MGT 630 Module 10 Final Project Example

Reviewed by Portia Lambrick, MBA

This MGT 630 Module 10 Final Project sample brings quality, productivity, cost and safety together in one report on a real-scale construction project. SNHU MGT 630 (MGT-630) ends its MS in Management course by asking students to evaluate how quality and productivity were managed and to recommend an approach the organization can repeat. Merrymeeting Builders, a composite Maine apartment builder, reports to its leadership on a 96-unit wood-frame project. The paper reviews the starting problem, how the quality and productivity plans performed against their measures, what earned value and safety data added and which practices should become the company standard on every job.

CourseMGT 630 Construction Quality Management and Productivity
ModuleModule 10
Paper typegraduate final project analyzing a construction project's quality and productivity and recommending an integrated system
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Management
UpdatedOctober 2026

Free sample paper for MGT 630 Module 10

1

One System, Four Measures: An Integrated Quality and Productivity Report on Cathance Landing for Merrymeeting's Leadership

[Student Name]

Southern New Hampshire University

MGT 630: Construction Quality Management and Productivity

Final Project: Quality and Productivity Report

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingMerrymeeting Builders, Cathance Landing and all results are fictional and illustrative.
2

One System, Four Measures: An Integrated Quality and Productivity Report on Cathance Landing for Merrymeeting's Leadership

Executive Summary

Merrymeeting Builders started its Topsham apartment job, Cathance Landing, after a previous project that finished on time but cost at least $798,000 in rework, close to three percent of contract value, including 41 leaking windows. The company set out to manage quality, productivity, cost and safety as one system. At the end of framing, results are clearly better on quality and planning reliability, recovering on productivity and cost and still incomplete on safety measurement. This report sets out the results against the targets, explains them and recommends five practices for every future project.

What this page is doingGives leadership the essentials.
3

The Starting Point

Pejepscot Commons, the previous project, logged 212 rework items costing $684,000 directly and about $114,000 in extended supervision. Two causes, a window installation sequence nobody owned and drawing conflicts never caught in review, explained most of the money. Productivity was measured only as panels set per day, which rewarded speed that later leaked. Across 161 Australian projects, just over half of all cost growth traced back to rework (Love, 2002), which suggested that Merrymeeting's most controllable source of overrun was its own rework rather than market prices.

What this page is doingRestates the problem in numbers.
4

Quality Results

Quality measures, Cathance Landing framing phase

MeasureBaselineTargetResult
Rework spending per million dollars of completed workNear $25,000 (Pejepscot)Under $12,000About $11,000
First-time acceptance at hold pointsNot measured90 percent87 percent
Openings passing flashing check before window installationNot measured100 percent100 percent after week 2
Windows leaking in the 10 percent sample water test41 in service at PejepscotNoneNone

The window mockups and the rule that the weather barrier foreman signs off every opening eliminated the failure that cost the most last time. The overlay review caught 19 conflicts before fabrication but missed the stair cores, which produced two misframed openings and the hand injury described below. Hwang et al. (2009), analyzing rework sources across 359 projects, found that the sources with the greatest impact were similar across project categories, which supports treating design coordination as a standing control rather than a one-time fix.

What this page is doingCompares outcomes with the quality plan's targets.
5

Productivity Results

In the first ten weeks of panel setting, 18 percent of labor and crane hours were lost, mostly to late or unsequenced deliveries and wind. After the delivery protocol, staging buffer and wind-day task lists took effect, losses fell to about 7 percent over the following eight weeks, and hours per panel improved from 2.45 to 2.07 overall, close to the 2.05 target. Percent plan complete rose from 54 to between 80 and 86 percent and stayed there. Liu et al. (2011) found productivity related to plan reliability across 134 weeks of project data, and the Cathance record shows the same pattern on a smaller scale: weeks with higher plan completion had lower hours per panel.

What this page is doingShows what the data and planning changed.
6

Cost and Schedule Results

At week 14 the framing package had a cost index of 0.916 and was forecast to overrun by about $270,000 and finish 2.8 weeks late. With supply discipline replacing open-ended overtime and a limited Saturday shift, the index recovered to 0.94 by the end of framing, the final overrun is forecast at about $175,000 and the package finished 1.6 weeks late. The overrun is real, but it is smaller than the trend implied and comes mainly from losses already incurred before the plan took effect.

What this page is doingReports where the money landed.
7

Safety Within the System

The one recordable injury during framing, a hand laceration, happened during rework of a misframed stair opening, and a near miss followed a rushed crane pick. Wanberg et al. (2013) found on 32 building projects that recordable injury rates rose with rework and first aid rates with defects, which matches Merrymeeting's experience. Near-miss reporting and the share of crane picks backed by a written pre-task plan joined the dashboard in week 19. It is too early to judge them, but near-miss reporting rose from two to nine a week, which suggests crews are willing to report.

What this page is doingBrings safety into the same measures.
8

What Interacted

The flashing sign-off slowed panel setting in the first two weeks, when the weather barrier crew could not keep up; hours per panel briefly rose. Adding one worker to that crew removed the delay. The episode showed that quality controls can cost output at first, but that the cost is a staffing and sequencing problem with a cheap fix, not a permanent tradeoff.

What this page is doingShows the tradeoffs that appeared and faded.
9

Lessons on Measurement

The most useful change was not any single control but the habit of measuring the same things every week. Under the old panels-per-day chart, a crew could look productive while building leaks, and nobody could say what rework cost until a year later. With the dashboard, the first two weeks of slower panel setting were seen, explained and fixed within days, and the stair core conflicts appeared in the nonconformance log the week they were found rather than at closeout. The measures also changed conversations at the Monday meeting: foremen began arguing about the reasons behind missed commitments, which is where improvement starts. Two measures proved weaker than expected. First-time acceptance depended on how strictly each inspector read the checklist, so it needs clearer acceptance criteria, and the cost index arrived a week late because invoices posted slowly.

What this page is doingReflects on what the numbers did.
10

Recommendations

Practices to standardize on every project

PracticeOwnerApproximate cost per project
Water-tested mockup of each opening type before productionQuality manager$5,000 to $8,000
Structural and architectural overlay review, including stair cores and shafts, before fabricationProject manager with designers$9,000 to $12,000
Weekly work planning with percent plan complete and reasons for missesSuperintendentStaff time only
Supplier delivery window, sequenced loads and one-load staging bufferProject managerLaydown space; back-charge terms
One weekly dashboard: hours per unit, plan reliability, first-time acceptance, rework cost per $1 million, cost index and two safety leading indicatorsProject managerStaff time only
What this page is doingSets the company standard.
11

Limitations

One project is not a controlled comparison. Cathance Landing had a different site, crew mix and weather from Pejepscot, so the plans cannot claim every bit of the improvement. The safety indicators have run for too short a time to show an effect.

What this page is doingStates what the results cannot prove.
12

Conclusion

Cathance Landing shows that Merrymeeting's quality and productivity problems had common roots in planning, sequencing and supply, and that controlling the work before it reaches the crew improved quality, output and cost together. Standardizing five practices, at a modest cost per project, would make that the company's normal way of building rather than a one-time effort.

What this page is doingCloses the report.
13

References

Hwang, B.-G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), 187-198. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)

Liu, M., Ballard, G., & Ibbs, W. (2011). Work flow variation and labor productivity: Case study. Journal of Management in Engineering, 27(4), 236-242. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000056

Love, P. E. D. (2002). Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), 18-29. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(18)

Wanberg, J., Harper, C., Hallowell, M. R., & Rajendran, S. (2013). Relationship between construction safety and quality performance. Journal of Construction Engineering and Management, 139(10), Article 04013003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000732

What the MGT 630 Module 10 instructions ask for

The MGT 630 final project typically asks you to analyze quality management and productivity on a construction project or case and to recommend an integrated approach, drawing together the quality plan, productivity analysis and control methods developed in the milestones. Expect to cover quality control processes, labor and equipment productivity, scheduling and cost control, safety and risk and how they relate. A strong final evaluates results against the measures and targets set earlier, explains what worked and what did not with evidence, shows how quality, productivity, cost and safety interact and ends with specific practices the organization should standardize. It should read as a single report to decision makers, not as milestones stapled together.

How this MGT 630 Module 10 final project example is built

The sample reports to Merrymeeting's leadership on Cathance Landing, a 96-unit apartment building in Topsham, Maine. It starts from the previous project's $798,000 of rework and 41 leaking windows, then reviews results: no window leaks in water testing, rework running near $11,000 per million dollars of work, percent plan complete above 80 percent, hours per panel down to 2.07 and the framing cost index recovering to 0.94. It explains the remaining losses, adds two safety leading indicators and recommends five practices for every future job. Love on rework and cost growth, Hwang and colleagues on rework sources, Liu, Ballard and Ibbs on plan reliability and Wanberg and colleagues on safety support it.

Where the MGT 630 Module 10 rubric puts the points

Instructors marking this final usually weigh the evaluation of quality management, the analysis of productivity, the treatment of cost, schedule and safety, the integration of these elements, the strength of recommendations and writing and APA style. Top papers compare results with the baselines and targets set earlier, explain causes with data, show where improving one measure affected another and recommend a small number of standard practices with owners. Marks drop for reports that repeat milestone text, for results claimed without numbers, for treating safety as a separate appendix and for recommendations too general to adopt. A clear executive summary that a company president could act on is a strong signal of quality.

MGT 630 Module 10 help: the mistakes that cost points

Begin with a one-page summary for decision makers: the problem, what was done, the results and the recommendations. Then compare every result with its baseline and target, using the same measures you defined earlier. Explain why each result happened, and be honest about what did not improve. Show at least one place where measures interacted, such as quality checks slowing output at first. Bring safety into the same system rather than adding it at the end. Close with a short list of practices to standardize, each with an owner and a cost. Write the final fresh from your corrected milestones rather than pasting them, since readers notice the seams.

Get MGT 630 Module 10 written to your instructions

Share your MGT 630 final project guidelines, both milestones and your instructor's comments. We combine the quality plan, the productivity analysis, cost control and safety into one report with results against targets and a standard the company can repeat. The first final project draft is free, usually in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 630 papers and related MS in Management samples

MGT 630 Module 10 questions, answered

Where can I find a free MGT 630 Module 10 Final Project sample?

The complete MGT 630 Module 10 final project is on this page: an integrated quality, productivity and safety report on an apartment project.

What does an integrated quality and productivity report include?

The starting problem, the controls and plans used, results against baselines and targets, how quality, productivity, cost and safety interacted and practices to standardize.

How much of construction cost growth comes from rework?

In a survey of 161 Australian projects, rework accounted for 52 percent of cost growth, which makes it one of the largest controllable sources of overrun.

How do you show that a quality and productivity plan worked?

Compare the same measures before and after, such as rework cost per million dollars of work and hours per unit, and explain the changes with field evidence.

Why include safety in a quality and productivity report?

Because rework and rushing raise both defects and injuries, so managing them in one system addresses shared causes.