| Course | SPT 333 Sport, Society, and Ethics |
|---|---|
| Module | Module 7 |
| Paper type | undergraduate final position paper on a sport controversy that states a position, supports it with evidence, stakeholder input and ethical reasoning, answers objections and recommends specific actions with an implementation plan |
| Length | About 1,100 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 333 Module 7
Final Project: Flag First at Allegheny Ridge, a Position Paper to the League Board
[Student Name]
Southern New Hampshire University
SPT 333: Sport, Society, and Ethics
Position Paper
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Final Project: Flag First at Allegheny Ridge, a Position Paper to the League Board
Position
Starting next fall, the Allegheny Ridge board should replace tackle with flag for its four youngest birth years. Players aged 9 and 10 should be offered an optional tackle-readiness program that teaches blocking and tackling technique without full-contact games, and players aged 11 should play a transition season with limited contact before full tackle football from age 12. The league should pair this change with a sliding-scale fee, outreach to families who have left and a code of conduct for adults. This paper explains why, answers the strongest objections and sets out how to carry the change out and judge whether it works.
The Issue in Brief
About 1,900 children from sixteen Monongahela and Youghiogheny valley towns play in the league. Roughly 850 fewer children play than did eight years ago, the youngest divisions shrank fastest, and coverage now costs the league far more than it did before the last three renewals. Families, coaches and physicians disagree about whether young children should tackle. The decision touches health, tradition, choice, community and fairness at once.
The Evidence
Studies of Pennsylvania children the age of ours place most diagnosed concussions on game days rather than at practice, with the 11- and 12-year-olds hurt more often than the youngest. The more troubling evidence concerns repeated impacts during childhood. Among 42 retired professionals examined by Stamm et al. (2015), the men who first tackled before turning 12 scored lower in middle age on planning, recall and reading-based ability tests than men who started later. That study is small, involves elite players and shows association rather than cause. Long-term effects for ordinary youth players remain uncertain. But uncertainty about a serious, lasting harm to developing brains is itself a reason for caution, and Bachynski (2016) argues that physicians and adults have too readily treated such risks to children as acceptable without examining them.
What Stakeholders Said
Current families split close to evenly on the survey, with a modest plurality for change and a sizable undecided group. Departed families were clearer: head injury worries topped their reasons for leaving, cost came second and more than half signaled interest in coming back under a flag format. Coaches worried most about preparing players for tackle at 11 or 12. Both volunteer physicians supported flag. And the young players we interviewed said they valued friends, games and being on a team far more than contact.
The Ethical Case
Milestone Two applied four ethical approaches. Weighing consequences, flag football keeps most of what players value while removing the activity linked to the most uncertain serious harm. The league's duty of care to children in its programs outweighs, at the youngest ages, parents' preference for tackle, though parents' choice deserves respect where risk is lower. Virtue asks the board for the courage to decide and the honesty to explain what is and is not known. An ethic of care centers the children and the families who left. Holt et al. (2017) found that the developmental benefits of youth sport come mainly from the climate adults create, through relationships and life-skill teaching, which flag football can provide as fully as tackle. Coakley (2011) warns that claims about youth sport's benefits are often made without asking who participates and how; the access findings show our cost and safety debates have quietly excluded poorer families.
Answering the Objections
The first objection is tradition: tackle football at a young age is part of who these towns are. That is true, and the recommendation keeps tackle football for ages 12 to 14 and a transition at 11. Tradition is a reason to honor the sport, not a reason to accept an avoidable risk to eight-year-olds.
The second is parental choice. Parents have a right to decide for their children, and the optional tackle-readiness program gives families who value early preparation a structured path at 9 and 10. But a league is not obliged to offer every activity parents might choose, and setting a protective default for the youngest ages is consistent with its duty of care.
The third is preparation for high school. Coaches fear that players who start tackling later will be unprepared and more likely to be hurt. The transition season at 11 and the readiness program address this directly, and high school coaches we interviewed agreed that technique matters more than starting age.
The fourth is the risk of losing players to neighboring tackle leagues. Some families may leave. But the league is already losing players, and the departed-family survey suggests more would return than would leave.
Implementation Plan
Implementation plan
| Action | Responsible | Timing | Cost or effect |
|---|---|---|---|
| Adopt flag rules for ages 7 to 10 and limited-contact rules for age 11 | Board, rules committee | By February vote | Requires two-thirds vote |
| Train coaches in flag football and tackle-readiness teaching | Director of coaching | Summer clinics | About $3,000 for clinicians |
| Redirect equipment: helmets from young divisions to older players | Equipment manager | Spring | Saves about $95 per young player in deposits and reconditioning |
| Sliding-scale fees for eligible families | Treasurer | Next registration | Funded by sponsors and a $15 full-fee increase |
| Outreach to 87 departed families and three poorest towns | Board, coaches | Spring registration | Letters, school visits, van service |
| Adopt the code of conduct for adults | Safeguarding officers | Before August | Training included above |
| Measure enrollment, injuries and satisfaction | Board secretary | Each season | Survey and records |
The change should be explained to families with honesty about the evidence and its limits, in town meetings at each of the 16 towns before the vote, so that families hear the reasons directly rather than through rumor.
Measures and Review
The board should review the change after two seasons using four measures: enrollment for ages 7 to 10, injuries reported at ages 11 and 12 compared with prior years, family satisfaction in the end-of-season survey and the number of returning families from the poorest towns. If injuries at 11 and 12 rise significantly, the transition season should be strengthened. If enrollment falls further, the board should examine why rather than assume the change failed.
Conclusion
Flag football for the league's youngest players protects children from an uncertain but serious risk at the age it may matter most, keeps what young players value about the game and opens the door to families the league has lost, while tackle football remains for older players with a careful transition. It is a decision consistent with the league's duty of care, made openly and with respect for the towns' tradition, and it should be measured honestly after two seasons.
References
Bachynski, K. E. (2016). Tolerable risks? Physicians and youth tackle football. New England Journal of Medicine, 374(5), 405-407. https://doi.org/10.1056/NEJMp1513993
Coakley, J. (2011). Youth sports: What counts as "positive development?" Journal of Sport and Social Issues, 35(3), 306-324. https://doi.org/10.1177/0193723511417311
Holt, N. L., Neely, K. C., Slater, L. G., Camiré, M., Côté, J., Fraser-Thomas, J., MacDonald, D., Strachan, L., & Tamminen, K. A. (2017). A grounded theory of positive youth development through sport based on results from a qualitative meta-study. International Review of Sport and Exercise Psychology, 10(1), 1-49. https://doi.org/10.1080/1750984X.2016.1180704
Stamm, J. M., Bourlas, A. P., Baugh, C. M., Fritts, N. G., Daneshvar, D. H., Martin, B. M., McClean, M. D., Tripodis, Y., & Stern, R. A. (2015). Age of first exposure to football and later-life cognitive impairment in former NFL players. Neurology, 84(11), 1114-1120. https://doi.org/10.1212/WNL.0000000000001358
What the SPT 333 Module 7 instructions ask for
The SPT 333 final project typically asks students to write a position paper or comprehensive analysis of the sport controversy developed in their milestones, taking a reasoned stance and recommending what a sport organization should do. Expect to summarize the issue and evidence, present stakeholder perspectives, apply ethical reasoning, state and defend a position, address counterarguments and propose actions. Strong papers take a clear position early, support it with evidence and ethics rather than opinion, treat opposing views fairly and answer the strongest ones, recommend specific actions the organization can actually take, plan how to implement them and measure results and integrate milestone feedback into one coherent argument. The paper should persuade a reasonable reader on the other side to take it seriously.
How this SPT 333 Module 7 final project example is built
The final project recommends to the board of the Allegheny Ridge Youth Football League, a fictional league of about 1,900 players in western Pennsylvania, that players aged 7 to 10 play flag football from next fall, with an optional non-contact tackle-readiness program at 9 and 10 and a limited-contact season at 11. It summarizes evidence on head impacts and its limits, surveys of 612 current and 87 departed families, interviews, the ethical analysis and access findings, then answers objections on tradition, parental choice, high school readiness and lost players. An implementation plan covers rules, training, equipment savings of about $95 per young player, sliding fees, outreach, a code of conduct and measures. Stamm and colleagues, Bachynski, Holt and colleagues and Coakley are cited.
Where the SPT 333 Module 7 rubric puts the points
Marks on the SPT 333 final project usually go to a clear position stated early, accurate use of evidence with its limits, fair representation of stakeholders, ethical reasoning that supports the position, serious answers to the strongest objections, specific and feasible recommendations, an implementation plan with measures, integration of milestone feedback and professional writing. Papers stand out when an opponent of the position would still say they were treated fairly. They lose points for opinion without evidence, for ignoring or caricaturing opposing views, for recommendations the organization could not carry out or for no plan to measure results. APA references and organized headings complete the grade.
SPT 333 Module 7 help: the mistakes that cost points
State your position in the first paragraph, as a recommendation to someone who can act. Then summarize, briefly, the evidence, what stakeholders said and what your ethical analysis found, using your milestones and fixing anything your instructor questioned. Give the strongest objections a full paragraph each and answer them honestly, conceding what is true. Then turn your position into specific actions: rules, training, money, communication. Plan how to measure whether it worked and when to review it. Write for a reader who disagrees with you. Final papers often restate the milestones; the strongest ones use them as evidence for one clear argument and a plan.
Get SPT 333 Module 7 written to your instructions
Send the SPT 333 final project guidelines, your milestones and instructor comments. A writer turns them into a position paper that states a clear recommendation, supports it with evidence, stakeholder input and ethical reasoning, answers the strongest objections and sets an implementation plan with measures, supported by sport ethics research. The first SPT 333 paper is drafted free, generally within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 333 papers and related BS Sport Management samples
- SPT 333 Module 1 Discussion: Friday Nights in a Mill Town
- SPT 333 Module 2 Issue Analysis Assignment: Head Impacts and Tackling at Eight
- SPT 333 Module 3 Milestone One: The Issue and Its Stakeholders
- SPT 333 Module 4 Discussion: Who Can Afford to Play
- SPT 333 Module 5 Milestone Two: Ethical Theories and the Flag Question
- SPT 333 Module 6 Code of Conduct Assignment: Rules for Adults Who Coach Children
- QSO 360 Module 8 Discussion: Keeping the Gains After the Belts Move On
- FIN 250 Module 5 Insurance Assignment: Protecting a Household With a Baby on the Way
- QSO 320 Module 2 Model Formulation Assignment: Trees, Wreaths and Garland in Symbols
- MKT 337 Module 2 Secondary Data Analysis Assignment: What the Ticketing Records Already Say
SPT 333 Module 7 questions, answered
Where can I find a free SPT 333 Module 7 Final Project sample?
This page holds the complete SPT 333 Module 7 position paper for an invented youth football league.
What is a position paper in sport ethics?
A paper that takes a reasoned stance on a controversy, supports it with evidence and ethical reasoning, answers objections and recommends action.
How should counterarguments be handled in a position paper?
State the strongest objections fairly, concede what is valid and explain why the position still holds or how it adapts.
What makes recommendations in a sport ethics paper feasible?
They fit the organization's authority, budget and people, come with an implementation plan and can be measured.
Should the final project repeat the milestones?
No. Use the milestones as evidence for one integrated argument, revised with instructor feedback.