| Course | SPT 461 Seminar in Sport Management (Capstone) |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate capstone milestone stating the problem precisely, setting objectives, reviewing research relevant to it and describing the data and methods the analysis will use |
| Length | About 1,110 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 461 Module 3
Milestone One: Recruiting Short, Losing Many: The Brightwater Capstone Problem
[Student Name]
Southern New Hampshire University
SPT 461: Seminar in Sport Management (Capstone)
Milestone One
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Milestone One: Recruiting Short, Losing Many: The Brightwater Capstone Problem
Problem Statement
Brightwater College expects its coaches to recruit about 210 students for each entering class of about 480. Last year coaches recruited 168, and the shortfall has grown for three straight years. At the same time, Brightwater loses many of the athletes it does recruit: those who play in fewer than 10 percent of their team's contests return for a second year at about 64 percent, compared with 82 percent of all athletes and 79 percent of non-athletes. The college therefore has two linked problems: it recruits fewer athletes than it needs, and it loses a large share of those it recruits who do not get to play. At about $19,300 in net tuition per student per year, last year's recruiting shortfall cost about $810,000, and the extra attrition among rarely used athletes costs roughly $480,000 more each year.
Significance
The problem matters financially, since athletics is the college's largest single source of new students. It matters to students, who were recruited with the promise of playing their sport and found themselves on rosters too large for them to compete. And it matters for equity: women are 52 percent of Brightwater's students but 44 percent of its athletes, so any changes to rosters and teams must consider gender.
Objectives
Capstone objectives
| Objective | Measure | Current | Target in two years |
|---|---|---|---|
| Close the recruiting gap | Recruited athletes enrolled | 168 | 210 |
| Keep recruited athletes | Second-year return, athletes in under 10% of contests | about 64% | 78% |
| Narrow the gender gap | Women's share of athletes | 44% | 49% |
| Keep academic success | Six-year graduation rate, athletes | 71% | 71% or higher |
What Research Says
Research helps explain why the two halves of the problem are connected. Gayles and Hu (2009) found that student-athletes' engagement, both in their sport and in the wider college, was linked to their outcomes, including learning and personal growth. An athlete who practices every day but never plays may be less engaged in the team and the college than one with a meaningful role, which could explain some of the attrition. Moreland et al. (2018) reviewed research on college athletes' use of mental health services and found that athletes often underuse them because of stigma, time pressure and a sense that seeking help conflicts with athletic identity; disappointment over playing time is one of the experiences such services could help with. Nationally, many colleges fall short of the Title IX proportionality test, and the gap tracks features such as division and football sponsorship (Anderson et al., 2006), which means any changes to teams and rosters at Brightwater must be checked against gender equity.
Research also suggests that recruiting is a process that can be managed. Admissions offices at many colleges track prospects through stages, inquiry, application, admission and deposit, and intervene where students drop out. Brightwater's coaches do not; each tracks prospects alone.
Data and Methods
The analysis will use four sources. First, recruiting records: the athletic director has asked coaches to share three years of recruiting spreadsheets, which will be combined with admissions records to show how many prospects moved through each stage, by team. Second, roster and participation data: rosters and box scores for the last three seasons will show how many athletes played in each team's contests. Third, retention records: the registrar will provide anonymized data on which athletes returned for a second year, linked to playing time and team. Fourth, interviews: I will interview six head coaches, the director of admissions and, through the counseling center's invitation, up to eight former athletes who left after one year. The analysis will compare recruiting funnels across teams, examine the relationship between playing time and retention while accounting for team and academic profile and identify patterns in the interviews.
How the Problem Developed
The current situation grew over about a decade. When enrollment first softened, the college asked coaches to help, and recruiting targets for each team were set by dividing the college's enrollment gap among teams according to roster size. Teams with large rosters, such as football and soccer, received the largest targets, and coaches met them by adding players rather than by adding opportunities to compete. Junior varsity programs that once gave younger players games were cut in a budget year and never restored. Meanwhile, recruiting remained a task each coach handled alone, alongside teaching and coaching duties, with no shared tools or training. The targets kept rising as enrollment pressure grew, while the methods stayed the same. Understanding this history matters because it shows the problem is not a matter of coaches failing to work hard; it is a system that asks them to recruit in ways that undercut the experience they are recruiting students into.
Ethical Considerations
The problem contains an ethical tension that the capstone must address directly. The college has an interest in large rosters because each athlete pays tuition, but athletes have an interest in a meaningful chance to compete, which was part of why they chose Brightwater. A solution that simply recruits more athletes onto already crowded rosters might help enrollment in the short term and harm students. All data will be anonymized, interviews will be voluntary and reported without names and no individual coach's recruiting performance will be identified in the final report.
Early Conversations
Two early conversations already sharpen the problem. The head coach of men's soccer explained that the team's target of 18 new players a year was set when the roster was 30, and that meeting it now means carrying more than 40 players with no junior varsity schedule. The coach described the conversation with a recruit's family about playing time as the hardest part of the job. The director of admissions said that admissions counselors cannot see which recruits coaches are in contact with, so recruited students sometimes receive generic mailings that contradict what coaches have told them. Both conversations point to the same conclusion as the numbers: the recruiting system and the roster system are connected, and neither is designed with the student's experience in mind.
Limitations
Playing time is not the only reason athletes leave; family finances, academics and homesickness also matter, and the data cannot fully separate these causes. Recruiting spreadsheets differ by coach, so some will be incomplete. The analysis covers three years, which may not reflect future demographic changes.
Conclusion
Brightwater misses its recruiting target and loses many of the athletes who rarely play, problems that cost the college about $1.3 million a year and shortchange students who came to compete. Research on engagement, mental health support and Title IX helps explain the connections. Milestone Two will analyze recruiting, roster and retention data and develop options.
References
Anderson, D. J., Cheslock, J. J., & Ehrenberg, R. G. (2006). Gender equity in intercollegiate athletics: Determinants of Title IX compliance. The Journal of Higher Education, 77(2), 225-250. https://doi.org/10.1080/00221546.2006.11778925
Gayles, J. G., & Hu, S. (2009). The influence of student engagement and sport participation on college outcomes among Division I student athletes. The Journal of Higher Education, 80(3), 315-333. https://doi.org/10.1353/jhe.0.0051
Moreland, J. J., Coxe, K. A., & Yang, J. (2018). Collegiate athletes' mental health services utilization: A systematic review of conceptualizations, operationalizations, facilitators, and barriers. Journal of Sport and Health Science, 7(1), 58-69. https://doi.org/10.1016/j.jshs.2017.04.009
What the SPT 461 Module 3 instructions ask for
The SPT 461 Milestone One assignment typically asks students to define the problem their capstone will address, explain its significance, review relevant literature and describe how they will analyze it. Expect to write a clear problem statement, set objectives, summarize research that informs the problem and outline data sources and methods. Strong milestones state the problem in measurable terms, explain its cost to the organization and to people, connect it to research rather than opinion, set objectives that can be checked, describe data the student can actually obtain and how it will be analyzed and acknowledge ethical issues or limitations early. Applying feedback from the situation analysis shows the project developing.
How this SPT 461 Module 3 milestone one example is built
Milestone One states the problem at Brightwater College, a fictional Iowa college: coaches recruited 168 athletes against a target of about 210, and athletes who play in fewer than 10 percent of contests return at about 64 percent compared with 82 percent for all athletes, so the college misses its goal and loses many recruits. Objectives cover the recruiting gap, retention of rarely used athletes and the gender gap. Research on athletics and applications, engagement, mental health support and Title IX is reviewed, and data are described: three years of recruiting spreadsheets with admissions records, rosters and playing time, retention and interviews. The ethical tension between enrollment and athletes' experience is noted. Gayles and Hu, Moreland and colleagues and Anderson and colleagues are cited.
Where the SPT 461 Module 3 rubric puts the points
Milestone One of SPT 461 is generally graded on a precise, measurable problem statement, an explanation of significance, objectives that can be checked, a review of relevant research that informs the problem, a realistic plan for data and methods, attention to ethics and limitations and use of earlier feedback. Milestones stand out when the problem statement reframes the issue in a way the organization had not seen. They lose credit for problems stated as solutions, for objectives without numbers, for literature reviews unconnected to the problem or for data plans that depend on information the student cannot get. Clear headings, APA references and concise writing complete the grade.
SPT 461 Module 3 help: the mistakes that cost points
State the problem in two or three sentences with numbers: what is happening, what should be happening and what the gap costs. Explain why it matters to the organization and to the people involved. Set three or four objectives you could check later. Review a handful of studies that help explain the problem, saying what each means for your project. Describe exactly what data you will use, where it comes from and how you will analyze it, and whom you will interview. Mention ethical issues and limitations now. Milestones often describe a problem and a solution at once; save the solution until your analysis supports it.
Get SPT 461 Module 3 written to your instructions
Share the SPT 461 Milestone One guidelines and your capstone topic. A writer states the problem precisely with evidence, sets measurable objectives, reviews relevant research, describes the data and methods for the analysis and notes ethical issues to watch, giving later milestones a solid base. The first SPT 461 milestone is drafted free of charge, typically inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 461 papers and related BS Sport Management samples
- SPT 461 Module 1 Discussion: Choosing a Problem in a Small Athletics Department
- SPT 461 Module 2 Situation Analysis Assignment: Brightwater Athletics, Inside and Out
- SPT 461 Module 4 Discussion: Rosters Filled for Enrollment
- SPT 461 Module 5 Milestone Two: Recruiting and Retention Data and Options
- SPT 461 Module 6 Financial Analysis Assignment: Adding Women's Wrestling
- QSO 370 Module 3 Project One: A Run-Out Risk Model
- HRM 200 Module 4 Discussion: Should the Brewery Post Its Pay Ranges?
- QSO 349 Module 8 Discussion: A Losing Shipyard's Protest
- BUS 225 Module 3 Data Analysis Assignment: Reading a Year of Service Records
SPT 461 Module 3 questions, answered
Where can I find a free SPT 461 Module 3 Milestone One sample?
This page carries the complete SPT 461 Module 3 Milestone One for an invented Division III recruiting capstone.
What goes in SPT 461 Milestone One?
A precise problem statement, its significance, objectives, a review of relevant research and the data and methods the capstone will use.
How specific should a capstone problem statement be?
Specific enough to measure: it should state the current situation, the desired situation and the cost of the gap, with numbers.
Why review research in a sport management capstone?
Research explains causes, suggests what has worked elsewhere and keeps the analysis from resting on opinion.
Should I propose solutions in Milestone One?
Generally no; define the problem and plan the analysis first, so the solution grows from the evidence.