to all six communities, starting with Council Bluffs and La Vista, which have the highest early turnover and the most to gain, with continued measurement at all four levels, random assignment of the next two communities to start dates if possible and charge nurse ratings collected without knowledge of which aides were in the program. The selection system and the onboarding program should be evaluated together, since both target early turnover, and the evaluation should separate their effects by comparing communities that adopt them at different times.

What this page is doingDecides next steps.
11

Conclusion

The new onboarding program was rated highly, taught critical skills, improved charge nurses' ratings of new aides' practice and was associated with a drop in 90-day turnover from 58 to 31 percent, against 55 percent in comparison communities. Design limits, especially non-random selection of pilot sites, mean the program cannot claim all of that improvement, but the evidence across levels and the likely return justify expanding it with stronger evaluation. The next rollout should assign communities by a fair draw and track every hire for a full year, so Wild Plum's leaders can see how much of the gain is the program itself.

What this page is doingSummarizes the evaluation.
12

References

Allen, D. G., Bryant, P. C., & Vardaman, J. M. (2010). Retaining talent: Replacing misconceptions with evidence-based strategies. Academy of Management Perspectives, 24(2), 48-64. https://doi.org/10.5465/amp.2010.51827775

Alliger, G. M., Tannenbaum, S. I., Bennett, W., Jr., Traver, H., & Shotland, A. (1997). A meta-analysis of the relations among training criteria. Personnel Psychology, 50(2), 341-358. https://doi.org/10.1111/j.1744-6570.1997.tb00911.x

Arthur, W., Jr., Bennett, W., Jr., Edens, P. S., & Bell, S. T. (2003). Effectiveness of training in organizations: A meta-analysis of design and evaluation features. Journal of Applied Psychology, 88(2), 234-245. https://doi.org/10.1037/0021-9010.88.2.234

What the PSY 440 Module 6 instructions ask for

The PSY 440 training evaluation assignment generally asks students to design or conduct an evaluation of a training program, often using multiple levels of criteria such as reactions, learning, behavior and results. Expect to describe the program, the evaluation design, the data and conclusions. Strong papers measure more than reactions, compare outcomes with a baseline or comparison group, use research on how different criteria relate, interpret results cautiously given the design, estimate costs and benefits and make recommendations about continuing or changing the program. They are clear about what the evidence can and cannot show. Tables should present each level's results side by side so readers can compare them.

How this PSY 440 Module 6 training evaluation assignment example is built

The assignment evaluates a new onboarding program piloted at two Wild Plum Senior Living communities, a fictional operator around Omaha: four days of paired training on critical tasks and a 90-day peer mentor replaced one day of shadowing. Reactions averaged 4.5 of 5, 92 percent passed a skills checklist first time, charge nurses observed behavior at 30 and 60 days and 90-day turnover was 31 percent against 58 percent before and 55 percent in comparison communities. Research showing reactions relate weakly to other outcomes, design limits such as non-random assignment and a long-serving director and cost against savings are discussed. Expansion with continued measurement is recommended. Two training meta-analyses and a retention review support the analysis. Limits are named plainly.

Where the PSY 440 Module 6 rubric puts the points

The PSY 440 training evaluation rubric typically credits measurement at several criterion levels, a meaningful comparison, interpretation grounded in research on training criteria, honest treatment of design limitations, a cost-benefit estimate and recommendations that follow from the evidence. Papers stand out when they explain how confident a reader should be in the results. They lose points for relying on satisfaction ratings, for claiming the program caused changes without a comparison, for ignoring confounds or for no cost analysis. Tables and APA references are expected, and a half-page summary for the people deciding about the program helps. Honest notes on bias in the ratings add credit.

PSY 440 Module 6 help: the mistakes that cost points

Describe what the program changed compared with what came before. Gather evidence at each level: trainee opinions, skills shown at the end of training, on-the-job practice weeks later and the outcomes leaders track. Compare with a baseline and, if possible, with similar units that did not get the program. Ask what else could explain the results. Estimate costs and savings. Then decide whether to continue, change or expand the program. Papers often report that trainees loved the training; the stronger ones show whether anything else changed. Then decide what you would measure differently next time and say why it would make the evidence stronger. Report it plainly.

Get PSY 440 Module 6 written to your instructions

Share the PSY 440 Module 6 instructions and your training program and data. A writer evaluates it at reaction, learning, behavior and results levels, compares with a baseline or comparison group, interprets the evidence with research on training criteria, weighs costs and benefits and states the design's limits, with tables and APA references. We write your first PSY 440 assignment free, typically within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More PSY 440 papers and related BA Psychology samples

PSY 440 Module 6 questions, answered

Where can I find a free PSY 440 Module 6 training evaluation sample?

The complete PSY 440 Module 6 evaluation of a care aide onboarding pilot at an invented Omaha employer is on this page.

What are the levels of training evaluation?

Trainee opinions, what was learned, what changed at work and what changed for the organization, each needing its own measure.

Do positive trainee reactions mean training worked?

Not necessarily; research finds reactions are only weakly related to learning, behavior and results.

Why use a comparison group in training evaluation?

To separate the program's effects from other changes happening at the same time, such as new leaders or seasonal patterns.

How is the return on a training program estimated?

By comparing the program's costs with the value of improvements it produces, such as reduced turnover costs.