| Course | SPT 600 Management of Sport Organizations |
|---|---|
| Module | Module 7 |
| Paper type | graduate discussion post analyzing organizational culture through its artifacts, values and underlying assumptions after harassment of women players and creators, and proposing changes that reach the culture's foundations |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Sport Management |
| Updated | October 2026 |
Free sample paper for SPT 600 Module 7
Module Seven Discussion
Our Values Were on the Wall
Last month two women on Copperline Esports' creator roster and one player on our fighting game team told our people operations lead about months of sexist abuse from fans in our own chat channels, and about dismissive comments from two male staff members. Each had complained to a manager before. Nothing changed. Our website says we are "an inclusive home for every player." Clearly, that is not what we have built.
Schein (1990) treats culture as layered. On top sit the things anyone can see; beneath them, the values an organization says it holds; at the bottom, assumptions so familiar that nobody questions them. Looking at ours is uncomfortable. Our artifacts include chat channels with no paid moderation, an all-male coaching staff and in-jokes in team videos that mock "tilted" players as weak. Our espoused value is inclusion. Our underlying assumption, the one that actually guides behavior, seems to be that toxicity is part of gaming and that people who complain are not tough enough. When a value on the wall contradicts an assumption in the room, the assumption wins.
This is not unique to us. Ruvalcaba et al. (2018) found that women playing competitive games received more negative and sexist feedback from peers and spectators than men did. Darvin et al. (2020) examined esports participants' experiences and found evidence of treatment discrimination and hostility, especially toward women. A company that does nothing inherits the wider culture of the game.
Training alone will not change what people take for granted. I would propose five changes: paid moderators for all company channels, with published rules and enforced bans; a reporting route to the people operations lead and an outside adviser, not only to line managers; real consequences for staff, including the two named, after a fair investigation; recruiting women into coaching and production roles, so the people with visible authority change; and a public statement from our leaders saying exactly what will no longer be tolerated, followed by acting on it.
How would you know whether an organization's culture had actually changed, rather than only its statements?
References
Darvin, L., Vooris, R., & Mahoney, T. (2020). The playing experiences of esport participants: An analysis of treatment discrimination and hostility in esport environments. Journal of Athlete Development and Experience, 2(1), Article 3. https://doi.org/10.25035/jade.02.01.03
Ruvalcaba, O., Shulze, J., Kim, A., Berzenski, S. R., & Otten, M. P. (2018). Women's experiences in eSports: Gendered differences in peer and spectator feedback during competitive video game play. Journal of Sport and Social Issues, 42(4), 295-311. https://doi.org/10.1177/0193723518773287
Schein, E. H. (1990). Organizational culture. American Psychologist, 45(2), 109-119. https://doi.org/10.1037/0003-066X.45.2.109
What the SPT 600 Module 7 instructions ask for
The SPT 600 culture discussion often asks students to examine organizational culture in a sport organization, how it forms, how it shapes behavior and how leaders can change it, sometimes in light of a problem such as harassment, hazing or misconduct. Expect to apply a model of culture to an example. Strong posts look beyond stated values to what the organization actually rewards and tolerates, distinguish visible artifacts from espoused values and underlying assumptions, use research on the specific issue, and propose changes to systems, consequences and leadership behavior rather than new slogans. They take the experiences of the people harmed seriously. Replies should question whether classmates' proposed changes would reach the assumptions that drive behavior.
How this SPT 600 Module 7 discussion example is built
The post examines the culture of Copperline Esports, a fictional Columbus, Ohio company, after two women creators and a woman player described sexist abuse in the company's chat channels and dismissive comments from two male staff, with complaints ignored. Three levels of culture show posted inclusion values contradicted by unmoderated chats, all-male coaching staff and in-jokes, and by an assumption that toxicity is part of gaming. Research on women's experiences and hostility in esports supports the analysis. Proposals include paid moderation with bans, reporting outside the line manager, staff consequences, women in coaching and production and public leadership commitments. Schein, Ruvalcaba and colleagues and Darvin and colleagues are cited.
Where the SPT 600 Module 7 rubric puts the points
Grading for the SPT 600 culture thread typically rewards analysis at several levels of culture, evidence of what the organization rewards and tolerates, accurate use of research on the issue, respect for those harmed, changes to systems, consequences and leadership rather than slogans and replies that test whether proposals reach deep assumptions. Posts gain credit when they show the gap between stated and enacted values. They lose points for treating culture as values statements, for blaming individuals alone, for downplaying harm or for no sources. Two APA citations and constructive replies complete the grade, written with care for the people whose experiences prompted the post and with an honest account of the organization's own part in the problem.
SPT 600 Module 7 help: the mistakes that cost points
Look at what people in the organization see, hear and do every day: what gets celebrated, what jokes are told, who holds which jobs, what happens after a complaint. Compare that with the values the organization states. The gap points to the assumptions that really guide behavior. Use research to understand the specific problem rather than relying on impressions. Then ask what would change those assumptions: new systems, real consequences, different people in visible roles, leaders who act consistently. Posts often recommend training; the stronger ones change what is rewarded and tolerated, and they explain how anyone, including the people who were harmed, will see whether the culture moved.
Get SPT 600 Module 7 written to your instructions
Paste the SPT 600 Module 7 prompt and describe the culture you want to examine. A writer analyzes it at the level of artifacts, values and assumptions, connects it to research, proposes changes that reach beneath posted values and asks classmates how real culture change could be recognized, with APA sources. Your first SPT 600 post is free, typically ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More SPT 600 papers and related MS Sport Management samples
- SPT 600 Module 1 Discussion: Is an Esports Company a Sport Organization?
- SPT 600 Module 2 Organizational Structure Assignment: A Structure That Outgrew Its Founder
- SPT 600 Module 3 Strategy Assignment: What Copperline Does Better Than Anyone
- SPT 600 Module 4 Discussion: Players Who Burn Out at 22
- SPT 600 Module 5 Human Resource Assignment: Pay, Contracts and Turnover
- SPT 600 Module 6 Leadership Assignment: Leading After the Founder
- SPT 600 Module 8 Organizational Change Assignment: Restructuring for 2028
- SPT 600 Module 9 Final Project: The Management Plan
- SPT 600 Module 10 Discussion: The Betting Sponsor
- ACC 691 Module 1 Discussion: Why Executives Misstate Results
- MGT 600 Module 4 Personnel Planning Assignment: Fourteen Empty Seats in the Cab
- QSO 690 Module 8 Maintenance Analytics Assignment: Predicting Laser Cutter Failures
- MGT 605 Module 10 Final Project: The Complete Bid Proposal
SPT 600 Module 7 questions, answered
Where can I find a free SPT 600 Module 7 Discussion sample?
The full SPT 600 Module 7 post on culture and harassment at an invented Columbus esports company is on this page.
What are the levels of organizational culture?
Visible artifacts, espoused values and beliefs, and underlying assumptions that people take for granted and rarely question.
Why do stated values fail to change behavior?
When artifacts, rewards and deep assumptions contradict them, people follow what the organization actually does rather than what it says.
What do women experience in competitive gaming?
Research finds women often receive more negative and sexist feedback from peers and spectators than men do.
How can a sport organization change a harmful culture?
By changing systems, consequences, who holds visible roles and how leaders act, so that new behavior is rewarded and old behavior is not tolerated.