MGT 630 Module 5 Milestone One Example

Reviewed by Portia Lambrick, MBA

This MGT 630 Module 5 Milestone One sample presents a quality management plan for a construction project, built from the failures of the contractor's previous job. SNHU MGT 630 (MGT-630) has MS in Management students design the controls, inspections and measures that will keep quality on track before productivity is addressed. Merrymeeting Builders, a composite Maine apartment builder, writes the plan for a 96-unit wood-frame building in Topsham. The milestone assigns responsibility, requires water-tested mockups and a drawing overlay review, sets an inspection and test plan with hold points, defines how nonconformances are logged and costed and chooses three measures to report each month.

CourseMGT 630 Construction Quality Management and Productivity
ModuleModule 5
Paper typegraduate milestone presenting a construction quality management plan with controls and measures
LengthAbout 1,130 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Management
UpdatedOctober 2026

Free sample paper for MGT 630 Module 5

1

Dry Openings and Coordinated Drawings: The Quality Management Plan for Cathance Landing

[Student Name]

Southern New Hampshire University

MGT 630: Construction Quality Management and Productivity

Milestone One: Quality Management Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingMerrymeeting Builders, Cathance Landing and all plan details are fictional and illustrative.
2

Dry Openings and Coordinated Drawings: The Quality Management Plan for Cathance Landing

Introduction

Cathance Landing, in Topsham, Maine, stacks four wood-framed floors holding 96 apartments on a one-story concrete podium and is being built by Merrymeeting Builders under a $31.8 million contract with a twenty-month schedule. Merrymeeting's previous project, Pejepscot Commons, finished on time but recorded 212 rework items costing at least $798,000, led by 41 leaking windows and by conflicts between structural and architectural drawings. This plan is designed to prevent those failures from recurring. It sets out who owns quality, the controls tied to the project's main risks, the inspection and test plan, how nonconformances will be recorded and the measures that will be reported each month.

What this page is doingSets the purpose and the starting point.
3

Quality Policy and Scope

The plan covers all work Merrymeeting performs and all work by its subcontractors and suppliers, including the wall panel plant. Its aim is simple: every opening dry, every assembly built in the sequence that was tested and every drawing conflict found before material is fabricated. Quality is treated as part of planning and production, not as a final inspection, following the view of Arditi and Gunaydin (1997) that quality has to be managed through every phase of a project, from design through construction, with management commitment and training rather than inspection alone.

What this page is doingStates what the plan covers.
4

Roles and Responsibilities

Quality roles

RoleResponsible forVerifies
Project managerPlan approval, monthly quality report, supplier quality termsMonthly measures and audit results
Quality manager (shared across two projects)Inspection and test plan, audits, nonconformance logHold point records and corrective actions
SuperintendentDaily quality control, sequence between trades, mockup schedulingForemen's checklists
Framing foremanPanel setting, opening framing, window installation sequenceCrew self-checks
Weather barrier foremanFlashing and barrier installation, lap and tape checksOpenings before windows are set
Subcontractor foremenTheir own inspection checklistsSubmitted to superintendent daily
Panel plant quality leadPanel dimensions, openings, labels and load sequenceShipping checklist per load

The key change from Pejepscot is that one person, the weather barrier foreman, now signs off each opening before a window goes in, and the framing foreman cannot install windows without that sign-off.

What this page is doingAssigns ownership.
5

Risk-Based Controls

Main quality risks and controls

RiskControlTiming
Water entry at windows and doorsFull-size mockup of each opening type, water-tested by an independent agency; sequence written into both scopesBefore production framing
Drawing conflicts at stairs, shafts and transfer beamsOverlay review of structural and architectural drawings by engineer, architect and MerrymeetingBefore panels are released for fabrication
Panel errors from the plantPlant checklist per load; site check of first panel of each typeEach delivery
Podium concrete toleranceSurvey of slab edges and embeds before framing beginsAfter podium pour
Air leakageBlower door test on two sample units per floorBefore drywall
Fire separation detailsMockup of a rated wall penetration; inspection of every rated wallBefore drywall

Burati et al. (1992) found that most of the cost of quality deviations on the projects they studied originated in design rather than construction. That finding is why the overlay review appears ahead of fabrication: a conflict caught on paper costs an hour, while one caught in a delivered panel costs a crane pick, a modification and a delay.

What this page is doingTies each control to a risk.
6

Inspection and Test Plan

Eleven hold points are set where later work would hide earlier work. At each, the responsible foreman completes a checklist and the superintendent or quality manager accepts the work before the next trade proceeds.

Hold points

NumberHold pointAccepted by
1Podium reinforcement before concreteQuality manager and special inspector
2Podium slab survey before framingSuperintendent
3First panel of each type set and bracedQuality manager
4Hold-downs and shear nailing before sheathing is coveredSpecial inspector
5Each opening flashed before window installationWeather barrier foreman
6Window mockup water test passedQuality manager
7Weather barrier complete per floor before sidingSuperintendent
8Rough plumbing, electrical and mechanical before insulationSuperintendent and trade foremen
9Insulation and air sealing before drywallQuality manager
10Fire-rated assemblies before drywall closes themQuality manager and fire inspector
11Sample unit blower door testsTesting agency
What this page is doingSets hold points.
7

Nonconformance and Cost of Quality

Every nonconformance will be logged on the day it is found, with location, trade, cause category, corrective action and cost in labor, material and equipment, including costs absorbed by subcontractors. The cause categories match those used in the Pejepscot analysis so that the two projects can be compared. Abdul-Rahman (1995), working on a highway project in Malaysia, used a quality cost matrix to make the areas and frequency of nonconformance visible, and found that the information changed how site personnel viewed preventive measures. Merrymeeting's log is intended to do the same: once crews see that a missed flashing lap costs thousands of dollars to reopen, the minutes spent on a check look different.

What this page is doingBuilds the record.
8

Measures

Monthly quality measures

MeasureDefinitionTarget
Rework cost per $1 million of work in placeLogged rework cost divided by value of work billedUnder $12,000, against about $25,000 at Pejepscot
First-time acceptance at hold pointsShare of hold point inspections passed without correction90 percent or better
Openings passing flashing checkShare of openings signed off before window installation100 percent

The first measure is the most important. It puts quality and cost in the same units and allows comparison with Pejepscot's 2.5 percent direct rework.

What this page is doingChooses what to report monthly.
9

Supplier Quality

The panel plant is effectively a subcontractor whose work arrives already closed up, so its quality has to be built in before shipping. The purchase order now requires the plant to check each panel's opening sizes and locations against the approved shop drawings, label every panel with its setting number and load trucks in reverse setting order. Merrymeeting's quality manager will visit the plant before the first load and again after the third floor, and the first panel of each type delivered to site is measured before any are set. Panels that arrive wrong are logged in the same nonconformance system, with the plant's share of the cost charged back, so that the plant's quality record can be compared with that of the site trades.

What this page is doingExtends the plan to the panel plant.
10

Training and Communication

Before production starts, every framing and weather barrier worker will watch the mockup water test and walk the tested opening with both foremen. Hold point checklists will be one page each and kept on tablets. Each Monday coordination meeting will open with the previous week's nonconformances, their causes and costs.

What this page is doingMakes the plan usable.
11

Conclusion

This plan attacks the two failures that cost Merrymeeting most on its last project by placing controls where the risks begin: on the drawings and at the first opening of each type. It also creates the record the company has never had, rework by cause and cost from the first week. Milestone Two will build the productivity side of the system on the same foundations.

What this page is doingLinks the plan to the next milestone.
12

References

Abdul-Rahman, H. (1995). The cost of non-conformance during a highway project: A case study. Construction Management and Economics, 13(1), 23-32. https://doi.org/10.1080/01446199500000004

Arditi, D., & Gunaydin, H. M. (1997). Total quality management in the construction process. International Journal of Project Management, 15(4), 235-243. https://doi.org/10.1016/S0263-7863(96)00076-2

Burati, J. L., Farrington, J. J., & Ledbetter, W. B. (1992). Causes of quality deviations in design and construction. Journal of Construction Engineering and Management, 118(1), 34-49. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(34)

What the MGT 630 Module 5 instructions ask for

Milestone One in MGT 630 typically asks you to develop a quality management approach for a construction project, covering quality planning, quality control processes, inspection and testing, documentation and how quality will be measured and improved. Some versions use a case project; others let you choose. A strong milestone ties every control to a risk the project actually faces, assigns each one to a named role, separates quality assurance, which checks the system, from quality control, which checks the work, and defines measures able to reveal whether the plan is doing its job. It borrows lessons from past failures rather than generic checklists, and it is short enough that a superintendent would actually use it on site.

How this MGT 630 Module 5 milestone one example is built

The sample is Merrymeeting Builders' plan for Cathance Landing, a $31.8 million, 96-unit apartment building over a concrete podium in Topsham, Maine. Built on lessons from the previous job's 212 rework items and 41 leaking windows, it assigns quality ownership from the project manager to each foreman, requires a water-tested mockup of every window and door type, adds a structural and architectural overlay review before panels are fabricated and sets eleven hold points from podium concrete to final air sealing. A nonconformance log records cause and cost from week one, and three monthly measures follow, using Abdul-Rahman's quality cost matrix, Burati and colleagues on design-origin deviations and Arditi and Gunaydin.

Where the MGT 630 Module 5 rubric puts the points

Milestone One quality plans are usually assessed on how well the plan fits the project's risks, the clarity of roles and processes, the inspection and testing approach, documentation and measurement and writing and APA style. Top milestones link each control to a specific risk, name who performs and who verifies it, set hold points where failure would be hidden by later work and choose measures that could reveal a problem early. Points drop for generic plans that could belong to any project, for controls with no owner, for inspection without criteria and for measures that only count paperwork. Instructors also look for a plan that a field team could follow, which usually means tables and short procedures rather than long policy prose.

MGT 630 Module 5 help: the mistakes that cost points

Start with the risks: what went wrong on similar projects, what work will be covered up quickly and what failures would be most expensive. For each risk, decide the control, who does it, who checks it and when. Use mockups for anything new or anything that failed before. Put hold points at moments when later work hides earlier work, such as before sheathing covers framing or drywall covers insulation. Decide how defects will be logged, including cause and cost, so the data can be analyzed later. Pick a few measures you will actually report monthly. Keep the plan concise; a short plan used daily beats a binder no one opens.

Get MGT 630 Module 5 written to your instructions

Bring the MGT 630 Milestone One guidelines and the project you are planning. We write the quality plan around that job's real risks: roles, mockups, coordination reviews, hold points, a nonconformance log and monthly measures. Your first milestone is free and should reach you inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 630 papers and related MS in Management samples

MGT 630 Module 5 questions, answered

Where can I find a free MGT 630 Module 5 Milestone One sample?

The complete MGT 630 Module 5 Milestone One is posted here: a quality management plan for a wood-frame apartment building with mockups and hold points.

What should a construction quality management plan include?

Roles and responsibilities, the controls tied to the project's main risks, inspection and test plans with hold points, documentation of nonconformances and measures that show whether quality is improving.

What is the difference between quality assurance and quality control?

Quality assurance checks that the system for producing quality is in place and followed; quality control inspects and tests the work itself.

What is a hold point in construction inspection?

A point at which work must stop until an inspection or test is completed and accepted, usually because later work would hide what needs to be checked.

Why build a mockup before construction?

A mockup lets the team test materials, sequence and workmanship, such as water resistance at a window, before the detail is repeated hundreds of times.