| Course | QSO 511 Business Analytics |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment formulating and solving an assignment optimization model, comparing it with current practice and discussing constraints and fairness |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 511 Module 8
Every Job Started by Noon: An Assignment Model for Silverline's Body Technicians
[Student Name]
Southern New Hampshire University
QSO 511: Business Analytics
Prescriptive Analytics Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Every Job Started by Noon: An Assignment Model for Silverline's Body Technicians
Introduction
At Silverline Collision Centers, cycle time is mostly waiting, and one form of waiting happens inside the shop: a car that is ready for body work sits until a qualified technician is free. At the Lawrenceville shop, with nine body technicians, the shop foreman assigns jobs each morning by seniority, with the most experienced technicians choosing the largest jobs. This assignment formulates the morning assignment as an optimization model, solves a small example, tests the model on past days and considers its effect on technicians.
Formulation
Let i index technicians and j index jobs ready to start. The decision variable x(i,j) equals 1 if technician i is assigned job j and 0 otherwise. The input h(i,j) is the estimated labor hours technician i would need for job j, based on the estimate and each technician's past speed on similar work. The objective is to minimize the total estimated labor hours of the jobs started, the sum of h(i,j) times x(i,j).
Three sets of constraints apply. Each job ready to start must be assigned to exactly one technician, so no ready car waits while technicians are available. Each technician receives at most one new job per morning. And x(i,j) must be 0 when technician i lacks the certification job j requires: structural repairs need structural certification and aluminum panels need aluminum certification. When there are more technicians than jobs, the spare technicians continue work in progress. Kuhn (1955) showed that this assignment problem can be solved exactly with the Hungarian method, and a spreadsheet solver handles a shop of this size in seconds.
A Small Example
On one morning, five technicians and five jobs were available.
Estimated hours by technician and job, with dashes where the technician is not certified
| Technician | Rail and pillar repair | Aluminum hood and fender | Quarter panel | Bumper and sensor bracket | Door dent and refinish preparation |
|---|---|---|---|---|---|
| T1, structural and aluminum | 14.0 | 9.0 | 11.0 | 6.5 | 5.0 |
| T2, structural | 15.5 | - | 11.5 | 7.0 | 5.5 |
| T3, general | - | - | 13.5 | 6.0 | 4.5 |
| T4, general | - | - | 14.5 | 6.5 | 4.0 |
| T5, apprentice | - | - | - | 8.5 | 5.5 |
Under the usual practice, T1, the senior technician, takes the rail and pillar repair, the largest job, at 14 hours. T2 takes the quarter panel, T3 the bumper and T4 the door. That leaves the aluminum hood and fender, which only T1 is certified to repair, waiting until T1 finishes about two working days later, and T5 without a job.
The optimal assignment is T1 on the aluminum job (9.0 hours), T2 on the rail and pillar repair (15.5), T3 on the quarter panel (13.5), T4 on the bumper (6.5) and T5 on the door (5.5), a total of 50.0 labor hours, with every job started that morning. Checking all feasible assignments confirms that none is lower. The model gives T1's scarce aluminum certification to the only job that needs it and accepts that T2 is 1.5 hours slower on the rail repair. The foreman's rule minimizes nothing in particular; it rewards seniority and, in this case, adds two days to one customer's repair.
Testing on Past Days
The model was run on 20 past working days at Lawrenceville, using the jobs that were ready each morning and the technicians present.
Model compared with actual assignments, 20 working days
| Measure | Actual assignments | Model |
|---|---|---|
| Jobs waiting for a qualified technician, average per morning | 2.3 | 0.6 |
| Estimated labor hours for jobs started | Baseline | 4% lower |
| Mornings with an apprentice left without a job | 7 | 2 |
The remaining waits occurred on mornings when more aluminum or structural jobs were ready than certified technicians were present. That points to a decision the model cannot make, whether to certify another technician in aluminum repair, but it shows its value: across 20 mornings, it identified 13 on which the certification shortage delayed jobs.
Inputs and Uncertainty
Bertsimas and Kallus (2020) argue that prescriptive models should be built on predictions from data, and that how those predictions are made affects the quality of the decisions. Here the hours h(i,j) are predictions: estimated labor from the repair estimate, adjusted by each technician's ratio of actual to estimated hours on similar jobs over the past six months. These estimates are uncertain, especially for technicians with few similar jobs. When the hours were varied by 15 percent at random in 200 trials, the model's assignment for the example morning stayed the same in 81 percent of trials, and the certified technicians were always placed on the jobs only they could do.
Fairness and Pay
Like most collision technicians, Silverline's are paid largely by flat rate: a set amount for each estimated labor hour on the jobs they complete, regardless of how long the work actually takes. The assignment of jobs therefore affects pay. A model that always gave the fastest technician the most profitable work could cut others' earnings. Technicians' representatives raised this when the model was presented. A constraint was added requiring that over each week, every technician be assigned at least 85 percent of their average weekly flagged hours over the prior quarter, unless they are absent. On the 20 test days, this constraint raised total estimated hours by about 1 percent, leaving a 3 percent improvement, and no technician's assigned hours fell below the floor.
Using the Model
Lepenioti et al. (2020), reviewing prescriptive analytics, note that recommendations are often adopted only when they are integrated into how people make decisions. The foreman will receive the model's suggested assignment each morning on the dashboard and can override it, with a reason recorded. Overrides will be reviewed monthly to see whether they reveal constraints the model has missed, such as a technician recovering from an injury or a customer requesting a particular person. Rules found this way will be added to the model.
Conclusion
Formulating morning job assignment as an optimization model starts more jobs each day, uses scarce certifications where they are needed and lowers labor hours, while a minimum-hours constraint protects technicians' pay. The model also shows when certification shortages, not assignment, are delaying jobs. It will be piloted at Lawrenceville with the foreman keeping the final decision.
References
Bertsimas, D., & Kallus, N. (2020). From predictive to prescriptive analytics. Management Science, 66(3), 1025-1044. https://doi.org/10.1287/mnsc.2018.3253
Kuhn, H. W. (1955). The Hungarian method for the assignment problem. Naval Research Logistics Quarterly, 2(1-2), 83-97. https://doi.org/10.1002/nav.3800020109
Lepenioti, K., Bousdekis, A., Apostolou, D., & Mentzas, G. (2020). Prescriptive analytics: Literature review and research challenges. International Journal of Information Management, 50, 57-70. https://doi.org/10.1016/j.ijinfomgt.2019.04.003
What the QSO 511 Module 8 instructions ask for
The QSO 511 Module 8 assignment usually asks students to apply prescriptive analytics, such as optimization or simulation, to recommend a decision. Expect to define the decision, formulate decision variables, an objective and constraints, solve the model with a spreadsheet solver or similar tool, interpret the solution, test its sensitivity and explain how it would be used. Strong assignments write the formulation clearly, check it on a small example whose answer can be verified, compare the recommended decision with what is done now, include practical constraints such as qualifications and fairness, explain where the inputs come from and how uncertain they are and describe how people will use and override the model.
How this QSO 511 Module 8 prescriptive analytics assignment example is built
The assignment formulates technician-to-job assignment at the Lawrenceville shop of Silverline Collision Centers, a fictional chain of 22 collision repair shops. Each morning, jobs must be matched to body technicians who differ in certifications for structural and aluminum repair and in speed. A five-job example shows that giving the senior technician the biggest job leaves an aluminum repair waiting two days, while the optimal assignment starts all five jobs for 50 labor hours. On 20 past working days with nine technicians, the model cuts jobs waiting for a qualified technician from 2.3 a day to 0.6 and labor hours by 4 percent. A minimum-hours rule protects flat-rate pay. Kuhn, Lepenioti and colleagues and Bertsimas and Kallus inform the work.
Where the QSO 511 Module 8 rubric puts the points
The QSO 511 prescriptive analytics assignment is commonly graded on a clear formulation with decision variables, objective and constraints, a correct solution, verification on a small example, comparison with current practice, sensitivity or testing on past data, practical and ethical constraints, an honest account of where inputs come from and a plan for putting the model into daily use. The strongest assignments show what the model changes about a real decision and who keeps the final say. Credit drops when formulations are vague, solutions are reported without checking, constraints that matter to people are missing, inputs are treated as certain or the model is presented as replacing judgment. Tables, clear writing and APA citations complete the grade.
QSO 511 Module 8 help: the mistakes that cost points
Start by writing the decision in plain words: who or what is being assigned, to what, and what makes one assignment better than another. Then define the decision variables, the objective and every rule the solution must follow, such as qualifications and capacity. Solve a small version by hand or with a solver and check that the answer makes sense. Compare it with what the organization does now and explain the difference. Test the model on past days or with changed inputs to see how stable its recommendations are. Add constraints that protect people, such as pay or workload rules, and show what they cost. Explain where each input comes from. A common mistake is optimizing a measure no one cares about; another is leaving out a rule everyone in the workplace would insist on.
Get QSO 511 Module 8 written to your instructions
Share the QSO 511 Module 8 instructions and your decision problem. A writer sets out what is being decided, what is being minimized or maximized and the rules a solution must obey, builds and solves the optimization model, compares its solution with current practice, tests it on past data, adds constraints for fairness or policy and explains the limits of the inputs, citing prescriptive analytics research. Your first QSO 511 paper is free, prepared in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 511 papers and related MS Operations Management samples
- QSO 511 Module 1 Discussion: Framing an Analytics Question
- QSO 511 Module 2 Data Preparation Assignment: Three Systems That Disagree
- QSO 511 Module 3 Descriptive Analysis Assignment: Where the Repair Days Go
- QSO 511 Module 4 Discussion: A Dashboard Shop Managers Will Use
- QSO 511 Module 5 Visualization Assignment: Charts That Tell the Truth About Cycle Time
- QSO 511 Module 6 Predictive Model Assignment: Flagging Long Repairs at Drop-Off
- QSO 511 Module 7 Discussion: Can This Finding Be Trusted?
- QSO 511 Module 9 Final Project: The Analytics Project Report
- QSO 511 Module 10 Discussion: Customers' Cars, Photos and Data
- MGT 630 Module 10 Final Project: The Integrated Quality and Productivity Report
- MKT 635 Module 2 Website Usability Assignment: Website Usability and Design Evaluation
- CSR 610 Module 7 Discussion: A Technician Who Reports Altered Records
- QSO 500 Module 1 Discussion: Turning a Dashboard Number Into a Research Problem
QSO 511 Module 8 questions, answered
Where can I find a free QSO 511 Module 8 Prescriptive Analytics Assignment sample?
The complete QSO 511 Module 8 assignment is on this page: an optimization model assigning technicians to jobs at an invented collision repair shop.
What is prescriptive analytics?
Analytics that recommends decisions, usually by optimizing an objective under constraints or by simulating the results of alternative actions.
What is the assignment problem?
An optimization problem that matches a set of workers to a set of tasks, one each, to minimize total cost or time or maximize total value.
What is the Hungarian method?
An algorithm published by Harold Kuhn in 1955 that finds the optimal solution to the assignment problem efficiently.
Why include fairness constraints in an optimization model?
Because a solution that is best on one measure can harm people, such as by cutting some workers' pay, and constraints make those protections explicit.