PSY 440 Module 7 Final Project Example

Reviewed by Gilbert Sorenby, PhD

This PSY 440 Module 7 Final Project sample presents a complete I-O psychology consulting report with diagnosis, job analysis, interventions, evaluation evidence, costs, an implementation plan and limitations. SNHU PSY 440 (PSY-440) ends the BA Psychology course on consulting with the report a client would actually receive. The client is Wild Plum Senior Living, an invented Omaha operator losing two-thirds of its care aides every year. The report shows that hiring was only one part of the problem and recommends changes across the first 90 days of an aide's job. Every recommendation comes with a cost, an owner and a measure.

CoursePSY 440 Industrial Organizational Psychology Consulting and Analysis
ModuleModule 7
Paper typeundergraduate final project presenting a complete I-O psychology consulting report with diagnosis, job analysis, interventions, evaluation evidence, costs, an implementation plan and limitations
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBA Psychology
UpdatedOctober 2026

Free sample paper for PSY 440 Module 7

1

Keeping Care Aides Past Day 90: A Consulting Report for Wild Plum Senior Living

[Student Name]

Southern New Hampshire University

PSY 440: Industrial Organizational Psychology Consulting and Analysis

Final Project

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe company, communities, aides and figures in this PSY 440 report are all fictional, while every study cited is published.
2

Keeping Care Aides Past Day 90: A Consulting Report for Wild Plum Senior Living

Executive Summary

Wild Plum Senior Living loses about 68 percent of its 410 resident care aides each year, about 279 people, at a cost of roughly $1.06 million, and 61 percent of those who leave do so within 90 days. Aides like the residents; they leave because of unpredictable scheduling and mandatory double shifts, little support in their first weeks, uneven supervision and pay below local hospitals. Hiring is part of the problem but not the whole of it. We recommend three linked changes: a new selection system with a realistic job preview and structured interviews, the onboarding and peer mentor program already piloted, and changes to supervision and scheduling, including a float pool and a wage review. Together they cost about $410,000 a year and, if early turnover falls by half, would save more than they cost within the first year.

What this page is doingSummarizes the report.
3

The Problem

Combining personnel files, the reasons departing aides gave and answers from 236 current aides, we found that quits concentrate in the first three months and vary sharply by community, from 41 percent at Elkhorn, which has a stable director and a buddy system, to 92 percent at Council Bluffs, which has had three directors in two years. Aides rated their first weeks, scheduling and pay poorly and their residents highly. These patterns match research: Griffeth et al. (2000) found turnover predicted by satisfaction, commitment, supervisor relationships and alternatives, and Castle and Engberg (2006) linked staff turnover in long-term care to organizational characteristics such as leadership stability. The organizational performance model of Burke and Litwin (1992) reminds us that leadership and management practices shape the climate that drives retention.

What this page is doingSummarizes the diagnosis.
4

The Job

Watching shifts, talking with aides and nurses and surveying 84 veterans told us what the work most depends on: safe transfers, personal care with dignity, noticing changes in residents, patience under stress, stamina and dependability. It also showed how much the written job description leaves unsaid: nothing about caring for frightened or agitated residents with dementia, nothing about running a unit one aide short and nothing about losing residents aides have grown close to.

What this page is doingSummarizes the job analysis.
5

Recommendation One: Selection

Applicants will first see the work as it is, through a brief film and a paid half-shift alongside an aide; research finds previews modestly improve retention by aligning expectations (Premack & Wanous, 1985). A structured interview of eight questions tied to the job analysis, scored on anchored scales by two trained interviewers, will replace unstructured conversations; structured interviews are more reliable and valid (Campion et al., 1997). Selection rates will be monitored by group to check fairness.

What this page is doingHires with open eyes.
6

Recommendation Two: Onboarding and Mentoring

At Elkhorn and Bellevue, where new aides got four days of paired training and a mentor for three months, early quits fell to roughly three in ten from nearly six in ten, while the two communities without the program stayed above half; charge nurses also rated the new aides as safer and more independent. Evaluation at several levels was important, since reactions alone say little (Arthur et al., 2003). Allen et al. (2010) identify early socialization and support as among the most effective retention strategies. We recommend expanding the program to all six communities.

What this page is doingSupports the first 90 days.
7

Recommendation Three: Supervision, Scheduling and Pay

Charge nurses and directors will receive training in supportive supervision and in using the new onboarding. A float pool of eight aides shared across communities will cover call-outs, reducing mandatory doubles. Wild Plum should review starting pay against local hospitals; closing half the $2.25 an hour gap would cost about $1 million a year across all aides, so we recommend a $600 retention bonus for every aide who completes 90 days, which rewards staying at the point where most departures happen.

What this page is doingAddresses what drives aides away.
8

Costs and Benefits

Annual costs and projected savings

ItemAnnual cost
Selection system, preview shifts and interviewer time$45,000
Onboarding and mentor program, all communities$160,000
Supervisor training$25,000
Float pool, net of overtime saved$60,000
Retention bonus at 90 days, about 200 aides a year$120,000
TotalAbout $410,000
Projected savings if early turnover halves, about 85 fewer departures at $3,800About $323,000
Additional savings from lower overtime and longer tenureAbout $150,000
What this page is doingEstimates the return.
9

Implementation Plan

Twelve-month plan

MonthsActionOwner
1-2Expand onboarding and mentors to all communitiesDirector of nursing
1-3Build and train for structured interviews; film the previewHuman resources director
2-4Supervisor training; launch float poolChief operating officer
4Introduce the 90-day retention bonusChief operating officer and finance
6Midpoint review of measuresConsulting team with leadership
12Full evaluation and decision on next stepsLeadership
What this page is doingSets timing and owners.
10

One System, Not Three Fixes

We designed these changes to work as a set. Selection with a realistic preview reduces the number of aides who arrive with the wrong picture of the job. Onboarding and mentoring support those who arrive through the hardest weeks. Supervision, scheduling and the retention bonus address the conditions that push even well-chosen, well-trained aides out. Adopting only one would leave the others' causes in place; adopting all three gives each a better chance of working.

What this page is doingExplains the logic.
11

Measures

Wild Plum will track 90-day and annual turnover by community, survey ratings of onboarding, scheduling and supervision, mandatory double shifts per month, interviewer agreement and selection rates by group, reported quarterly.

What this page is doingDefines how success will be judged.
12

Ethics and Confidentiality

Survey answers stayed confidential, and no breakdown smaller than eight people appeared anywhere. When one director asked to identify critical respondents, we declined and reminded leadership of the agreement made at the outset, consistent with professional ethical standards.

What this page is doingExplains protections.
13

Limitations

Elkhorn and Bellevue were picked rather than drawn at random, and Elkhorn has the company's most experienced director, so the onboarding results may overstate the program's effect. The survey reached 58 percent of aides. Cost estimates rely on averages. The effects of pay changes are projected, not measured.

What this page is doingStates the limits.
14

Conclusion

Wild Plum's turnover problem is concentrated in the first 90 days and driven by how the job is introduced, supported, scheduled and paid as much as by whom it hires. Hiring with a realistic preview and structured interviews, supporting new aides with paired training and mentors and addressing supervision, scheduling and pay together can cut early turnover, steady care for residents and pay for themselves within a year.

What this page is doingCloses the report.
15

References

Allen, D. G., Bryant, P. C., & Vardaman, J. M. (2010). Retaining talent: Replacing misconceptions with evidence-based strategies. Academy of Management Perspectives, 24(2), 48-64. https://doi.org/10.5465/amp.2010.51827775

Arthur, W., Jr., Bennett, W., Jr., Edens, P. S., & Bell, S. T. (2003). Effectiveness of training in organizations: A meta-analysis of design and evaluation features. Journal of Applied Psychology, 88(2), 234-245. https://doi.org/10.1037/0021-9010.88.2.234

Burke, W. W., & Litwin, G. H. (1992). A causal model of organizational performance and change. Journal of Management, 18(3), 523-545. https://doi.org/10.1177/014920639201800306

Campion, M. A., Palmer, D. K., & Campion, J. E. (1997). A review of structure in the selection interview. Personnel Psychology, 50(3), 655-702. https://doi.org/10.1111/j.1744-6570.1997.tb00709.x

Castle, N. G., & Engberg, J. (2006). Organizational characteristics associated with staff turnover in nursing homes. The Gerontologist, 46(1), 62-73. https://doi.org/10.1093/geront/46.1.62

Griffeth, R. W., Hom, P. W., & Gaertner, S. (2000). A meta-analysis of antecedents and correlates of employee turnover: Update, moderator tests, and research implications for the next millennium. Journal of Management, 26(3), 463-488. https://doi.org/10.1177/014920630002600305

Premack, S. L., & Wanous, J. P. (1985). A meta-analysis of realistic job preview experiments. Journal of Applied Psychology, 70(4), 706-719. https://doi.org/10.1037/0021-9010.70.4.706

What the PSY 440 Module 7 instructions ask for

For the PSY 440 final project, students generally prepare a consulting report for an organization, integrating the diagnosis, job analysis and interventions developed in earlier milestones into recommendations the client can act on. Expect an executive summary, findings, recommendations, an implementation plan and an evaluation plan. Strong reports are written for the client's leaders, lead with the most important findings, link every recommendation to evidence, estimate costs and benefits, assign owners and timelines, define measures, address ethics such as confidentiality and state limitations plainly. They weave the milestone work into a single case for action instead of repeating each piece. Each recommendation should state what evidence supports it and what it will cost.

How this PSY 440 Module 7 final project example is built

The final project presents the consulting report for Wild Plum Senior Living, a fictional operator of six communities around Omaha losing about 68 percent of its 410 care aides a year at about $1.06 million. The diagnosis finds 61 percent of departures within 90 days, driven by scheduling, early support, supervision and pay as well as hiring; the job analysis found the description omitted dementia care's demands. Three interventions follow: selection with a realistic preview and structured interviews, the onboarding and mentor program that cut 90-day turnover from 58 to 31 percent in its pilot and supervisor, float pool and wage changes. Costs of about $410,000, a 12-month plan, measures and limitations are presented. Griffeth and colleagues, Castle and Engberg and five other sources are cited.

Where the PSY 440 Module 7 rubric puts the points

Grading of the PSY 440 report looks for a strong opening summary, findings grounded in data, recommendations linked to evidence, costs and benefits, a realistic implementation plan with owners, defined measures, attention to ethics and honest limitations, all written for the client. Reports score highest when a leader could approve the plan after reading the summary. They lose points for milestones pasted together, for recommendations without evidence or costs, for jargon the client would not understand or for no evaluation plan. Tables, APA references and professional formatting complete the grade. A summary page a leader could approve from earns extra credit. Plain language helps.

PSY 440 Module 7 help: the mistakes that cost points

Write the executive summary for a busy leader: the problem, its cost, what causes it and what to do. Then lay out the evidence briefly, linking each finding to the data behind it. Present each recommendation with its rationale, cost, owner and timeline. Add a plan for measuring results and a frank section on what the analysis could not show. Keep the language plain. Reports often present everything the team learned; the stronger ones choose what the client most needs to know and act on. Then ask someone outside the project to read the summary and tell you what they would do.

Get PSY 440 Module 7 written to your instructions

Send the PSY 440 Module 7 instructions with your milestone drafts. A writer combines them into a single client-ready report with an executive summary, diagnosis, job analysis, interventions, evaluation evidence, costs, an implementation plan, measures and limitations, written for the client and supported with APA references. Your first PSY 440 final project is free and normally takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More PSY 440 papers and related BA Psychology samples

PSY 440 Module 7 questions, answered

Where can I find a free PSY 440 Module 7 final project sample?

This page holds the complete PSY 440 consulting report on care aide turnover for an invented Omaha senior living operator.

What should an I-O consulting report include?

An executive summary, diagnosis, findings, recommendations with costs and owners, an implementation plan, measures and limitations.

Why lead with an executive summary?

Leaders often decide based on the first page, so the summary must state the problem, cost, causes and recommended actions.

How should consultants handle confidential data in a report?

Report results only at levels that protect individuals and explain how confidentiality was maintained.

Why include limitations in a consulting report?

So the client understands how confident to be in the findings and where to keep measuring.