| Course | PSY 440 Industrial Organizational Psychology Consulting and Analysis |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment conducting an organizational needs assessment with records, exit interviews and an employee survey, diagnosing where and why a problem occurs and estimating its cost |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 440 Module 2
Diagnosing the Turnover Problem at Wild Plum Senior Living
[Student Name]
Southern New Hampshire University
PSY 440: Industrial Organizational Psychology Consulting and Analysis
Needs Assessment Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Diagnosing the Turnover Problem at Wild Plum Senior Living
Introduction
Wild Plum Senior Living asked our consulting team to fix its hiring. In the contracting meeting we agreed to diagnose the underlying problem, early turnover of resident care aides, before recommending anything. This paper reports the needs assessment: turnover records, exit interviews and a survey of current aides, analyzed by tenure and by community, interpreted with research and costed.
Data Sources
We used three sources, chosen so that what people said could be checked against what the records showed. Turnover records for the past two years showed every aide departure with hire date, community and reason code. Exit interview notes, collected by human resources for 214 departures, gave reasons in the aides' words. And a confidential online survey of current aides, answered by 236 of 410, a 58 percent response rate, measured satisfaction with pay, scheduling, workload, supervision, training and coworkers.
Where and When Aides Leave
Turnover by community, past year
| Community | Aides | Departures | Annual turnover | Director tenure |
|---|---|---|---|---|
| Elkhorn | 72 | 30 | 41% | 6 years |
| Papillion | 68 | 39 | 57% | 4 years |
| Bellevue | 70 | 46 | 66% | 2 years |
| Benson | 66 | 47 | 71% | 1 year |
| La Vista | 68 | 56 | 82% | 1 year |
| Council Bluffs | 66 | 61 | 92% | 3 directors in 2 years |
| Total | 410 | 279 | 68% |
The timing is striking: 61 percent of departures happened within 90 days of hire, and another 18 percent within the first year. Aides who stay past a year rarely leave. Departures also cluster by shift: aides hired onto evening and night shifts, which are harder to staff, left at higher rates than day-shift aides, and the reason codes in the records most often read personal or no call, no show, which tells us little. That is why the interviews and survey matter: the records show when aides leave, but not why.
Why Aides Leave
Exit interviews and survey responses point to four themes. Staffing and scheduling came first: aides described being asked to work double shifts when coworkers called out, often with little notice. Early support came second: many new aides said they were shown the floor for one day and then left alone with a full assignment. Treatment by charge nurses and supervisors came third, especially at communities with frequent director turnover. Pay came fourth: Wild Plum starts aides at $17.25 an hour, while local hospitals pay certified nursing assistants about $19.50.
Survey satisfaction, current aides, scale of 1 to 5
| Item | Average |
|---|---|
| My first weeks prepared me for the job | 2.4 |
| Schedules are fair and predictable | 2.6 |
| My supervisor treats me with respect | 3.1 |
| My pay is fair for the work | 2.5 |
| I like the residents I care for | 4.4 |
The last row matters, and it is one of the most useful findings in the assessment. Aides like the work itself; they leave because of how the work is organized and supported. Open comments made the same point in plain words. One aide wrote that caring for residents was the best part of the job but that three double shifts a week left no time for the aide's own children. Another described being alone with a full assignment on the first day when a resident fell, without ever having been shown what to do. These comments matter because they show what an intervention would have to change for aides who already like the work to stay.
Interpreting the Findings
Griffeth et al. (2000) found in their meta-analysis that turnover is predicted by job satisfaction, organizational commitment, supervisor relationships and the availability of alternatives, among other factors. Each appears here: dissatisfaction with scheduling and pay, weak attachment in the first weeks, uneven supervision and nearby hospital jobs paying more. Castle and Engberg (2006) studied nursing homes and found that organizational characteristics, including leadership stability and staffing levels, were associated with staff turnover. The pattern across Wild Plum's communities fits: Elkhorn, with a director of six years and a buddy system pairing new aides with experienced ones, has the lowest turnover, while Council Bluffs, with three directors in two years, has the highest. Burke and Litwin (1992) remind us that leadership and management practices shape work climate and motivation, which in turn shape outcomes such as retention.
The Cost
Estimated cost per departure
| Cost | Amount |
|---|---|
| Recruiting and background checks | $650 |
| Paid orientation, 40 hours | $690 |
| Overtime to cover vacancies | $1,900 |
| Supervisor and trainer time | $560 |
| Total per departure | $3,800 |
At 279 departures a year, turnover costs Wild Plum about $1.06 million annually, before counting effects on residents' care and family satisfaction. Residents with dementia in particular depend on familiar caregivers, and families notice when faces change every few weeks. Those costs do not appear in the budget but bear on the company's reputation and occupancy.
Conclusions
Hiring is part of the problem: some aides are surprised by the physical and emotional demands of the job, and the current interview, a short conversation with whichever manager is available, does not tell applicants what they are getting into. But the evidence points equally to onboarding, supervision and scheduling, all within Wild Plum's control, and to pay, which the company can address at a cost. Because most departures happen in the first 90 days, interventions should focus on the period from recruitment through the first three months.
Limitations
The survey reached 58 percent of aides, and it is hard to know whether unhappy aides answered more or less often than satisfied ones. Exit interviews were conducted by human resources staff, which may have made aides reluctant to criticize supervisors. Aides who simply stopped coming to work, a large share of early departures, gave no exit interview at all, so the reasons recorded come mostly from those who left more formally. The survey captures aides who stayed, whose views may not match those of aides who quit. The cost estimate uses averages.
Conclusion
Wild Plum loses about 68 percent of its care aides each year, mostly within 90 days, at a cost of about $1.06 million. Aides like the residents but leave because of unpredictable scheduling, little early support, uneven supervision and pay below local hospitals, and the best-performing community shows what stable leadership and a buddy system can do. The next steps are a job analysis and interventions focused on the first months.
References
Burke, W. W., & Litwin, G. H. (1992). A causal model of organizational performance and change. Journal of Management, 18(3), 523-545. https://doi.org/10.1177/014920639201800306
Castle, N. G., & Engberg, J. (2006). Organizational characteristics associated with staff turnover in nursing homes. The Gerontologist, 46(1), 62-73. https://doi.org/10.1093/geront/46.1.62
Griffeth, R. W., Hom, P. W., & Gaertner, S. (2000). A meta-analysis of antecedents and correlates of employee turnover: Update, moderator tests, and research implications for the next millennium. Journal of Management, 26(3), 463-488. https://doi.org/10.1177/014920630002600305
What the PSY 440 Module 2 instructions ask for
The PSY 440 needs assessment assignment generally asks students to diagnose an organizational problem by gathering and analyzing data, often at the organizational, task and person levels, before recommending interventions. Expect to use multiple sources of evidence. Strong papers combine records with interviews or surveys, look for patterns by unit, tenure or role, compare high- and low-performing units, use research to interpret findings, estimate the cost of the problem and draw conclusions that sort causes into those within the organization's reach and those outside it. They note limitations such as response rates. The diagnosis should point clearly toward the interventions that follow. Show the comparison between units in a table.
How this PSY 440 Module 2 needs assessment assignment example is built
The assignment diagnoses turnover among Wild Plum Senior Living's 410 care aides, a fictional operator of six communities around Omaha. Records show about 279 departures a year, 61 percent within 90 days, and community rates from 41 to 93 percent. Exit interviews and a survey of 236 aides cite short staffing and mandatory doubles, little early support, treatment by charge nurses and supervisors and pay of $17.25 against $19.50 at hospitals. The lowest-turnover community has a stable director and buddy system; the highest has had three directors in two years. Turnover costs about $1.06 million a year, and causes span onboarding, supervision and scheduling. Griffeth and colleagues, Castle and Engberg and Burke and Litwin are cited.
Where the PSY 440 Module 2 rubric puts the points
Grading for the PSY 440 needs assessment typically rewards use of several data sources, patterns analyzed by unit and tenure, comparison of strong and weak units, interpretation grounded in research, a cost estimate, conclusions that separate changeable causes from others and honest limitations. Papers score highest when the diagnosis clearly predicts what interventions will be needed. They lose points for leaning on a single source, for listing complaints without analysis, for skipping cost or for jumping to solutions before the evidence. Tables and APA references are expected, with a plain summary leaders could read quickly. A cost estimate that leaders can check earns extra credit, as does a frank note on what the data cannot show.
PSY 440 Module 2 help: the mistakes that cost points
Gather records first: who leaves, when, from which unit. Then hear from people through exit interviews and a survey of those who stay. Look for patterns: does the problem cluster early in tenure, in certain units, under certain supervisors? Compare the best and worst units and ask what differs. Use research to interpret what you find. Estimate what the problem costs. Then say which causes the organization can change. Papers often summarize complaints; the stronger ones show where the problem concentrates and what that implies. Close by naming the two or three causes the organization can change first, and explain why those come before the others.
Get PSY 440 Module 2 written to your instructions
Share the PSY 440 Module 2 instructions and your organization's data. A writer designs and reports a needs assessment using records, interviews and surveys, finds where and why the problem occurs, compares units, estimates costs and draws conclusions that point toward interventions, with tables and APA references. The first PSY 440 assignment is free, typically within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 440 papers and related BA Psychology samples
- PSY 440 Module 1 Discussion: Who Is the Client?
- PSY 440 Module 3 Milestone One: Analyzing the Care Aide Job
- PSY 440 Module 4 Discussion: The Manager Who Wanted Names
- PSY 440 Module 5 Milestone Two: A Selection System with a Realistic Preview
- PSY 440 Module 6 Training Evaluation Assignment: Did the New Onboarding Work?
- PSY 440 Module 7 Final Project: The Consulting Report
- PSY 440 Module 8 Discussion: Presenting Hard Findings to Leadership
- PSY 324 Module 6 Parenting Assignment: Parenting That Does Not Fit the Categories
PSY 440 Module 2 questions, answered
Where can I find a free PSY 440 Module 2 needs assessment sample?
This page holds the complete PSY 440 Module 2 turnover diagnosis for an invented Omaha senior living operator.
What is a needs assessment in I-O psychology?
A systematic diagnosis of an organizational problem, often at organizational, task and person levels, to decide what intervention is needed.
Why compare high- and low-turnover units?
Differences between them can reveal practices, such as supervision or onboarding, that drive the problem.
What predicts employee turnover?
Research points to job satisfaction, commitment, supervisor relationships, pay, workload and the availability of other jobs.
How is the cost of turnover estimated?
By adding recruiting, hiring, training and lost productivity or overtime costs for each departure and multiplying by the number of departures.