SPT 461 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This SPT 461 Module 5 Milestone Two sample analyzes an organization's own data to locate the causes of a problem, then develops and compares options against stated criteria. SNHU SPT 461 (SPT-461) uses Milestone Two of the BS Sport Management capstone for analysis. The data come from Brightwater College, an invented Iowa college whose coaches recruit nearly half of each class while many recruits who seldom compete drift away after a year. Interviews with coaches, admissions staff and former athletes explain what the numbers cannot. Three years of records show exactly where prospects slip away and how strongly playing time predicts who comes back.

CourseSPT 461 Seminar in Sport Management (Capstone)
ModuleModule 5
Paper typeundergraduate capstone milestone analyzing an organization's data to locate the causes of a problem, then developing and comparing options for solving it against stated criteria
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Sport Management
UpdatedOctober 2026

Free sample paper for SPT 461 Module 5

1

Milestone Two: Where Recruits Slip Away and Why Athletes Leave

[Student Name]

Southern New Hampshire University

SPT 461: Seminar in Sport Management (Capstone)

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingBrightwater College, its data and figures in this SPT 461 milestone are invented.
2

Milestone Two: Where Recruits Slip Away and Why Athletes Leave

Introduction

Milestone One defined the capstone problem at Brightwater College: coaches recruit fewer athletes than the college needs, about 168 against a target of about 210, and too many of the bench players it does sign walk away after a season. My instructor asked me to look at the recruiting process stage by stage rather than as one number, and to include voices from athletes who left. This milestone presents three years of recruiting, roster and retention data, interviews with coaches, admissions staff and former athletes and four options for addressing the problem.

What this page is doingLinks to Milestone One.
3

The Recruiting Funnel

Combining coaches' spreadsheets with admissions records produced a three-year funnel for recruited athletes.

Recruited-athlete funnel, three-year average

StageNumberShare of previous stage
Inquiries from prospective athletesabout 9,400
Completed recruiting questionnairesabout 3,10033%
Applicationsabout 1,62052%
Admissionsabout 1,25077%
Campus visitsabout 69055% of admitted
Depositsabout 16813% of admitted

Two findings stand out. Campus visits are decisive: admitted athletes who visited deposited at about 24 percent, while those who never visited deposited at about 3 percent. And speed matters: prospects who heard back from a coach within two days of completing a questionnaire went on to deposit at about twice the rate of those contacted later, and about a third of questionnaires received no coach contact for more than two weeks. The admissions director explained why: coaches handle recruiting alongside teaching and coaching, with no shared system, and in-season coaches fall behind.

What this page is doingShows where prospects drop out.
4

Playing Time and Retention

Second-year return by share of contests played, three-year average

Share of team contests playedAthletes per yearReturned for second year
Under 10%about 142about 64%
10% to 50%about 210about 80%
Over 50%about 288about 90%
Under 10%, teams with developmental schedulesabout 31about 79%

Athletes who played in more than half of their teams' contests returned at about 90 percent, those who played rarely at about 64 percent. Among rarely used athletes, those on the three teams that still run developmental or junior varsity schedules returned at about 79 percent, nearly as well as regular players. The pattern held after accounting for first-year grades, which suggests that playing time and participation, not only academics, drive the difference.

What this page is doingShows who leaves.
5

What Former Athletes Said

The counseling center invited departed first-year athletes to talk, and eight accepted. Six said they left mainly because they did not play and felt they were "just a number." Four said they had not been told how large the roster would be. Two described feeling isolated from teammates who played, and one said leaving the team made staying at the college pointless because "the team was why I came." None had used the counseling center while deciding to leave. Gayles and Hu (2009) link student-athletes' engagement with their outcomes, and these accounts describe disengagement in athletes' own words. Moreland et al. (2018) found that college athletes often underuse mental health services, citing stigma and time pressure among the barriers, which matches what these students reported.

What this page is doingExplains the patterns.
6

The Options

Option A raises each team's target and asks coaches to recruit harder, the college's current approach. Option B creates a shared recruiting office: a full-time recruiting coordinator in admissions, recruiting software that coaches and admissions share, a goal of contacting every prospect within two days and an organized campus visit program. Option C adopts roster standards with developmental schedules for large teams and honest disclosure to recruits. Option D adds a women's sport, such as wrestling, which is growing in Midwestern high schools, to add athletes and narrow the gender gap.

What this page is doingDevelops four alternatives.
7

Comparing the Options

Option comparison (scores 1 to 5)

CriterionA: Higher targetsB: Shared recruiting officeC: Roster standards and developmental gamesD: Add a women's sport
Effect on recruited enrollment3524
Effect on retention1353
Cost5332
Gender equity2335
Athlete experience1354
Total12171818

Option A scores worst: higher targets would deepen the roster problem that drives attrition. Options B, C and D each address a different part of the problem, and they work better together than apart. The recruiting office brings in more students, roster standards keep them and a new women's team adds students while narrowing a gap that Anderson et al. (2006) show many colleges struggle to close.

What this page is doingApplies the criteria.
8

What the Data Cannot Show

The analysis has limits worth stating. Coaches' spreadsheets varied in quality, and for two teams the questionnaire dates were missing, so the two-day contact finding rests on 19 of 23 teams. The link between playing time and retention may partly run in the other direction: athletes who are already unhappy or struggling may play less. The interviews reached only eight of about fifty athletes who left in the last year, chosen by their willingness to talk. And the developmental-schedule comparison involves only three teams, all men's teams with large rosters, so the effect may differ for women's teams. None of these limits overturns the main patterns, but each suggests a measure the college should track once changes are made.

What this page is doingNotes limits of the analysis.
9

Cost Estimates for Each Option

Rough costs help the comparison. Option A costs little directly but risks worsening attrition. Option B would cost about $95,000 a year for a recruiting coordinator with benefits, about $14,000 a year for shared recruiting software and about $20,000 for a visit program with meals and overnight hosting. Option C needs roughly $60,000 annually to cover officials, travel and coaching stipends for developmental schedules on four large teams, offset in part by reduced roster costs for equipment. Option D's costs are analyzed in detail in Module 6.

What this page is doingGives rough prices before the final report.
10

Direction for the Final Report

The final report will recommend combining options B, C and D and will test the financial case for adding women's wrestling in detail in Module 6. It will also need to show that roster standards, which reduce some teams' roster sizes, are offset by better retention and recruiting elsewhere.

What this page is doingStates what comes next.
11

Conclusion

Brightwater loses recruits at two points, after questionnaires that go unanswered and among admitted students who never visit, and loses athletes who rarely play, except on teams that give them games. Raising targets would worsen the second problem. A shared recruiting office, roster standards with developmental schedules and a new women's team together address enrollment, retention and equity.

What this page is doingSummarizes the milestone.
12

References

Anderson, D. J., Cheslock, J. J., & Ehrenberg, R. G. (2006). Gender equity in intercollegiate athletics: Determinants of Title IX compliance. The Journal of Higher Education, 77(2), 225-250. https://doi.org/10.1080/00221546.2006.11778925

Gayles, J. G., & Hu, S. (2009). The influence of student engagement and sport participation on college outcomes among Division I student athletes. The Journal of Higher Education, 80(3), 315-333. https://doi.org/10.1353/jhe.0.0051

Moreland, J. J., Coxe, K. A., & Yang, J. (2018). Collegiate athletes' mental health services utilization: A systematic review of conceptualizations, operationalizations, facilitators, and barriers. Journal of Sport and Health Science, 7(1), 58-69. https://doi.org/10.1016/j.jshs.2017.04.009

What the SPT 461 Module 5 instructions ask for

Milestone Two of the SPT 461 capstone turns from defining the problem to testing it with data and generating ways forward. Expect to present findings from the organization's records, surveys or interviews, explain what they show about causes and then propose and evaluate options. Strong milestones show the data clearly in tables, separate patterns from explanations, use interviews to explain rather than replace the numbers, develop several realistic options rather than one favored answer, compare them against criteria that reflect the organization's goals and the interests of those affected and identify which combination looks most promising. Applying feedback from Milestone One shows the capstone maturing.

How this SPT 461 Module 5 milestone two example is built

Milestone Two analyzes three years of data at Brightwater College, a fictional Iowa Division III college. The recruiting funnel runs from about 9,400 inquiries to 1,620 applications, 1,250 admissions and 168 deposits; visitors deposit at about 24 percent against 3 percent for non-visitors, and prospects contacted within two days deposit at about twice the rate of others. Retention rises from about 64 percent for athletes playing in under 10 percent of contests to about 90 percent for those playing in over half, and teams with developmental schedules keep rarely used athletes at about 79 percent. Four options are compared on enrollment, retention, cost, equity and experience. Gayles and Hu, Moreland and colleagues and Anderson and colleagues are cited.

Where the SPT 461 Module 5 rubric puts the points

Milestone Two of SPT 461 typically earns marks for clear presentation of data, findings that identify causes, interviews used to explain patterns, several realistic options, criteria that reflect goals and stakeholders, a fair comparison and a promising direction for the final report, along with use of research and Milestone One feedback. Milestones stand out when the data change the writer's initial assumption. They lose points for data dumps without interpretation, for a single option presented as inevitable, for criteria that ignore people or equity or for options without costs. Tables, APA references and organized writing complete the grade.

SPT 461 Module 5 help: the mistakes that cost points

Present your data in a few clear tables, each answering one question. Write what each table shows in plain words, then use interviews or research to explain why. Be honest about what the data cannot show. Then develop three or four options, including the obvious one and at least one you did not expect to like. Agree on criteria that matter to the organization and to the people affected, such as cost, effect on the problem, fairness and experience, and compare the options against them. End by saying which option or combination looks best and what the final report will need to test. Milestones often jump to the solution the writer had in mind from the start; let the data choose.

Get SPT 461 Module 5 written to your instructions

Share the SPT 461 Milestone Two guidelines, your Milestone One and your data. A writer analyzes the data to locate causes, uses interviews to explain the patterns, develops several options, compares them against clear criteria including equity and the experience of the people affected and sets up the final recommendation, citing relevant research. Your first SPT 461 milestone costs nothing and is typically ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More SPT 461 papers and related BS Sport Management samples

SPT 461 Module 5 questions, answered

Where can I find a free SPT 461 Module 5 Milestone Two sample?

The complete SPT 461 Module 5 Milestone Two analysis for an invented Division III college is on this page.

What is a recruiting funnel?

The stages prospects pass through, such as inquiry, application, admission and deposit, used to see where prospects drop out.

Why do campus visits matter in college recruiting?

Prospects who visit are usually far more likely to enroll, so visit programs are a common focus for improving yield.

How does playing time affect athlete retention?

Athletes who rarely compete often feel less engaged and are more likely to leave, especially without developmental opportunities.

How should capstone options be compared?

Against criteria tied to the organization's goals and stakeholders, such as effect on the problem, cost, fairness and experience.