From 13.4 Days Toward Nine: An Analytics Report for Silverline Collision Centers
[Student Name]
Southern New Hampshire University
QSO 511: Business Analytics
Final Project
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From 13.4 Days Toward Nine: An Analytics Report for Silverline Collision Centers
Summary
At 13.4 days from drop-off to pickup, Silverline Collision Centers' average repair runs well beyond the roughly nine days its largest insurer partner expects. Analysis of a year of data shows that only about four of those days are repair work; the rest is waiting for insurer approvals, parts and customers. Five changes, one of them tested in a pilot, are projected to bring the average to about 10.9 days within a year. That falls short of nine. Reaching nine will also require changes with parts suppliers and insurers that Silverline cannot make alone, and this report recommends opening those discussions now.
The Problem and the Decisions
Insurers steer claims through their direct repair programs to the shops that keep repair bills, complaints and days in the shop low. Silverline's largest insurer partner has said its share of referrals will fall if cycle time does not improve. The owner asked for the numbers to come down. Provost and Fawcett (2013) argue that analytics creates value by improving specific decisions, so the study was framed around five decisions: what to do with a car at drop-off, how to chase late parts, how to work with slow-approving insurers, when to tell customers their cars are ready and how to assign technicians.
Data
Data from the shop management system, the estimating system and the parts suppliers' portal were cleaned and joined for about 31,400 repairs. Ninety-four percent link across all three systems, the unmatched repairs are mostly short jobs without insurance claims or parts and the prepared data reproduce Silverline's reported 13.4-day average. At four shops, some pickup dates had to be inferred from the date of final payment.
What the Description Showed
Average days by stage
| Stage | Days |
|---|---|
| Estimate approval | 2.1 |
| Parts | 4.6 |
| Repair work | 4.0 |
| Supplement approval | 1.5 |
| Customer pickup | 1.2 |
| Total | 13.4 |
Chen et al. (2012) describe how analytics moves from describing performance to predicting and guiding it; the description here set the direction for both. Cycle time is skewed: the median is 10 days, but the longest fifth of repairs, those over 18 days, consume 41 percent of the chain's repair days. Once the mix of work is taken into account, most of the gap between shops lies in parts: about 2.9 days at the quickest three against 6.4 at the slowest three. What sets the quick shops apart is that they strip damaged panels the moment a car arrives and place one complete parts order.
The Prediction Model
A logistic regression built on eight pieces of information available when the customer hands over the keys, including structural damage, number of parts lines, make and whether the car was towed, was trained on nine months of repairs and tested on the following three. Flagging the riskiest 25 percent of repairs, the number shops said they could act on, caught 62 percent of long repairs, and 45 percent of flagged repairs ran long against 18 percent overall. A random forest was slightly more accurate but harder to explain to shop managers.
The Pilot
The observed link between same-day teardown and shorter repairs could have reflected other differences between shops, so it was tested. Kohavi et al. (2009) show that random assignment gives the clearest answer when a company wants to know whether a new practice works. For eight weeks in four slower shops, each flagged car was randomly assigned to same-day teardown with a complete parts order or to the usual process. The measure and analysis were fixed in advance.
Pilot results, flagged cars in four shops
| Group | Cars | Average cycle time |
|---|---|---|
| Same-day teardown | 118 | 17.9 days |
| Usual process | 117 | 21.0 days |
| Difference | 3.1 days, 95% interval 0.8 to 5.4 |
The effect is real but uncertain: it could be as small as one day or as large as five. Supplements during repair fell from 61 to 38 percent of flagged cars in the teardown group, which explains much of the effect. No difference in repair cost was found.
The Assignment Model
Lepenioti et al. (2020) describe prescriptive analytics as recommending actions by combining predictions with optimization. An assignment model matching ready jobs to qualified technicians each morning was tested on 20 past working days at one shop. It reduced jobs waiting for a qualified technician from 2.3 to 0.6 a morning and estimated labor hours by 3 percent after adding a constraint that protects flat-rate technicians' weekly hours.
Recommendations and Projected Effects
Projected reduction in average cycle time after one year
| Recommendation | Basis of estimate | Days saved |
|---|---|---|
| Flag at drop-off with same-day teardown and complete parts order | Pilot effect of 3.1 days on the 25% of repairs flagged | 0.8 |
| Photo-based approval with the two slowest insurers | Their 30% of repairs moving from 3.4 to about 1.5 days of approval | 0.6 |
| Text customers when cars are ready and offer evening pickup | Fast shops' 0.7-day pickup time applied chain-wide | 0.5 |
| Daily escalation of late parts on the dashboard | Assumed 10% reduction in the parts stage for unflagged repairs | 0.4 |
| Technician assignment model | Waiting for technicians at the test shop | 0.2 |
| Total | 2.5, from 13.4 to about 10.9 |
The effects were estimated separately and affect different stages, so adding them does not count the same days twice, though the teardown and parts effects overlap somewhat. The weakest estimates are for late-part escalation, which rests on an assumption, and for photo-based approval, which depends on two insurers agreeing. Even if every estimate is met, the average remains about two days above nine. The remaining gap lies mostly in parts lead times from manufacturers and in supplement approvals, which need agreements with suppliers and insurers.
Implementation and Measures
The drop-off flag and teardown will roll out to six shops a quarter, starting with the slowest, managed by the operations director. The pickup texts and late-part dashboard view can go live chain-wide within two months. The regional managers will open approval discussions with the two slowest insurers this quarter. The assignment model will be piloted at Lawrenceville before wider use. Success will be measured weekly by median and 90th-percentile cycle time, not only the average, and by the share of repairs over 18 days. The prediction model will be checked monthly and refitted each quarter.
Limitations
The pilot was small and in four shops, so the effect elsewhere may differ. The prediction model will lose accuracy as makes and suppliers change. Projections assume the insurers agree and that shops follow the new processes. And the stage times for four shops rest partly on payment dates.
Conclusion
Most of Silverline's repair time is waiting, and long repairs drive the average. A drop-off flag with same-day teardown has been tested and works, and four further changes address other stages. Together they are projected to bring cycle time to about 10.9 days within a year. The owner is asked to approve the rollout and to authorize discussions with suppliers and insurers to close the remaining gap.
References
Chen, H., Chiang, R. H. L., & Storey, V. C. (2012). Business intelligence and analytics: From big data to big impact. MIS Quarterly, 36(4), 1165-1188. https://doi.org/10.2307/41703503
Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1
Lepenioti, K., Bousdekis, A., Apostolou, D., & Mentzas, G. (2020). Prescriptive analytics: Literature review and research challenges. International Journal of Information Management, 50, 57-70. https://doi.org/10.1016/j.ijinfomgt.2019.04.003
Provost, F., & Fawcett, T. (2013). Data science and its relationship to big data and data-driven decision making. Big Data, 1(1), 51-59. https://doi.org/10.1089/big.2013.1508
What the QSO 511 Module 9 instructions ask for
For the QSO 511 final project, students typically deliver a full analytics study of a company problem written for the people who will decide. Expect to state the problem and the decisions it informs, describe the data and how they were prepared, report descriptive findings, present predictive or prescriptive models and how they were validated, make recommendations and set out how progress will be tracked. Strong projects open with the answer, connect each finding to a decision, show how models performed on data they had not seen, report uncertainty, estimate the effect of each recommendation separately, admit where the target will not be met and set out an implementation plan with measures and owners.
How this QSO 511 Module 9 final project example is built
The project reports to the owner of Silverline Collision Centers, a fictional chain of 22 collision repair shops whose repairs average 13.4 days against the nine days its largest insurer partner expects. It shows that only four days are repair work, that long repairs make up 41 percent of repair days and that parts delays separate fast shops from slow ones. A pilot found that same-day teardown for flagged cars shortened their repairs by 3.1 days, with a 95 percent interval of 0.8 to 5.4. Five recommendations are projected to bring the average to about 10.9 days in a year, short of nine, which the report states plainly. Chen and colleagues, Provost and Fawcett, Lepenioti and colleagues and Kohavi and colleagues inform the analysis.
Where the QSO 511 Module 9 rubric puts the points
The QSO 511 final project is commonly graded on a clearly framed business problem, sound and documented data preparation, accurate descriptive analysis, validated predictive or prescriptive models, evidence for recommendations including tests where possible, honest treatment of uncertainty, projected effects for each recommendation, an implementation plan with measures and owners and communication suited to decision makers. The strongest projects show how each analysis changed a decision. Credit drops when findings are not tied to decisions, models are reported without validation, pilot results are given without uncertainty, projections are combined into one optimistic number or limitations are hidden. Tables, clear writing and APA citations complete the grade.
QSO 511 Module 9 help: the mistakes that cost points
Lead with the problem, your answer and what you want approved. Then summarize the work in the order the reader needs it: the data and their limits, what the description showed, what the model predicts and how well it did on new data, what any test found and how certain it is, and what you recommend. For each recommendation, estimate its effect separately and say what the estimate rests on. Add the effects with care and show whether they reach the target. Set out who will do what, when and how progress will be measured. Keep technical detail in an appendix. A common mistake is presenting every analysis at equal length; another is projecting that the target will be met when the evidence says otherwise.
Get QSO 511 Module 9 written to your instructions
Share the QSO 511 final project guidelines and your earlier milestones. A writer frames the business problem and decision, summarizes data preparation and descriptive findings, presents predictive and prescriptive models with their test results, reports any pilot evidence with uncertainty, projects the effect of each recommendation and sets out a plan with measures, citing analytics research. Your first QSO 511 paper is free, written within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 511 papers and related MS Operations Management samples
- QSO 511 Module 1 Discussion: Framing an Analytics Question
- QSO 511 Module 2 Data Preparation Assignment: Three Systems That Disagree
- QSO 511 Module 3 Descriptive Analysis Assignment: Where the Repair Days Go
- QSO 511 Module 4 Discussion: A Dashboard Shop Managers Will Use
- QSO 511 Module 5 Visualization Assignment: Charts That Tell the Truth About Cycle Time
- QSO 511 Module 6 Predictive Model Assignment: Flagging Long Repairs at Drop-Off
- QSO 511 Module 7 Discussion: Can This Finding Be Trusted?
- QSO 511 Module 8 Prescriptive Analytics Assignment: Assigning Technicians to Jobs
- QSO 511 Module 10 Discussion: Customers' Cars, Photos and Data
- OL 690 Module 1 Discussion: What a Recycler Owes Beyond Profit
- FIN 640 Module 10 Final Project: The Report to the Finance Committee
- ACC 550 Module 1 Discussion: Cost Information After an Export Market Shrinks
- FIN 620 Module 4 Discussion: How Federal Reserve Policy Reaches a City's Borrowing Cost
QSO 511 Module 9 questions, answered
Where can I find a free QSO 511 Module 9 Final Project sample?
The complete QSO 511 Module 9 final project is on this page: an analytics report on repair cycle time at an invented collision repair chain.
What should an analytics project report include?
The problem and decision, data and preparation, descriptive findings, models and validation, evidence for recommendations, projected effects, an implementation plan and limitations.
Why report a confidence interval for a pilot result?
Because a pilot measures an effect in a sample, and the interval shows the range of effects consistent with the data, which affects how much to rely on it.
How should projected effects be combined?
Separately first, with the basis for each, then added only where they affect different parts of the problem, so effects are not counted twice.
Should a report say when a target will not be met?
Yes. Decision makers need to know the realistic result so they can plan, adjust the target or fund further changes.