| Course | QSO 370 Predictive Analytics |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate project building, validating and interpreting a logistic regression classifier for a business outcome |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 370 Module 3
Catching Half the Run-Outs in a Tenth of the Tanks: A Risk Model for Ledgewood Fuel
[Student Name]
Southern New Hampshire University
QSO 370: Predictive Analytics
Project One: Predictive Model
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Catching Half the Run-Outs in a Tenth of the Tanks: A Risk Model for Ledgewood Fuel
Introduction
Last winter 410 of Ledgewood Fuel Company's 14,600 automatic-delivery customers ran out of oil, 2.8 percent. Each run-out cost about $330 in emergency delivery and burner service, and run-outs are one of the main reasons customers give for leaving. Dispatchers can prevent a run-out by moving a delivery up, but they cannot move every delivery up without wasting trips. The decision is therefore which customers to treat as high risk each week. This project builds a model that ranks customers by their probability of running out before their next scheduled delivery, validates it on a winter it did not see and recommends how many customers to flag.
Data and Preparation
The data cover all automatic customers for the 2024-25 and 2025-26 heating seasons, with 410 run-outs in each. Each customer-season is one record, with the outcome coded 1 if the customer ran out at least once. Predictors were limited to information known at the start of the season, so that the model could be used in practice:
The customer's average absolute prediction error in the previous season, the gap between the oil the degree-day model predicted and what was delivered, which reflects how erratic the household's use is. Tank size, 275 or 330 gallons. Whether the home heats water with oil. Whether the home changed occupants in the last year, from the account records. Whether a wireless tank monitor is installed, which reports the oil level daily. And the number of years as a customer.
Customers new in the season had no prior prediction error; for them, the variable was set to the median and a flag for new customers was added, so that the model could learn whether new customers differ. Three run-out records were removed because they followed a delivery missed during a truck breakdown, a cause no customer characteristic could predict.
Training and Validation
The model was trained on the 2024-25 season and tested on 2025-26. Using a later season as the test set is a stricter check than a random split, because it tests whether patterns hold in a winter with different weather and customers who have changed. Hawkins (2004) warns that a model fitted too closely to its training data learns noise as well as signal and performs worse on new data, and that only independent test data reveal it. Shmueli and Koppius (2011) argue that predictive claims should rest on such out-of-sample tests.
Model Results
Logistic regression for run-out, odds ratios
| Predictor | Odds ratio | Interpretation |
|---|---|---|
| Prediction error above 20 gallons last season | 3.4 | Erratic users run out far more often |
| Change of occupants in last year | 2.9 | New households use oil differently from the old pattern |
| 275-gallon tank, against 330 | 1.8 | Smaller tanks leave less margin |
| Oil-fired hot water | 1.6 | Higher base load drains tanks faster |
| New customer | 1.5 | No history to predict from |
| Tank monitor installed | 0.12 | Daily levels prevent almost all run-outs |
| Years as customer, per 5 years | 0.94 | Slightly lower risk, not significant |
All predictors except tenure were significant at the 5 percent level. The odds ratios are easier to read than coefficients: a household whose use was erratic last season has about 3.4 times the odds of running out of an otherwise similar household. The tank monitor's odds ratio of 0.12 says that monitored customers almost never run out, which is expected, since their deliveries are triggered by the real level, but it also means the model mostly ranks the 87 percent of customers without monitors.
Validation Performance
Fawcett (2006) explains that the ROC curve shows a classifier's trade-off between catching positives and raising false alarms across every possible threshold, and that the area under it measures how well the model ranks positive cases above negative ones, independent of any one threshold. Scored on the 2025-26 season, the model reached 0.81 under the ROC curve, against 0.82 on the training season, so it held up on the new winter.
Flagging the riskiest customers, 2025-26 test season
| Share flagged | Customers flagged | Run-outs caught | Recall | Precision | Lift |
|---|---|---|---|---|---|
| 5% | 730 | 131 | 32% | 18% | 6.4 |
| 10% | 1,460 | 213 | 52% | 15% | 5.2 |
| 20% | 2,920 | 291 | 71% | 10% | 3.6 |
Accuracy was not used to judge the model. With a run-out rate of 2.8 percent, a model that predicted no run-outs at all would be 97.2 percent accurate and useless. Flagging the riskiest 10 percent of customers catches 52 percent of the run-outs, about five times what random selection would catch. Precision at that level is 15 percent: of every seven customers flagged, about one would actually have run out.
Choosing a Threshold
The right number of customers to flag depends on what each error costs. Missing a run-out costs about $330, plus the risk of losing the customer. A false alarm costs much less: moving a delivery up for a customer who would not have run out costs about $14 in extra driving and a smaller drop. At 10 percent flagged, the model would catch 213 run-outs worth about $70,000 and generate about 1,250 unneeded early deliveries costing about $17,500. At 20 percent, it would catch 78 more run-outs, worth about $26,000, but add about 1,380 more false alarms, costing about $19,000, and the dispatchers report they cannot move more than about 1,500 deliveries in a winter without disrupting routes. Flagging 10 percent is therefore recommended.
Limits
The model ranks customers at the start of the season; it does not see a cold snap or a household that leaves for a month. It cannot help monitored customers, who rarely run out anyway. And it relies on last season's prediction error, which will change once the regression from Module 2 replaces the old single K-factor. The model will have to be retrained after that change, and its performance watched in the first month.
Recommendation
Ledgewood should score all automatic customers each September, flag the riskiest 10 percent for an earlier delivery trigger, at 35 percent of tank capacity instead of 25, and offer tank monitors first to the flagged customers, since a monitor reduces risk more than any other factor.
References
Fawcett, T. (2006). An introduction to ROC analysis. Pattern Recognition Letters, 27(8), 861-874. https://doi.org/10.1016/j.patrec.2005.10.010
Hawkins, D. M. (2004). The problem of overfitting. Journal of Chemical Information and Computer Sciences, 44(1), 1-12. https://doi.org/10.1021/ci0342472
Shmueli, G., & Koppius, O. R. (2011). Predictive analytics in information systems research. MIS Quarterly, 35(3), 553-572. https://doi.org/10.2307/23042796
What the QSO 370 Module 3 instructions ask for
QSO 370 Project One usually asks students to build and evaluate a predictive model for a business problem. Expect to define the outcome and the decision it supports, describe and prepare the data, including missing values and variable construction, split it into training and validation sets, build a model such as logistic regression or a decision tree, interpret its results, evaluate it on the validation data with measures such as a confusion matrix, accuracy, precision, recall, ROC curves or lift and recommend how it should be used. Strong projects choose predictors available before the decision, validate honestly, explain why accuracy can mislead when the outcome is rare and set a threshold based on what each kind of error costs.
How this QSO 370 Module 3 project one example is built
The project builds a run-out model for Ledgewood Fuel Company, a fictional heating oil dealer in Massachusetts with 14,600 automatic customers. Two winters provide 820 run-outs. A logistic regression uses the customer's past prediction errors, tank size, oil-fired hot water, a change of occupants and whether a tank monitor is installed. Trained on 2024-25 and tested on 2025-26, it reaches an area under the ROC curve of 0.81. Flagging the riskiest 10 percent, 1,460 customers, catches 213 of the 410 run-outs, a lift of about 5.2, though only 15 percent of flagged customers would have run out. Fawcett on ROC analysis, Shmueli and Koppius and Hawkins on overfitting guide the validation.
Where the QSO 370 Module 3 rubric puts the points
Instructors grading QSO 370 Project One look at a clearly defined outcome tied to a decision, careful data preparation, predictors that are known in advance, an appropriate split into training and validation data, a correctly built and interpreted model, evaluation on held-out data with suitable measures, a threshold chosen for the business and an honest account of limits. Projects that score highest explain what precision and recall mean for the people who will act on the model. Credit drops when the model is evaluated on training data, accuracy is reported alone for a rare outcome, predictors leak information from after the event or coefficients are misread. Tables, clarity and APA citations count too.
QSO 370 Module 3 help: the mistakes that cost points
Start by defining exactly what you are predicting and when the prediction must be made, then use only predictors known at that time; anything recorded after the event leaks the answer. Prepare the data, decide how to handle missing values and split it: a later period makes the most honest test. Fit the model on the training data, then score the validation data and build a confusion matrix at several thresholds. For a rare outcome, accuracy is misleading; report recall, precision, the ROC curve and lift instead. Choose the threshold by asking what a missed case and a false alarm each cost, and how many cases the team can actually handle. A common mistake is a perfect-looking model built on leaked data; another is a threshold chosen by default.
Get QSO 370 Module 3 written to your instructions
Upload the QSO 370 Project One guidelines and your data. A writer frames the prediction, prepares and splits the data, builds a classification model such as logistic regression, interprets the coefficients, validates it on held-out data with a confusion matrix, ROC curve and lift and recommends a threshold tied to the business decision. Your first QSO 370 project is free, and the finished draft takes about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 370 papers and related BS Operations Management samples
- QSO 370 Module 1 Discussion: What Prediction Could Do for an Oil Dealer
- QSO 370 Module 2 Regression Assignment: Gallons, Days and Degree Days
- QSO 370 Module 4 Discussion: The Model That Scored 0.97 and Failed
- QSO 370 Module 5 Classification Assignment: A Churn Tree Judged on Profit
- QSO 370 Module 6 Discussion: Forecasting Tomorrow's Gallons
- QSO 370 Module 7 Project Two: Putting the Models in Front of Dispatchers
- QSO 370 Module 8 Discussion: A Credit-Hold Model in January
- FIN 485 Module 1 Discussion: The Planning Process and a Planner's Duty
- MKT 335 Module 7 Final Project: The Digital Advertising Campaign Plan
- QSO 345 Module 7 Project Two: Earned Value at Week 18
- ACC 425 Module 7 Project Two: An Admission-Seeking Interview Plan
QSO 370 Module 3 questions, answered
Where can I find a free QSO 370 Module 3 Project One sample?
This page holds the complete QSO 370 Project One: a logistic regression run-out risk model for an invented heating oil dealer, tested on a new winter.
What is logistic regression?
A model that predicts the probability of a yes-or-no outcome from predictors, with coefficients that can be expressed as odds ratios.
What is an ROC curve?
A plot of the true positive rate against the false positive rate across all thresholds; the area under it measures how well a model ranks positive cases above negative ones.
What is lift in predictive modeling?
The ratio of the outcome rate among the cases a model flags to the overall rate, showing how much better than random selection the model is.
What is data leakage?
Using information in a model that would not be available when the prediction is made, which makes validation results look better than real performance.