CSR 610 Module 9 Milestone Three Example

Reviewed by Portia Lambrick, MBA

This CSR 610 Module 9 Milestone Three sample plans how an organization's leaders can change its culture using the levers they actually control. SNHU CSR 610 (CSR-610) places this third milestone in Module Nine of the MS Management course. A composite contract supplement manufacturer in Ogden, Utah has an assessment showing a culture that puts output first, new compliance commitments and a redesigned program. The paper identifies the leadership levers that shape culture, from what leaders pay attention to and how they react when a line is stopped to rewards, promotions and stories, sequences changes over eighteen months, plans for resistance from supervisors and the owner, and sets behavioral measures.

CourseCSR 610 Business Ethics and Culture
ModuleModule 9
Paper typegraduate milestone planning organizational culture change
LengthAbout 1,000 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Management
UpdatedOctober 2026

Free sample paper for CSR 610 Module 9

1

Culture Change Plan

[Student Name]

Southern New Hampshire University

CSR 610: Business Ethics and Culture

Milestone Three

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe plan is named for what it must accomplish.
2

Culture Change Plan

Introduction

The Milestone One assessment found that the company's culture puts output first: supervisors are paid on units shipped, quality reports to production, people fear raising concerns and leaders praise speed. Milestone Two set four commitments to stakeholders, and the Module Eight program redesigned compliance. This milestone plans how to change the culture so that those commitments are kept. It focuses on the levers leaders control, sequences the changes over eighteen months, plans for resistance and sets measures.

What this page is doingFrom diagnosis to change.
3

The Culture Wanted

The desired culture can be stated simply: output done right. In practice that means records completed when the work is done, any failed test investigated before a retest counts, anyone free to stop a line for a quality or safety concern without blame, and leaders who ask how a number was achieved as often as whether it was achieved. Kish-Gephart et al. (2010) found that the organizational environment shapes unethical choices alongside individual traits, so the plan aims at the environment rather than at finding better people.

What this page is doingOutput done right.
4

The Levers

Schein (2010) identifies the main ways leaders embed culture: what they regularly pay attention to, measure and control; how they react to critical incidents; how they allocate resources; what they deliberately model and teach; how they allocate rewards and status; and how they recruit, promote and remove people. The plan uses each.

Culture change levers and actions

LeverTodayChange
AttentionMorning meeting starts with outputStarts with retest rate, open investigations and record audit results
Reaction to incidentsLine stops treated as problemsFirst stop under new rules publicly thanked
ResourcesLab understaffed, falls behindTwo analysts added
Role modelingExecutives absent from floorWeekly walk with quality questions
RewardsSupervisor bonus on units only30 percent on record accuracy and safety
PromotionBased on output recordsRequires clean record audit
StoriesRecord-breaking shiftsPeople who did right at a cost
What this page is doingHow leaders shape culture.
5

Phasing

In the first six months, the changes that leaders control directly take effect: the morning meeting agenda, the weekly floor walks, the two new analysts and the new bonus formula from the next quarter. The early win is designed to be visible. When the first supervisor or technician stops a line under the new rules, the plant manager will thank that person at the next shift meeting and the chief executive will mention it at the town hall. Kotter (2012) argues that short-term wins give a change effort credibility and momentum, and a public thank-you for stopping the line will be talked about across both shifts.

In months seven to twelve, promotion criteria change, the role-based training from the compliance program reaches all supervisors and analysts, and the town halls begin each time with a story of someone who did the right thing. In months thirteen to eighteen, the culture survey is repeated, the results are shared openly with employees, and adjustments are made where the survey shows little change.

What this page is doingA year and a half, step by step.
6

Supporting Supervisors

The twenty-two shift supervisors carry the change on the floor, and most of them were promoted because they hit output numbers under the old rules. Asking them to slow a line or report a failed test without giving them help would set them up to fail. Before any bonus depends on record audits, each supervisor will get a two-day workshop on the new batch record system, a quality analyst assigned as a partner for the first quarter and a weekly fifteen-minute review with the plant manager focused on obstacles rather than blame. Supervisors will also be asked what gets in their way. Early interviews suggest the answer will include the paper forms that slow recording and the staffing gaps on the night shift, and fixing even one of those quickly will show that leaders are listening.

What this page is doingHelp before judgment.
7

Communication

Employees have heard values talk before, and the survey suggests they discount it. The plan therefore keeps announcements short and lets actions carry the message. The chief executive will explain the changes once, at a town hall on both shifts, and then report each quarter on what has actually happened, including setbacks. Posters and slogans are left out on purpose. Schein (2010) notes that when what leaders say conflicts with what they do, people believe the behavior, so the plan spends its effort on making behavior and words line up.

What this page is doingShowing more than telling.
8

Resistance

Shift supervisors stand to give up the most at first: their bonuses will depend partly on record audits they currently fail, and their status came from hitting output targets. The plan addresses this by phasing the bonus change from the next quarter, giving supervisors time and support to clean up records, and by involving two respected supervisors in designing the audit. The private equity owner may worry that slower lines will reduce growth before a planned sale. The case to the owner is financial: the retailer's paused orders, worth $14 million, showed that the old culture was already costing growth, and a buyer will value clean audits. Some long-serving employees may doubt that anything will change; the early win and the floor walks are aimed at them.

What this page is doingWhere pushback is likely.
9

Measures

Progress will be measured by behavior rather than activity. Every quarter the plan tracks how often the lab reruns a sample, what fraction of out-of-specification results get a finished investigation, how each shift scores on record audits, the number of line stops for quality or safety, reports raised through any channel and time to resolve them. The culture survey from Milestone One will be repeated at twelve and eighteen months, with targets of reducing the share of employees afraid to raise a concern from 38 percent to under 20 percent and raising agreement that supervisors care how results are achieved above 60 percent.

What this page is doingTracking behavior.
10

Conclusion

The plan changes what leaders look at first, how they respond when someone stops a line, where they put money, whom they promote and what stories they tell. Phased over eighteen months, anchored by a visible early win and measured by behavior, it aims to make output done right the company's real culture rather than a phrase in the handbook.

What this page is doingThe plan summarized.
11

References

Kish-Gephart, J. J., Harrison, D. A., & TreviƱo, L. K. (2010). Bad apples, bad cases, and bad barrels: Meta-analytic evidence about sources of unethical decisions at work. Journal of Applied Psychology, 95(1), 1-31. https://doi.org/10.1037/a0017103

Kotter, J. P. (2012). Leading change. Harvard Business Review Press.

Schein, E. H. (2010). Organizational culture and leadership (4th ed.). Jossey-Bass.

What the CSR 610 Module 9 instructions ask for

Milestone Three in CSR 610 usually asks you to develop a plan for changing the organization's ethical culture, building on the assessment and the stakeholder analysis. Guidelines commonly ask for the desired culture, the specific changes, the role of leaders, a timeline, how resistance will be addressed and how progress will be measured. Strong plans focus on what leaders do and reward, not only on new policies, and they sequence changes so that early, visible results build credibility. They anticipate who will resist and why, and they measure changes in behavior rather than counting activities such as training sessions. Many prompts also ask how the plan connects to the risks named in the earlier milestones, so tie each initiative back to a specific finding.

How this CSR 610 Module 9 milestone three example is built

The plan begins with the desired culture: output that is done right, where anyone can stop a line and records are completed when work is done. It uses the levers through which leaders shape culture. The plant manager's morning review will start with quality and records before output. Leaders will publicly thank the first person who stops a line under the new rules. Budget will add two lab analysts so the lab can keep up. Promotion to supervisor will require a clean record audit, and town halls will tell stories about integrity. Changes are phased over eighteen months, with resistance from supervisors and the private equity owner addressed directly, and measures include the retest rate and the share of employees afraid to speak up. Supervisors receive training and an analyst partner before any part of their bonus depends on record audits.

Where the CSR 610 Module 9 rubric puts the points

Grading for the culture change plan typically considers the clarity of the desired culture, the use of leadership levers and change research, the specificity of initiatives, sequencing and early wins, the treatment of resistance, measurement and connection to earlier milestones. Strong plans make leaders' daily behavior the center of change, align rewards and resources with the stated values, show visible early results and measure behavior over time. Plans lose credit for relying on training and communication alone, for ignoring incentives and structure, for skipping resistance and for measuring activity instead of change. Reviewers also look for a timeline that is realistic for the organization's size and for honest acknowledgment of what the plan cannot change quickly.

CSR 610 Module 9 help: the mistakes that cost points

Culture plans often list communications, training and a new values statement. Those matter less than what leaders pay attention to, how they react in a crisis and what they reward. Design changes around those levers. Plan an early win that people will see and talk about. Name the groups likely to resist and what they stand to lose, and address it. Measure what people do, such as how often lines are stopped or tests are investigated, and repeat the culture survey to see whether fear is falling. Finally, say who owns each initiative, because a plan with no named owner tends to stall after the first announcement.

Get CSR 610 Module 9 written to your instructions

Share your CSR 610 Milestone Three prompt plus Milestones One and Two. Your sample will use the levers leaders control, sequence changes with early wins, address resistance and set behavioral measures. About two days; a first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More CSR 610 papers and related MS Management samples

CSR 610 Module 9 questions, answered

Where can I find a free CSR 610 Module 9 Milestone Three sample?

This page includes the complete CSR 610 Milestone Three culture change plan for a supplement manufacturer.

How do leaders change organizational culture?

Mainly through what they consistently pay attention to and measure, how they react to crises, how they allocate resources and rewards, whom they promote and what they model, more than through statements.

Why are early wins important in culture change?

Because visible early results show that the change is real, build support and counter skepticism that new values are just words.

How should resistance to culture change be handled?

By identifying who stands to lose what, involving them, adjusting incentives that conflict with the change and showing early that the change works.

How can culture change be measured?

Through repeated surveys and through behavioral indicators, such as reports raised, lines stopped, investigations completed and audit results.